MONTHYEARML24102A2572024-04-25025 April 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - March 2024 ML24026A0982024-03-0101 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0057 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML22035A1262022-02-0909 February 2022 Withdrawal of Exemption Request from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.d (EPID L-2021-LLE-0055 (COVID-19)) ML21354A5032022-01-24024 January 2022 Requested Exemption from 10 CFR 50, Appendix E, Section IV.F.2.D Not Required (EPID L-2021-LLE-0055 (COVID-19)) RA-21-0330, One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d2021-12-15015 December 2021 One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d RA-21-0235, Supplement to Exemption Request for Senior Reactor Operator License Application2021-08-26026 August 2021 Supplement to Exemption Request for Senior Reactor Operator License Application ML20338A3292020-12-17017 December 2020 Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3(I)(1) (EPID L-2020-LLE-0180 (Covid 19)) ML19254A6202019-09-17017 September 2019 Duke Energy Fleet (Brunswick, Catawba, Robinson, McGuire, Oconee, and Shearon Harris) - Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML0504203812005-03-0909 March 2005 Exemption, 10 CFR Part 50, Appendix J to Exclude Main Steam Isolation Valve Leakage from Section Iii.A Tests 2024-04-25
[Table view] Category:Letter type:RA
MONTHYEARRA-24-0178, Independent Spent Fuel Storage Installation (ISFSI) Docket No. 72-06 - Registration for Use of General License Spent Fuel Casks2024-07-10010 July 2024 Independent Spent Fuel Storage Installation (ISFSI) Docket No. 72-06 - Registration for Use of General License Spent Fuel Casks RA-24-0166, Revision to Emergency Plan Implementing Procedure2024-06-27027 June 2024 Revision to Emergency Plan Implementing Procedure RA-24-0163, Registration for Use of General License Spent Fuel Casks2024-06-19019 June 2024 Registration for Use of General License Spent Fuel Casks RA-24-0164, Inservicee Inspection Program Owners Activity Report Refueling Outage 252024-06-19019 June 2024 Inservicee Inspection Program Owners Activity Report Refueling Outage 25 RA-24-0030, Duke Energy - Annual Radioactive Effluent Release Report - 20232024-04-29029 April 2024 Duke Energy - Annual Radioactive Effluent Release Report - 2023 RA-24-0083, Annual Report of Changes Pursuant to 10 CFR 50.462024-04-25025 April 2024 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-24-0031, Annual Radiological Environmental Operating Report - 20232024-04-23023 April 2024 Annual Radiological Environmental Operating Report - 2023 RA-24-0094, Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Traini2024-04-17017 April 2024 Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Training RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations RA-24-0085, Onsite Property Insurance Coverage2024-04-0101 April 2024 Onsite Property Insurance Coverage RA-24-0086, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-04-0101 April 2024 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-24-0058, Cycle 25 Core Operating Limits Report (COLR)2024-03-0101 March 2024 Cycle 25 Core Operating Limits Report (COLR) RA-24-0015, Submittal of 2023 Sea Turtle Annual Report2024-01-10010 January 2024 Submittal of 2023 Sea Turtle Annual Report RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0297, Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 502023-11-15015 November 2023 Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 50 RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023 License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-23-0045, Inservice Inspection Program Owners Activity Report for Unit 2 Refueling Outage 262023-06-28028 June 2023 Inservice Inspection Program Owners Activity Report for Unit 2 Refueling Outage 26 RA-23-0145, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks2023-06-15015 June 2023 Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0139, Registration for Use of General License Spent Fuel Casks2023-06-0606 June 2023 Registration for Use of General License Spent Fuel Casks RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0096, Post Accident Monitoring (PAM) Instrumentation Report2023-04-12012 April 2023 Post Accident Monitoring (PAM) Instrumentation Report RA-23-0063, Notification of Deviation from