Letter Sequence Request |
---|
EPID:L-2021-LLA-0177, License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (Approved, Closed) |
|
MONTHYEARML21272A1682021-09-28028 September 2021 License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications Project stage: Request ML21271A6112021-09-28028 September 2021 Presentation Information for Second Pre-Application Meeting Regarding Use of Framatome Fuel at Callaway Plant Project stage: Meeting ML21272A1672021-09-28028 September 2021 License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications Project stage: Request ML21308A0692021-11-0404 November 2021 NRR E-mail Capture - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway Unit 1 - License Amendment Request - Adoption of Alternate Source Term and Revision of TSs - Project stage: Acceptance Review ML21319A0062021-11-30030 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Actions License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications Project stage: Acceptance Review ML21335A4512021-12-0101 December 2021 Supplement to License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications Project stage: Request ML21335A1602021-12-0101 December 2021 Special Report 2021-02: Accident Monitoring Instrumentation Non-Functional for Greater than 7 Days Project stage: Request ML21335A4522021-12-0101 December 2021 Supplement to License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications Project stage: Supplement ML21342A3332021-12-10010 December 2021 Acceptance of Requested Licensing Actions License Amendment for Adoption of Alternate Source Term and Revision of Technical Specifications Project stage: Acceptance Review ML22137A0292022-05-16016 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 Project stage: Draft RAI ML22154A0122022-06-0202 June 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 Project stage: RAI ML22186A1052022-07-0505 July 2022 Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications Project stage: Response to RAI ML22186A1032022-07-0505 July 2022 Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications Project stage: Request ULNRC-06754, Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications2022-07-0505 July 2022 Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications Project stage: Response to RAI ML22244A1672022-09-0101 September 2022 Revised Response to Request for Additional Information Regarding License Amendment Request for Adoption Off Alternate Source Term and Revision of Technical Specifications (LDCN 2 1-00 15) Project stage: Request ML22287A0952022-10-14014 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 Project stage: RAI ML22342B2642022-12-0808 December 2022 Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015) Project stage: Request ML23037A0022023-02-0303 February 2023 NRR E-mail Capture - Callaway - LAR to Adopt AST - EPID L-2021-LLA-0177 - Revised Schedule for Completion of the Project Project stage: Approval ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications Project stage: Approval 2022-12-08
[Table View] |
|
---|
Category:Letter
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] |
Text
SENSITIVE INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE
- I 1 n fVD LiINT1DD I V LI 1 L J YV Callaway Plant MISSOURI September 28, 2021 ULNRC-06636 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 10 CFR 50.67 10 CFR 50.90 10 CFR 2.390 Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT uNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 LICENSE AMENDMENT REQUEST FOR ADOPTION OF ALTERNATE SOURCE TERM AND REVISION OF TECHNICAL SPECIFICATIONS
References:
NRC letter dated April 1 6, 202 1 Summary of March 1 5, 202 1 Teleconference with Union Electric Company Regarding Proposed License Amendment Request to Implement Alternative Source Term for Callaway Plant Unit No. 1 tEPID L-2021-LRM-0020)
(ADAMS Accession No. ML21103A003)
Pursuant to 10 CFR 50.90, Application for amendment of license, construction permit, or early site permit, and 1 0 CFR 50.67, Alternate Source Term, Ameren Missouri (Union Electric) hereby requests an amendment to Renewed Facility Operating License No. NPF-30 for the Callaway Plant to incorporate the Alternate Source Term (AST) dose analysis methodology into its licensing basis and to revise Technical Specification (TS) 3 .7. 10, Control Room Emergency Ventilation System (CREVS),
TS 5.5.1 1, Ventilation Filter Testing Program (VFTP), and TS 5.5. 17, Control Room Envelope Habitability Program.
Information essential to approving this request to adopt the AST dose analysis methodology, including the basis for the proposed TS changes, is provided in the enclosures to this letter. Specifically, Enclosure 1 provides an evaluation ofthe requested changes and includes attachments that summarize Callaways conformance with applicable regulatory guidance for adoption of the AST and associated dose analyses. It should be noted that Enclosure 1 contains security sensitive information that is to be withheld from public disclosure pursuant to 10 CFR 2.390. A redacted version ofEnclosure 1 is thus Enclosure 1 to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390(a)(4).
