RA-21-0217, Exemption Request for Senior Reactor Operator License Application

From kanterella
(Redirected from RA-21-0217)
Jump to navigation Jump to search

Exemption Request for Senior Reactor Operator License Application
ML21211A003
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 07/29/2021
From: Krakuszeski J
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML21211A002 List:
References
RA-21-0217
Download: ML21211A003 (2)


Text

Letter Enclosure Contains Personal Information John A. Krakuszeski Withhold in Accordance with 10 CFR 2.390(a)(6)

Vice President Brunswick Nuclear Plant 8470 River Rd SE Southport, NC 28461 o: 910.832.3698 July 29, 2021 Serial: RA-21-0217 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Exemption Request for Senior Reactor Operator License Application

Reference:

Letter from John A. Krakuszeski (Duke Energy) to Laura Dudes (U.S. Nuclear Regulatory Commission, Region II), Application for Senior Reactor Operator License, Duke Energy Serial Number RA-21-0229, dated July 29, 2021 Ladies and Gentlemen:

Duke Energy Progress, LLC (Duke Energy), submitted an application, in accordance with 10 CFR 55.31, for an individual to be licensed as a senior reactor operator (SRO) at the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2 (i.e., Reference). This applicant was previously licensed at BSEP. As a result, in accordance with 10 CFR 55.47, "Waiver of examination and test requirements," Duke Energy requested a waiver of the written examination and operating test requirements.

It has been approximately 2.1 years since this individual was licensed at BSEP. Therefore, in support of the referenced SRO license application submittal, and in accordance with 10 CFR 55.11, "Specific exemptions," Duke Energy requests an exemption from the two-year eligibility requirement of 10 CFR 55.47(a)(1), which requires extensive actual operating experience within two years before the date of an application for a waiver of the written examination and operating test requirements. The enclosure to this letter provides the basis for the requested exemption from the two-year eligibility requirement of 10 CFR 55.47(a)(1) for this SRO license application.

The enclosure contains personal information. Duke Energy requests that the information contained the enclosure be withheld from public disclosure, in accordance with 10 CFR 2.390(a)(6), since disclosure of this information would constitute a clearly unwarranted invasion of personal privacy.

Letter Enclosure Contains Personal Information Withhold in Accordance with 10 CFR 2.390(a)(6)