BWRVIP Guidelines2023-04-11011 April 2023 Notification of Deviation from BWRVIP Guidelines RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-23-0021, Unit 2 Cycle 26 Core Operating Limits Report (COLR)2023-02-22022 February 2023 Unit 2 Cycle 26 Core Operating Limits Report (COLR) RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2023-02-0202 February 2023 Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-23-0010, 2022 Sea Turtle Annual Report2023-01-0909 January 2023 2022 Sea Turtle Annual Report RA-22-0616, Revision to Brunswick Snubber Program Plan2023-01-0505 January 2023 Revision to Brunswick Snubber Program Plan RA-22-0308, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2022-12-16016 December 2022 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-22-0342, Revision to Emergency Plan On-Shift Staffing Analysis2022-12-0808 December 2022 Revision to Emergency Plan On-Shift Staffing Analysis RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab2022-12-0505 December 2022 Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab RA-22-0344, Notification of Deviation from BWRVIP Guidelines2022-11-30030 November 2022 Notification of Deviation from BWRVIP Guidelines RA-22-0261, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2022-09-15015 September 2022 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks RA-22-0271, Accident Monitoring Instrumentation Special Report2022-09-13013 September 2022 Accident Monitoring Instrumentation Special Report RA-22-0252, Registration for Use of General License Spent Fuel Casks2022-08-25025 August 2022 Registration for Use of General License Spent Fuel Casks RA-22-0190, Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 28, 10 CFR 54.37 Update, Technical Requirements Manuals, Quality Assurance Program Description, Technical Specification Bases, 10 CFR 50.59 and 10 CFR .2022-08-11011 August 2022 Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 28, 10 CFR 54.37 Update, Technical Requirements Manuals, Quality Assurance Program Description, Technical Specification Bases, 10 CFR 50.59 and 10 CFR . RA-22-0165, Inservice Inspection Program Owners Activity Report for Refueling Outage 242022-06-0909 June 2022 Inservice Inspection Program Owners Activity Report for Refueling Outage 24 RA-22-0175, Post Accident Monitoring (PAM) Instrumentation Report2022-06-0101 June 2022 Post Accident Monitoring (PAM) Instrumentation Report RA-22-0155, Revision to Emergency Plan Annex and Implementing Procedure2022-05-26026 May 2022 Revision to Emergency Plan Annex and Implementing Procedure 2024-07-10
[Table view] |
Text
fa DUKE John A. Krakuszeski Vice President
~ ENERGY Brunswick Nuclear Plant 8470 River Rd SE Southport, NC 28461 o: 910.832.3698
August 26, 2021
Serial: RA-21-0235
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Supplement to Exemption Request for Senior Reactor Operator License Application
Reference:
- 1. Letter from John A. Krakuszeski (Duke Energy) to Laura Dudes (U.S.
Nuclear Regulatory Commission, Region II), Application for Senior Reactor Operator License, Duke Energy Serial Number RA-21-0229, dated July 29, 2021.
- 2. Letter from John A. Krakuszeski (Duke Energy) to the U.S. Nuclear Regulatory Commission Document Control Desk, Exemption Request for Senior Reactor Operator License Application, Duke Energy Serial Number RA-21-0217, dated July 29, 2021.
- 3. Letter from John A. Krakuszeski (Duke Energy) to Laura Dudes (U.S.
Nuclear Regulatory Commission, Region II), Application for Senior Reactor Operator License, Duke Energy Serial Number RA-21-0247, dated August 23, 2021.
Ladies and Gentlemen:
Duke Energy Progress, LLC (Duke Energy), submitted an application, in accordance with 10 CFR 55.31, for an individual to be licensed as a senior reactor operator (SRO) at the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2 (i.e., Reference 1, supplemented by Reference 3). This applicant was previously lice nsed at BSEP. As a result, in accordance with 10 CFR 55.47, "Waiver of examination and test requirements," Duke Energy requested a waiver of the written examination and operating test requirements. In support of this SRO license application submittal, and in accordance with 10 CFR 55.11, "Specific exemptions," Duke Energy requested an exemption from the two-year eligibility requirement of 10 CFR 55.47(a)(1)
(i.e., Reference 2).
