|
---|
Category:Letter
MONTHYEARML24281A0622024-10-0808 October 2024 Examination Confirmation Letter No. 50-123/Ol-25-01 Missouri University of Science and Technology ML24221A2882024-08-0808 August 2024 Follow-Up Report on EN-57239, Deviation from 10 CFR 50.54(k) and Missouri S&T Reactor (R-79) Technical Specification 6.1.3.1.a) IR 05000123/20242012024-07-0101 July 2024 Board of Curators of the University of Missouri – U.S. Nuclear Regulatory Commission Safety Inspection Report 05000123/2024201 ML24151A6642024-05-30030 May 2024 Submittal of 2023-2024 Annual Progress Report for Missouri University of Science and Technology Reactor ML24018A1112024-01-19019 January 2024 Board of the Curators of the University of Missouri – Change of Facility Backup Project Manager ML24017A1662024-01-18018 January 2024 Examination Confirmation Letter No. 50-123/Ol-24-02, Missouri University of Science and Technology (Must) ML23349A2062023-12-15015 December 2023 Missouri University of Science and Technology Reactor (Mstr), Follow-Up Report on EN-56878, Reportable Occurrence ML23311A0722023-12-12012 December 2023 Examination Report Letter No. 50-123/OL-24-01, Missouri University of Science and Technology ML23222A2202023-08-10010 August 2023 Examination Confirmation Letter No. 50-123/OL-24-01, Missouri University of Science and Technology IR 05000123/20232012023-08-0202 August 2023 Board of Curators of the University of Missouri - Us Nuclear Regulatory Commission Safety Inspection Report No. 05000123/2023201 ML23145A2542023-05-23023 May 2023 2022-2023 Annual Progress Report for Missouri University of Science and Technology Reactor ML23114A0772023-04-24024 April 2023 Examination Result Letter No. 50-123/OL-23-01, Missouri University of Science and Technology ML23114A0762023-04-24024 April 2023 Examination Report No. 50-123/OL-23-01, Missouri University of Science and Technology ML23040A3902023-03-13013 March 2023 Examination Confirmation Letter No. 50-123/OL-23-01, Missouri University of Science and Technology ML22280A1742022-10-31031 October 2022 Examination Confirmation Letter No. 50-123/OL-23-01, Missouri University of Science and Technology ML22298A3032022-10-17017 October 2022 Level 1 Personnel Change at the Missouri University of Science and Technology Reactor ML22235A7872022-08-23023 August 2022 Missouri & T Reactor, Response to Notification of Violation and Inspection Report 05000123/2022002 IR 05000123/20222022022-07-25025 July 2022 Board of Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000123/2022202 and Notice of Violation ML22150A0072022-05-30030 May 2022 Submittal of 2021-2022 Annual Progress Report for the Missouri University of Science and Technology Reactor ML22098A2232022-05-0505 May 2022 Board of Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Security Inspection Report (Cover Letter) ML22018A3062022-02-0101 February 2022 Examination Confirmation Letter No. 50-123/OL-22-02, Missouri University of Science and Technology ML21330A0462022-01-21021 January 2022 Board of Curators of the University of Missouri Issuance of Amendment No 23 to Renewed Facility Operating License No R-79 ML21292A3342021-10-18018 October 2021 Missouri & T Reactor, Follow-Up Report on and Retraction of EN-55509, Reported Violation of Technical Specification (Limiting Condition of Operation) 3.3.2 ML21257A1192021-09-23023 September 2021 Board of the Curators of the University of Missouri - Change of Facility Project Manager ML21203A0762021-07-28028 July 2021 Examination Confirmation Letter No. 50-123/OL-22-01, Missouri University of Science and Technology IR 05000123/20210012021-06-28028 June 2021 Missouri University of Science and Technology (Ms&T) Routine Safety Inspection 50-123/2021-01 ML21153A4322021-06-0202 June 2021 Missouri & T Reactor - Follow-Up Report on Violation of Technical Specification (Surveillance Requirement) 4.6.2(1), EN-55266 ML21134A2452021-05-14014 May 2021 Missouri Univ. of Science & Technology, Self-Identified Violation of Operator Requalification Program 2.2 ML21039A3422021-02-0808 February 2021 Examination Confirmation Letter No.50-123/OL-21-01, Missouri University of Science and Technology ML21005A0272021-01-25025 January 