Upon removal of Enclosure 1 this letter is uncontrolled SENSITIVE INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 83 1 5 Countr Road 159 SteediTian, 1\IO 65077 : i\iiiereni\Iissouri.com
ULNRC-06636 SENSITIVE NFORMATION WITHHOLD FROM PUBLIC DISCLOSURE September 28, 2021 UNDER 10 CFR 2.390 Page 2 of 5 provided as Enclosure 2. Enclosure 3 provides the proposed IS changes in the form of marked-up pages from the Callaway Plant Technical Specifications, and Enclosure 4 provides those changes in the form of clean (revised) pages. Enclosure 5 provides the proposed IS Bases changes in the form of marked-up pages, which are provided for information only. (The TS Bases changes will be processed in accordance with T$ 5.5.14, Technical Specification (TS) Bases Control Program.)
Enclosure 6 provides the proposed FSAR changes, also for information only.
Evaluation ofthis amendment application pursuant to 10 CFR 50.92, Issuance of amendment, has determined that the application does not involve a significant hazard consideration. It should also be noted that review ofthis amendment application pursuant to 10 CFR 50.54(q) has determined that no changes to the Radiological Emergency Response Plan requiring prior NRC approval are required.
It may be noted that this request for license amendment was discussed with the NRC staff in a public pre-submittal meeting (telephone conference) conducted on March 1 5, 2021 as summarized in the Reference identified on page 1 of this letter.
In may also be noted that this amendment application was reviewed by the Onsite Review Committee, and in accordance with 1 0 CFR 50.91 Notice for public comment; State consultation, Section (b)(l), a copy ofthis amendment application is being provided to the designated Missouri State official.
Ameren Missouri requests approval ofthis license amendment request prior to September 30, 2022. It is anticipated that the license amendment, as approved, will be effective upon issuance and will be implemented within 120 days from the date of issuance.
for questions concerning this matter, please contact Mr. Tom Elwood at 314-225-1905.
I declare under penalty ofperjury that the foregoing is true and correct.
Sincerely, Executed on 7/, 2&t (
- rxkL
ç StephaniP. Banker Vice President, Nuclear Engineering and Support Enclosure 1 to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390(a)(4).
Upon removal of Enclosure 1 , this letter is uncontrolled SENSITIVE INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390
ULNRC-06636 SENSITIVE INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE September 28, 2021 UNDER 10 CFR 2.390 Page 3 of 5
Enclosures:
1 Evaluation of Proposed Changes*
- 2. Evaluation of Proposed Changes (Redacted) 3 Proposed Technical Specification Changes (Mark-up)
- 4. Revised Technical Specification Pages
- 5. Proposed TS Bases Changes (for information only)
- 6. FSAR Markups (for information only)
- Enclosure contains security sensitive information.
Enclosure 1 to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390(a)(4).
Upon removal of Enclosure 1 this letter is uncontrolled SENSITIVE INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390
ULNRC-06636 SENSITIVE INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE September 28, 2021 UNDER 1 0 CFR 2.3 90 Page 4 of 5 cc: Mr. Scott A. Morris Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08B1A Washington, DC 20555-000 1 Enclosure 1 to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390(a)(4).
Upon removal of Enclosure 1 , this letter is uncontrolled SENSITIVE INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390
ULNRC-06636 SENSITIVE INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE September 28, 2021 UNDER 10 CFR 2.390 Page 5 of 5 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 6500 Western Place, Suite 400 Fort Worth, TX 76116
( Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:
F. M. Diya B. L. Cox S. P. Banker S. G. Kovaleski J. S. Geyer S. J. Meyer T. B. Elwood B. D. Richardson ORC Secretary Corporate Communications NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)
Missouri Public Service Commission Ms. Katie Jo Wheeler (DNR)
Enclosure 1 to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390(a)(4).
Upon removal of Enclosure 1 this letter is uncontrolled SENSITiVE INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390