Duke Energy requests approval of the proposed exemption (i.e., Reference 2) at the earliest opportunity, and no later than December 31, 2021, in order to relieve the licensed operator staffing burdens at BSEP. The proposed exemption is requested to be effective upon issuance.
U.S. Nuclear Regulatory Commission, Region II Page 2 of 2
BSEP has sustained an average of approximately eight licensed operator terminations per year since 2018. Additional attrition is expected in the near-term due to high overtime demands and recent trends in operators leaving BSEP for non-nuclear opportunities. Contributing to the number of vacancies, the Initial License Training (IL T} classes in this timeframe have not met projections. Since 2018 the IL T classes combined have only added 12 new licenses.
As a result of the licensed operator staffing situation, fatigue rule waivers are expected to be needed in the coming months. In addition, off-shift licensed operators will be needed to supplement on-shift crew coverage, impacting off-shift operator functions.
Pursuit of the approval of the subject application is one of several interim actions to mitigate the current staffing burden until the next IL T class graduates in December 2022. It is in the public interest to preserve and supplement as many licensed operators as possible during this time to avoid excessive use of operator overtime and to maintain licensed operators within fatigue rule limits, without the use of waivers, to the extent possible.
The enclosure to this submittal contains a redacted version of the Reference 2 enclosure. All Personally Identifiable Information has been removed.
This document contains no regulatory commitments. Please refer any questions regarding this submittal to Mr. Mark DeWire, Manager-Nuclear Support Services, at (910) 832-6641.
Sincerely,
John A. Krakuszeski
SBY/sby
Enclosure:
Request for Exemption from 10 CFR 55.47(a)(1) - Redacted
cc:
Mr. Andrew Hon, NRC Project Manager Mr. Gale Smith, NRC Senior Resident Inspector Ms. Laura Dudes, NRC Regional Administrator, Region II Mr. Gerald J. McCoy, NRC Chief, Operations Branch, Region II Chair - North Carolina Utilities Commission RA-21-0235 Enclosure Page 1 of 3
Request for Exemption from 10 CFR 55.47(a)(1)
In accordance with 10 CFR 55.11, "Specific exemptions," Duke Energy Progress, LLC (Duke Energy), requests an exemption from the requirements of 10 CFR 55.47, "Waiver of examination and test requirements," for a Senior Reactor Operator (SRO) applicant who does not meet the two-year eligibility requirement of 10 CFR 55.47(a)(1).
The requested exemption from 10 CFR 55.47(a)(1) supports waiver of the requirements for a written examination and operating test in accordance with 10 CFR 55.47.
Basis for Exemption
10 CFR 55.47 states, in part:
(a) On application, the Commission may waive any or all of the requirements for a written examination and operating test, if it finds that the applicant --
(1) Has had extensive actual operating experience at a comparable facility, as determined by the Commission, within two years before the date of application; (2) Has discharged his or her responsibilities competently and safely and is capable of continuing to do so; and (3) Has learned the operating procedures for and is qualified to operate competently and safely the facility designated in the application.
The requested exemption is for (( )), Docket No. 55-23973. Mr. (( ))
discharged his responsibilities competently and safely during his nearly 6 years and 5 months as a licensed operator at BSEP. Mr. (( )) was issued License No. OP-21982 for BSEP, Units 1 and 2, effective January 17, 2013. Subsequently, the license was upgraded to SRO License No. SOP-501215, effective September 20, 2017. Mr. (( )) voluntarily resigned and his SOP License was terminated on June 13, 2019, when he left the company. Along with his duties as a Control Room supervisor, Mr. (( )) served as an instructor for the Brunswick Initial License Training Program with a focus on Abnormal and Emergency Procedure training in the simulator until his departure in June 2019.