2021 Must Amendment No 23 Acceptance Review - Application Accepted 12-28-2020 (6) ML20337A1622020-12-0202 December 2020 Proposed License Amendment Request for Missouri University of Science and Technology Reactor (License R-79, Docket 50-123) ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20314A3622020-11-12012 November 2020 Board of the Curators of the University of Missouri - Issuance of Amendment No. 22 to Renewed Facility Operating License No. R-79 to Extend the Period to Perform Visual Inspections of the Shim/Safety Rods ML20309A6762020-11-0404 November 2020 Missouri University of Science and Technology - Written Communication as Specified by 10 CFR 50.4 Requesting Approval of an Exigent Amendment to the Technical Specifications Appended to Facility Operating License R-79 IR 05000123/20202012020-09-28028 September 2020 Missouri University of Science and Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000123/2020201 ML20150A6062020-05-29029 May 2020 Missouri Univ. of Science & Technology - Submittal of 2019-2020 Annual Progress Report for Missouri University of Science and Technology Reactor ML20006C9282019-12-23023 December 2019 Examination Confirmation Letter No. 50-123/OL-20-02, Missouri University of Science and Technology ML19347B2142019-12-23023 December 2019 Examination Report No. 50-123/OL-20-01, Missouri University of Science and Technology ML19304B7332019-11-0505 November 2019 Examination Confirmation Letter No. 50-123/OL-20-01, Missouri University of Science and Technology ML19206A3642019-07-25025 July 2019 Examination Confirmation Letter No. 50-123/OL-19-02, Missouri University of Science and Technology IR 05000123/20192012019-07-0303 July 2019 Missouri University of Science and Technology - U.S. Nuclear Regulatory Commission Inspection Report No. 50 123/2019-201 ML19182A3592019-07-0101 July 2019 Level 1 Personnel Change at the Missouri University of Science and Technology Reactor ML19149A6242019-05-29029 May 2019 Missouri s & T Reactor - 2018-2019 Annual Progress Report for Missouri University of Science and Technology Reactor ML19010A0822019-01-17017 January 2019 Washington State University - Change of Facility Project Manager ML19028A2942019-01-17017 January 2019 Level III Personnel Change at the Missouri University of Science and Technology Reactor Facility, License R-79, Docket 50-123 ML18365A3532019-01-0808 January 2019 Missouri University of Science and Technology - Change of Facility Project Manager IR 05000123/20182022018-12-26026 December 2018 Missouri University of Science and Technology - U.S. Nuclear Regulatory Commission Security Inspection Report 05000123/2018202 (Cover Letter) ML18276A2842018-09-28028 September 2018 Missouri S&T Reactor - Submittal of Updated Operator Requalification Program ML18257A1372018-09-14014 September 2018 Missouri University of Science and Technology Reactor (S&T Reactor) - Reply to a Notice of Violation ML18233A4012018-07-0202 July 2018 Requesting Approval for Reviewing Official at Mstr 2024-08-08
[Table view] Category:License-Operator
MONTHYEARML24281A0622024-10-0808 October 2024 Examination Confirmation Letter No. 50-123/Ol-25-01 Missouri University of Science and Technology ML24017A1662024-01-18018 January 2024 Examination Confirmation Letter No. 50-123/Ol-24-02, Missouri University of Science and Technology (Must) ML23311A0722023-12-12012 December 2023 Examination Report Letter No. 50-123/OL-24-01, Missouri University of Science and Technology ML23222A2202023-08-10010 August 2023 Examination Confirmation Letter No. 50-123/OL-24-01, Missouri University of Science and Technology ML23040A3902023-03-13013 March 2023 Examination Confirmation Letter No. 50-123/OL-23-01, Missouri University of Science and Technology ML22280A1742022-10-31031 October 2022 Examination Confirmation Letter No. 50-123/OL-23-01, Missouri University of Science and Technology ML22018A3062022-02-0101 February 2022 Examination Confirmation Letter No. 50-123/OL-22-02, Missouri University of Science and Technology ML21203A0762021-07-28028 July 2021 Examination Confirmation Letter No. 50-123/OL-22-01, Missouri University of Science and Technology ML21039A3422021-02-0808 February 2021 