ND-22-0145, ITAAC Closure Notification on Completion of 2.1.03.12 (Index Number 087)

From kanterella
(Redirected from ML22059B066)
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of 2.1.03.12 (Index Number 087)
ML22059B066
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/28/2022
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 2.1.03.12, ND-22-0145
Download: ML22059B066 (6)


Text

Michael J. Yox 7825 River Road Sk.Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tel FEB 2 8 2022 Docket No.: 52-025 ND-22-0145 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of 2.1.03.12 [Index Number 0871 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC)of the completion of Vogtle Electric Generating Plant(VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.1.03.12 [Index Number 087].

This ITAAC confirms that safety-related displays identified in Table 2.1.3-1 can be retrieved in the Main Control Room (MCR). The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted.

Michael J. Yox JI Regulatory Affairs Direc/or Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.1.03.12 [Index Number 87]

MJY/DCH/sfr

U.S. Nuclear Regulatory Commission ND-22-0145 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III Mr. D. L. McKlnney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 Nuclear Regulatory Commission Ms. M. Bailey M . M. King M G. Bowman Ms. A. Veil M . C. P. Patel M G. J. Khouri M . C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Welch M J. Gaslevic M O. Lopez-Santiago M G. Armstrong M M. Webb M T. Fredette M C. Santos M B. Davis M J. Vasquez M J. Eargle M T. Fanelli Ms. K. McCurry M J. Parent M B. Griman M V. Hall

U.S. Nuclear Regulatory Commission ND-22-0145 Page 3 of 3 Qqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani Mr. D. 0. Durham Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-22-0145 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-22-0145 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.1.03.12[index Number 087]

U.S. Nuclear Regulatory Commission ND-22-0145 Enclosure Page 2 of 3 ITAAC Statement Desion Commitment

12. Safety-related displays of the parameters identified in Table 2.1.3-1 can be retrieved in the MCR.

Inspections/Tests/Analvses Inspection will be performed for retrievability of the safety-related displays in the MCR.

Acceptance Criteria Safety-related displays identified in Table 2.1.3-1 can be retrieved in the MCR.

ITAAC Determination Basis An inspection was performed to verify the retrievability of the Vogtle Electric Generating Plant(VEGP)

Unit 3 plant parameters in the Main Control Room (MCR). The inspection for retrievability confirms that the safety-related displays of the parameters identified in COL Appendix C Table 2.1.3-1 (Attachment A)can be retrieved in the MCR.

The inspection was performed in accordance with the Unit 3 component test package work order documented in Reference 1 for Reactor System (RXS)component indication verifications, and visually confirmed that when each of the displays of the parameter identified in Attachment A were summoned at the MCR Primary Dedicated Safety Panel (PDSP), the summoned plant parameter appeared on a safety-related display at that PDSP workstation.

The Unit 3 component test results documented in Reference 1 confirm that the VEGP Unit 3 plant parameter safety-related displays listed in Attachment A can be retrieved in the MCR.

Reference 1 is available for NRC inspection as part of the Unit 3 ITAAC 2.1.03.12 Completion Package (References 2).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.1.03.12 was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References favaiiabie for NRC inspection)

1. SV3-RXS-ITR-800087, Rev 0,"Unit 3 Test Results of RXS Safety-Related Displays in MCR:

ITAAC 2.1.03.12, NRC Index Number: 87'

2. 2.1.03.12-U3-CP-Rev0, ITAAC Completion Package

U.S. Nuclear Regulatory Commission ND-22-0145 Enclosure Page 3 of 3 Attachment A Safety-Related Displays of RXS Parameters in the MGR Equipment Name* Tag No.* Safety-Related Display*

Intermediate Range RXS-JE-NE002A / NE002B / NE002C / NE002D Yes Detectors(4)

^Excerpt from COL Appendix C Table 2.1.3-1