Mr. (( )) was rehired to fill an SRO position on June 7, 2021. During his absence, Mr. (( ))
continued in the nuclear power industry and pursued certification as an SRO for the Barakah Nuclear Power Plant (BNPP) in the United Arab Emirates prior to returning to the United States.
Completion of certification training would have qualified Mr. (( )) to operate the controls at BNPP in the same manner that obtaining a license in the United States would allow operation of the controls at an NRC licensed nuclear facility.
In addition, Mr. (( )) served as the Power Ascension Control Center Operations Manager during initial power ascension and testing of BNPP Unit 1. In this capacity, Mr. (( )) was responsible for oversight of repairs and evolutions needed to support power ascension testing on a critical reactor during its initial startup test program.
RA-21-0235 Enclosure Page 2 of 3
Since returning to BSEP on June 7, 2021, Mr. (( )) has completed a training process of self-study and one-on-one instruction, which included the licensed operator requalification material for all training segments since his June 2019 departure. Mr. (( )) then commenced attending licensed operator requalification training in July 2021 and will continue in this training program.
As part of this additional training, Mr. (( )) spent a total of 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> on shift during June and July 2021 as follows:
- 1) 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> as a non-licensed operator under the direction of the qualified on-duty operators performing plant walk downs and refamiliarization tours;
- 2) 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> of shift functions under the direction of a Reactor Operator in the position of Reactor Operator;
- 3) 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of shift functions under the direction of a Senior Reactor Operator in the position of Control Room Supervisor; and
- 4) 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of Work Control Center functions under direction of a Senior Reactor Operator.
At the completion of this additional training and on-shift time, Mr. (( )) took and passed the annual licensed operator requalification written, simulator operating, and Job Performance Measure exams administered on July 7, 2021.
10 CFR 55.11 states:
The Commission may, upon application by an interested person, or upon its own initiative, grant such exemptions from the requi rements of the regulations in this part as it determines are authorized by law and will not endanger life or property and are otherwise in the public interest.
Section 55.11 of 10 CFR allows the NRC to grant exemptions to the regulations in 10 CFR Part 55, and the granting of the proposed exemption will not result in a violation of the Atomic Energy Act of 1954, as amended, or the Commission's regulations. Therefore, the exemption is authorized by law.
As demonstrated above, with Mr. (( )) experience and qualifications, granting this exemption from the two-year eligibility requirement of 10 CFR 55.47(a)(1) will not endanger life or property.
Duke Energy is requesting this exemption as part of ongoing efforts to avoid excessive use of operator overtime. As of July 2021, BSEP has a 30 percent vacancy for on-shift licensed operators. At this staffing level, it is estimated that, on average, nine to ten 12-hour overtime shifts per licensed operator per quarter will be required. It is expected that fatigue rule waivers will be required as a result. Historically, attrition rates increase under increased overtime demands, thereby exacerbating the staffing shortfall.
Duke Energy is diligently pursuing resolution of this issue by undertaking aggressive efforts to staff a large Initial License Training class co mprising approximately 30 candidates. However, with a December 2022 exam date, this is a longer-term solution. In the interim, Duke Energy will RA-21-0235 Enclosure Page 3 of 3
sustain extended vacancies in department staff to maintain the shifts. All remaining staff licensed operators have reactivated and are carrying overtime load beyond their normal duties.
Additionally, three former licensed operators outside of Operations have reactivated for the same purpose. Duke Energy actively recruited Mr. (( )) to return to fill an SRO position. It is in the public interest to preserve and supplement as many licensed operators as possible during this time to avoid excessive use of operator overtime and to maintain licensed operators within fatigue rule limits, without the use of waivers, to the extent possible.
Environmental Assessment
In accordance with 10 CFR Part 51, this action is categorically excluded from the requirements of conducting an environmental assessment or environmental impact statement. Specifically, 10 CFR 51.22(c)(8) categorically exempts issuance, amendment or renewal of an operator license pursuant to 10 CFR Part 55.