Examination Confirmation Letter No.50-123/OL-21-01, Missouri University of Science and Technology ML20006C9282019-12-23023 December 2019 Examination Confirmation Letter No. 50-123/OL-20-02, Missouri University of Science and Technology ML19347B2142019-12-23023 December 2019 Examination Report No. 50-123/OL-20-01, Missouri University of Science and Technology ML19345E0122019-11-0505 November 2019 Examination Rescheduled No. 50-123/OL-19-02, Missouri University of Science and Technology- Email ML19304B7332019-11-0505 November 2019 Examination Confirmation Letter No. 50-123/OL-20-01, Missouri University of Science and Technology ML19206A3642019-07-25025 July 2019 Examination Confirmation Letter No. 50-123/OL-19-02, Missouri University of Science and Technology ML18312A3932018-11-0909 November 2018 Examination Report No. 50-123/OL-19-01, Missouri University of Science and Technology ML18221A0912018-08-0909 August 2018 Examination Confirmation Letter No. 50-123/OL-19-01, Missouri University of Science and Technology ML18214A2022018-08-0101 August 2018 Operator Requalification Program for the Missouri University of Science and Technology Reactor, Revision 4 ML17270A0982017-09-28028 September 2017 Examination Confirmation Letter No. 50-123/OL-18-01, Missouri University of Science and Technology ML17053A9812017-02-23023 February 2017 Examination Report. 50-123/OL-17-01, Missouri University of Science and Technology ML16342A9262016-12-0505 December 2016 Examination Rescheduled Date, No. 50-186/OL-17-01, University of Missouri - Columbia ML16305A2032016-10-10010 October 2016 Examination Rescheduled, No. 50-123/OOL-17-01, Missouri Univrsity of Science and Technology ML16243A0192016-08-30030 August 2016 Examination Confirmation Letter, No. 50-123/OL-17-01, Missouri University of Science and Technology ML16216A1392016-08-11011 August 2016 Examination Report 50-123/OL-16-002, July 18, 2016, Missouri University of Science and Technology ML16126A1432016-05-0606 May 2016 Examination Notification Letter, No. 50-123/OL-16-02, Missouri University of Science and Technology ML16013A3512016-01-19019 January 2016 Examination Notification Letter No. 50-123/OL-16-01, Missouri University of Science and Technology ML15293A2312015-10-30030 October 2015 Examination Results Letter, No. 50-123/OL-15-03, Missouri University of Science and Technology ML15187A2192015-07-14014 July 2015 Examination Notification Letter Missouri University of Sceince and Technoloy No 50-123 OL-15-03 ML15042A5252015-03-13013 March 2015 Examination Results Letter No. 50-123/OL-15-02, Missouri University of Science and Technology ML14287A3812014-10-29029 October 2014 Examination Results Letter No. 50-123/OL-15-01, Missouri University of Science and Technology ML14202A3772014-07-22022 July 2014 Examination Notification Letter No. 50-123/OL-15-01, Missouri University of Science and Technology ML13240A0592013-08-28028 August 2013 Corporate Notification Letter No. 50-123/OL-14-01, Missouri University of Science and Technology ML1130401932011-11-0404 November 2011 Examination Results Letter, No. 50-123/OL-12-01, Missouri University of Science and Technology ML1109602222011-04-11011 April 2011 Initial Examination Results Letter No. 50-123/OL-11-02, Missouri University of Science and Technology ML1034103552010-12-10010 December 2010 Initial Examination Results Letter No. 50-123/OL-11-01, Missouri University of Science and Technology ML1034103352010-12-10010 December 2010 Initial Examination Report No. 50-123/OL-11-01, Missouri University of Science and Technology ML0825608112008-09-23023 September 2008 Initial Examination Corporate Notification Letter, 50-123/OL-09-01, Missouri University of Science and Technology ML0735104112008-01-0202 January 2008 Initial Examination Results Letter No 50-123/OL-08-01, University of Missouri - Rolla ML0702900302007-02-0707 February 2007 Initial Examination Report No. 50-123/OL-07-01, University of Missouri-Rolla IR 05000123/20060022006-07-14014 July 2006 Letter to Mr. William Bonzer from Johnny Eads Retake Examination Report No. 50-123/06-02, University of Missouri-Rolla ML0617903942006-07-14014 July 2006 Letter to Mr. William Bonzer from Johnny Eads Retake Examination Results Letter, No. 50-123/OL-06-02, University of Missouri-Rolla ML0534203702005-12-0808 December 2005 Initial Examination Results Letter, No. 50-123/OL-06-01, University of Missouri--Rolla ML0518203182005-07-0808 July 2005 Initial Examination Corporate Notification Letter No. 50-123/OL-06-01, University of Missouri-Rolla, October 24, 2005 ML0509502662005-04-12012 April 2005 Retake Examination Results Letter No. 50-123/OL-05-01, University of Missouri-Rolla ML0431300162004-11-0909 November 2004 Revised Initial Examination Results Letter, No. 50-123/OL-04-01, University of Missouri - Rolla ML0428002402004-10-0808 October 2004 Acknowledgment of the University of Missouri - Rolla - September 16, 2004 Letter on Initial Examination Results ML0415601082004-07-19019 July 2004 Initial Examination Results Letter No. 50-123/OL-04-01, University of Missouri ML0310003672003-04-17017 April 2003 Initial Examination Results Letter, No. 50-123/OL-03-01, University of Missouri-Rolla ML0301604722003-01-27027 January 2003 Initial Examination Corporate Notification Letter No. 50-123/OL-03-01, University of Missouri-Rolla ML0228208002002-10-16016 October 2002 Retake Examination 50-123/OL-02-002, Results for Univ. of Missouri - Rolla ML0208705582002-04-22022 April 2002 Examination Results Letter, 50-123/OL-02-01, University of Missouri-Rolla, 03/11/2002 2024-10-08
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24281A0622024-10-0808 October 2024 Examination Confirmation Letter No. 50-123/Ol-25-01 Missouri University of Science and Technology ML24017A1662024-01-18018 January 2024 Examination Confirmation Letter No. 50-123/Ol-24-02, Missouri University of Science and Technology (Must) ML23311A0722023-12-12012 December 2023 Examination Report Letter No. 50-123/OL-24-01, Missouri University of Science and Technology ML23222A2202023-08-10010 August 2023 Examination Confirmation Letter No. 50-123/OL-24-01, Missouri University of Science and Technology ML23040A3902023-03-13013 March 2023 Examination Confirmation Letter No. 50-123/OL-23-01, Missouri University of Science and Technology ML22280A1742022-10-31031 October 2022 Examination Confirmation Letter No. 50-123/OL-23-01, Missouri University of Science and Technology ML22018A3062022-02-0101 February 2022 Examination Confirmation Letter No. 50-123/OL-22-02, Missouri University of Science and Technology ML21203A0762021-07-28028 July 2021 Examination Confirmation Letter No. 50-123/OL-22-01, Missouri University of Science and Technology ML21039A3422021-02-0808 February 2021 Examination Confirmation Letter No.50-123/OL-21-01, Missouri University of Science and Technology ML19347B2142019-12-23023 December 2019 Examination Report No. 50-123/OL-20-01, Missouri University of Science and Technology ML20006C9282019-12-23023 December 2019 Examination Confirmation Letter No. 50-123/OL-20-02, Missouri University of Science and Technology ML19345E0122019-11-0505 November 2019 Examination Rescheduled No. 50-123/OL-19-02, Missouri University of Science and Technology- Email ML19304B7332019-11-0505 November 2019 Examination Confirmation Letter No. 50-123/OL-20-01, Missouri University of Science and Technology ML19206A3642019-07-25025 July 2019 Examination Confirmation Letter No. 50-123/OL-19-02, Missouri University of Science and Technology ML18312A3932018-11-0909 November 2018 Examination Report No. 50-123/OL-19-01, Missouri University of Science and Technology ML18221A0912018-08-0909 August 2018 Examination Confirmation Letter No. 50-123/OL-19-01, Missouri University of Science and Technology ML17270A0982017-09-28028 September 2017 Examination Confirmation Letter No. 50-123/OL-18-01, Missouri University of Science and Technology ML17053A9812017-02-23023 February 2017 Examination Report. 50-123/OL-17-01, Missouri University of Science and Technology ML16342A9262016-12-0505 December 2016 Examination Rescheduled Date, No. 50-186/OL-17-01, University of Missouri - Columbia ML16305A2032016-10-10010 October 2016 Examination Rescheduled, No. 50-123/OOL-17-01, Missouri Univrsity of Science and Technology ML16243A0192016-08-30030 August 2016 Examination Confirmation Letter, No. 50-123/OL-17-01, Missouri University of Science and Technology ML16216A1392016-08-11011 August 2016 Examination Report 50-123/OL-16-002, July 18, 2016, Missouri University of Science and Technology ML16126A1432016-05-0606 May 2016 Examination Notification Letter, No. 50-123/OL-16-02, Missouri University of Science and Technology ML16013A3512016-01-19019 January 2016 Examination Notification Letter No. 50-123/OL-16-01, Missouri University of Science and Technology ML15293A2312015-10-30030 October 2015 Examination Results Letter, No. 50-123/OL-15-03, Missouri University of Science and Technology ML15187A2192015-07-14014 July 2015 Examination Notification Letter Missouri University of Sceince and Technoloy No 50-123 OL-15-03 ML15042A5252015-03-13013 March 2015 Examination Results Letter No. 50-123/OL-15-02, Missouri University of Science and Technology ML14287A3812014-10-29029 October 2014 Examination Results Letter No. 50-123/OL-15-01, Missouri University of Science and Technology ML14202A3772014-07-22022 July 2014 Examination Notification Letter No. 50-123/OL-15-01, Missouri University of Science and Technology ML13240A0592013-08-28028 August 2013 Corporate Notification Letter No. 50-123/OL-14-01, Missouri University of Science and Technology ML1130401932011-11-0404 November 2011 Examination Results Letter, No. 50-123/OL-12-01, Missouri University of Science and Technology ML1109602222011-04-11011 April 2011 Initial Examination Results Letter No. 50-123/OL-11-02, Missouri University of Science and Technology ML1034103552010-12-10010 December 2010 Initial Examination Results Letter No. 50-123/OL-11-01, Missouri University of Science and Technology ML0825608112008-09-23023 September 2008 Initial Examination Corporate Notification Letter, 50-123/OL-09-01, Missouri University of Science and Technology ML0735104112008-01-0202 January 2008 Initial Examination Results Letter No 50-123/OL-08-01, University of Missouri - Rolla ML0702900302007-02-0707 February 2007 Initial Examination Report No. 50-123/OL-07-01, University of Missouri-Rolla ML0617903942006-07-14014 July 2006 Letter to Mr. William Bonzer from Johnny Eads Retake Examination Results Letter, No. 50-123/OL-06-02, University of Missouri-Rolla IR 05000123/20060022006-07-14014 July 2006 Letter to Mr. William Bonzer from Johnny Eads Retake Examination Report No. 50-123/06-02, University of Missouri-Rolla ML0534203702005-12-0808 December 2005 Initial Examination Results Letter, No. 50-123/OL-06-01, University of Missouri--Rolla ML0518203182005-07-0808 July 2005 Initial Examination Corporate Notification Letter No. 50-123/OL-06-01, University of Missouri-Rolla, October 24, 2005 ML0509502662005-04-12012 April 2005 Retake Examination Results Letter No. 50-123/OL-05-01, University of Missouri-Rolla ML0431300162004-11-0909 November 2004 Revised Initial Examination Results Letter, No. 50-123/OL-04-01, University of Missouri - Rolla ML0428002402004-10-0808 October 2004 Acknowledgment of the University of Missouri - Rolla - September 16, 2004 Letter on Initial Examination Results ML0415601082004-07-19019 July 2004 Initial Examination Results Letter No. 50-123/OL-04-01, University of Missouri ML0310003672003-04-17017 April 2003 Initial Examination Results Letter, No. 50-123/OL-03-01, University of Missouri-Rolla ML0301604722003-01-27027 January 2003 Initial Examination Corporate Notification Letter No. 50-123/OL-03-01, University of Missouri-Rolla ML0228208002002-10-16016 October 2002 Retake Examination 50-123/OL-02-002, Results for Univ. of Missouri - Rolla ML0208705582002-04-22022 April 2002 Examination Results Letter, 50-123/OL-02-01, University of Missouri-Rolla, 03/11/2002 2024-10-08
[Table view] |
Text
February 1, 2022 Mr. Ethan Taber, Reactor Manager Missouri University of Science and Technology Nuclear Reactor Facility 250 West 13th Street Rolla, MO 65409-0630
SUBJECT:
EXAMINATION CONFIRMATION LETTER NO. 50-123/OL-22-02, MISSOURI UNIVERSITY OF SCIENCE AND TECHNOLOGY
Dear Mr. Taber:
Arrangements have been made with you for the administration of operator licensing examinations at the Missouri University of Science and Technology reactor. The written examination is scheduled for the week of April 25, 2022.
To meet this schedule, please furnish the material listed in Enclosure 1, Reference Material for Reactor/Senior Operator Licensing Examinations, in either hard copy to the address below or e-mail to Paulette.Torres@nrc.gov as soon as possible.
ATTN: Paulette Torres M/S O-12 D-20 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738, Administration of Written Examinations, describes your responsibilities for conducting written examinations. Enclosure 3, Procedures for the Administration of Written Examinations, describes applicant responsibilities during the administration of the written examination. Please ensure that all applicants are aware of these rules.
Your review of the written examination will be conducted in accordance with the procedures specified in Enclosure 4, Facility Review of Written Examinations.
Signed operator license applications in accordance with 10 CFR 55 Subpart D, Applications, certifying that all applicants have successfully completed the facility licensees requirements to be licensed as an operator or senior operator and that all applicants meet the medical requirements, must be submitted at least 14 days before the start date of the examination. This will allow the chief examiner time to review and process the applications. If this review cannot be completed in time to decide an applicants eligibility, that applicant will not be permitted to sit for the examination. Therefore, it is recommended that license applications be timely provided to ensure an appropriate level of review.
E. Taber The U.S. Nuclear Regulatory Commission (NRC) has posted copies of the application forms, Personal Qualification StatementLicensee (NRC Form 398), and Certification of Medical History by Facility Licensee (NRC Form 396), on the agencys Web site. The forms are in Adobe Acrobat format. https://www.nrc.gov/reading-rm/doc-collections/forms/nrc398.pdf https://www.nrc.gov/reading-rm/doc-collections/forms/nrc396.pdf Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval numbers 3150-0018, 3150-0024 and 3150-0090.
The burden to the public for these mandatory information collections is estimated to average 7.45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> per combined response for completing the information collections. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-5656, or e-mail at Paulette.Torres@nrc.gov.
Sincerely, Paulette A.Torres, Chief Examiner Non-Power Production and Utilization Facility Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 50-123
Enclosures:
- 1. Reference Material for Reactor/
Senior Operator
- 2. Administration of Written Examinations
- 3. Procedures for the Administration of Written Examinations
- 4. Facility Review of Written Examinations cc: w/o enclosures: See next page Signed by Torres, Paulette on 02/01/22
Missouri University of Science and Technology Docket No. 50-123 cc:
Homeland Security Coordinator Missouri Office of Homeland Security P.O. Box 749 Jefferson City, MO 65102 Planner, Dept of Health and Senior Services Section for Environmental Public Health 930 Wildwood Drive Jefferson City, MO 65102-0570 Deputy Director for Policy Department of Natural Resources 1101 Riverside Drive Fourth Floor East Jefferson City, MO 65101 A-95 Coordinator Commissioners Office Office of Administration P.O. Box 809 State Capitol Building, Room 125 Jefferson City, MO 65101 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611 Dr. Ayodeji Alajo, Interim Program Director Missouri University of Science and Technology Nuclear Engineering 222 Fulton Hall Rolla, MO 65409-0630 Dr. Joseph Graham, Director Nuclear Reactor Facility Missouri University of Science and Technology Mining and Nuclear Engineering 228 Fulton Hall Rolla, MO 65409-0170 Planning Coordinator Missouri Department of Natural Resources 1101 Riverside Drive Jefferson City, MO 65101
E. Taber
SUBJECT:
EXAMINATION CONFIRMATION LETTER NO. 50-123/OL-22-02, MISSOURI UNIVERSITY OF SCIENCE AND TECHNOLOGY DATED: FEBRUARY 1, 2022 DISTRIBUTION:
PUBLIC JBowen, NRR SAnderson, NRR TTate, NRR JBorromeo, NRR PTorres, NRR XYin, NRR PO'Bryan, NRR ZTaru, NRR BMaier, RGN-IV ADAMS Accession Number: ML22018A306 NRR-079 OFFICE NRR/DANU/UNPL/CE NRR/DANU/UNPO/OLA NRR/DANU/UNPO/BC NRR/DANU/UNPL/CE NAME PTorres ZTaru TTate PTorres DATE 1/19/2022 1/31/2022 1/31/2022 2/1/2022 OFFICIAL RECORD COPY REFERENCE MATERIAL FOR REACTOR/SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS
- 1) Training materials including all substantive written material used to prepare applicants for initial reactor operator and senior reactor operator licensing. The material should include learning objectives, if available, and details presented during lectures, rather than outlines. Training materials should be identified, bound, and indexed. Training materials should include the following:
(a) System descriptions including descriptions of all operationally relevant flowpaths, components, controls, and instrumentation. System training material should draw parallels to the actual procedures used for operating an applicable system.
(b) Learning objectives, student handouts, and lesson plans (including training manuals, facility orientation manual, system descriptions, reactor theory, thermodynamics).
(c) Complete and operationally useful descriptions of all safety-system interactions and secondary interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.
(d) Training material used to clarify and strengthen understanding of emergency operating procedures.
- 2) Complete Procedure Index (including temporary procedures).
- 3) All administrative procedures as applicable to reactor operation or safety.
- 4) All integrated facility procedures, normal or general operating procedures, and procedures for experiments.
- 5) All emergency procedures, emergency instructions, and abnormal or special procedures.
- 6) Standing orders or procedures changed by reactor supervision and important orders or changes that are safety related and may supersede the regular procedures.
- 7) A list of all reactor facility surveillances, with copies of all COMPLETED surveillances which require the collection of data (e.g., heat balance, rod drop times).
- 8) Fuel-handling and core-loading procedures and initial core-loading procedure (if appropriate).
- 9) Any annunciator/alarm procedures, as applicable.
- 10) Radiation protection manual and radiation control manual or procedures.
2
- 11) Emergency plan and any emergency plan implementing procedures (EPIPs).
- 12) Safety analysis report, technical specifications, and interpretations, if available.
- 13) System operating procedures, including experiments.
- 14) Piping and instrumentation diagrams, electrical single-line diagrams, and flow diagrams.
- 15) Technical data book, and/or facility curve information, as used by operators and facility precautions, limitations, and setpoints.
- 16) Questions and answers specific to the facility training program, which may be used in the written or operating examinations (voluntary by facility licensee).
- 17) Facility modification authorizations, which were authorized since the last revision to the safety analysis report.
- 18) Additional material as requested by the examiners to develop examinations that meet the requirements of the research and test reactor examiner standards and regulations.
The above reference material should be approved, final issues and be so marked. If a facility has not finalized some of the material, the chief examiner should verify with the facility that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination.
ADMINISTRATION OF WRITTEN EXAMINATIONS
- 1) A single room must be provided for administration of the written examination. This room and supporting restroom facilities should be located so as to prevent contact with other facility personnel during the written examination.
- 2) Minimum spacing is necessary to ensure examination integrity. The chief examiner will determine whether the room has adequate area to support minimum spacing between examination applicants to ensure examination integrity.
- 3) The chief examiner will review any arrangements made by the facility to give the applicants lunch, coffee, or other refreshments. These arrangements shall comply with Item one above.
- 4) The facility licensee may provide pads of 8.5 by 11-inch lined paper in unopened packages for the applicants use in completing the examination. The examiner will distribute these pads as needed.
- 5) Applicants may bring pens, pencils, calculators, or slide rules into the examination room. Black ink or dark pencils should be used for writing answers to questions.
- 6) The chief examiner must approve any wall charts, models, training materials, equipment, or reference material present in the examination room.
- 7) The chief examiner will give the facility staff a copy of the written examination with answer key at the beginning of the examination. The facility staff will then have five working days to submit formal written comments with supporting documentation regarding written examination questions and answers to the chief examiner.
PROCEDURES FOR THE ADMINISTRATION OF WRITTEN EXAMINATIONS
- 1) Verify candidate identity.
- 2) Pass out examinations and handouts. Instruct applicants not to review examination until instructed to do so.
READ THE FOLLOWING INSTRUCTIONS VERBATIM:
- 1) Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
- 2) When you have completed your examination, you must sign the statement at the bottom of the cover sheet. This indicates that the work is your own and you have not received or given assistance in completing the examination.
READ THE FOLLOWING INSTRUCTIONS:
With the start of the examination, you must comply with the following rules. These rules are in effect within the examination area, until the last candidate has handed in his or her examination:
- 1) Restroom trips are limited to only one applicant at a time. You must avoid all contact with anyone outside the examination room to preclude even the appearance of cheating.
- 2) Use black ink or dark pencil only to facilitate legible reproductions.
- 3) Print your name in the blank provided in the upper right corner of the examination cover sheet and each answer sheet.
- 4) Mark your answers on the answer sheet(s) provided.
- 5) The point value for each question is shown in brackets after the question.
- 6) If the intent of a question is unclear, ask questions of the examiner or proctor only.
- 7) There is a time limit of one hour per section of the written examination. For example, a one-section retake examination has a one-hour time limit, while a normal three-section initial examination has a three-hour time limit.
- 8) You must achieve a grade of 70 percent or greater in each category to pass the examination.
- 9) When turning in your examination, assemble the completed examination with examination questions, examination aids, answer sheets, and all scrap paper. Give the proctor your answer sheet(s) along with the signed cover sheet. Take all other material collected with you out of the examination area.
2
- 10) After turning in your examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked.
- 11) During the examination you will be evaluated for your actions as if you were the actual watchstander. Please operate the reactor as if you were licensed, with the exception that you should announce your actions, and then pause momentarily to give the operator of record time to correct you or stop you, if necessary, before you actually perform the action. In addition, the examiner will be observing that you meet all conditions of your license, (e.g., wearing corrective lenses to perform licensed duties).
FACILITY REVIEW OF WRITTEN EXAMINATIONS 1.
At the option of the appropriate NRC management, the facility may review the written examination up to 2 weeks before its administration. This review may take place at the facility or an NRC office. The chief examiner will coordinate the details of the review with the facility. An NRC examiner will be present at all times during the review. The facility staff may not retain copies of the examination or any written notes. When using this option, the facility reviewers must sign the following statement before being allowed access to the examination.
Pre-examination Security Agreement:
I acknowledge that I have acquired specialized knowledge
[Print Name]
concerning the examination scheduled for at
[Print Date] [Print Facility Name]
as of the date of my signature below. I agree that I will not knowingly divulge any information concerning this examination to any unauthorized persons. I understand that I am not to participate in any instruction involving those applicants scheduled to be administered the above examination from this date until after the examination has been administered. I further understand that violation of the conditions of this agreement may result in the examinations being canceled and/or enforcement action against myself or the facility licensee by whom I am employed or represent.
Signature/Date In addition, the facility staff reviewers will sign the following statement after the written examination has been administered.
a.
Post-examination Security Agreement:
I did not, to the best of my knowledge, divulge any
[Print Name]
Information concerning the examinations administered during the week of at or provide any instruction to those applicants
[Print Date]
[Print Facility Name]
who were administered the examination from the date I entered into this security agreement until the completion of examination administration.
Signature/Date
- 2. The facility staff will be provided a copy of the examination and the answer key at the beginning of the examination. A copy will be kept of any pen and ink changes made to questions during the examination administration.
2 If members of the facility staff did not review the examination before its administration, they will have 5 working days from the day of the written examination to submit formal comments.
If the facility staff reviewed the examination before its administration, they must submit any additional comments before the examiner leaves the facility. The reactor supervisor will address the comments to the chief examiner. The NRC will consider comments submitted after the required period on a case-by-case basis. This may cause delays in grading the examinations.
- 3. The facility licensee should submit comments in the following format:
list the question section and number and state the comment along with a recommendation for correction (e.g., delete, two correct answers).
support the comment with a reference and provide a copy of the reference if it was not included in the original reference material submitted.
NOTES:
- 1) No change to the examination will be made without a reference to support the facility comment. Provide any supporting documentation not previously supplied.
- 2) Comments made without a concise facility recommendation will not be addressed.
- 3) Comments not submitted within the requested time will be included in the grading process on a case-by-case basis as determined by the NRC. Comments not submitted within the requested time will delay the examination grading process.
- 4) NRC policy is to delete a multiple-choice question that has no correct answer or more than two correct answers and to give credit for either response for questions that have two correct answers.