MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562'-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
8 7 6 5 4 3 2 1 NORTH ARR ~-
0 H RH R HEAT EXCHANGER H H
03AB NE ST AIRVELL 02ABN ,,.--...
25-0 I II 26-0 I //
J 26-0 H
I /
20-0 II I
..,
/ // I
/
37-9 II I r;:\A VY\ 50-0 I /I I KEY PL \N
-======*-
RELAY ROOM EQUIPMENT LIST
-+-~----117 MCC, DIVISION I---
...E1150F068A I FLOOR EL.
613'.._ 6 11 ITEM I
D,E,CO, ND, ND, CLEFT TO RIGHT)
H11P846 H11P613 DESCRIPTION 4160V SYS SER METER PANEL PROCESS INSTRUMENT CABl~ET DIVISION I
I G A \I Hl1P617 RHR RELAY CABINET I G
~
I "'0
,, HIIP621 RCIC CABINET I II wem '-
H11P622 H11PG26 INBOARD VALVE RELAY CABINET CORE SPRAY CABINET I
I I~
OSRBN I RE wATlR----cLEANl!JP-PHASE SEIPARATOR 001-0) ~ '
~
! ELECTRICAL H11P628 H11P883 AUTOMATIC BLO-.,DUwN CABINET PROCESS RADIATION MONITORING SYSTEM CABINET I
I E &_ 6 I 3' ...:. 6 XIIDCl '-~
CABJ.NET Hl1P857 MISCELLANEOUS DC RELAY PANEL. I
\
REACTOR WATER CLEANUP \,__
HEAT EXC[HANGERS 2 H11P822 TERMINATION CABINET I
--- rrxr1 L __ _
6_ ----~--*-*t----- ***----+--1---1-+--------- H11P823 TERM!NA TI N CABINET I
~~~~JSR\ *~~~~~bMt~f E~AtK~D H11P868 TERMINATION CABINET I EMERGENCY 06RBN H11P869 TERMINATION CABINET I EQUIPMENT COOLING op DIVISION I - ~ - - - - , "'0 WP..TER SYSTEM, ~ i 3 Hl!P891 TERMINATION C.ABINET BOP I FLOOR EL. 613'-6 '
I'-
I H11P898A AUTOMATIC DIGITAL LOAD SEQUENCE CABINET I DIVISION I:
F
-MAKEUP TANK
-PUMP i
~
DRYwiELL MONITORING INSTRUMENT RACK J --- I ---.... -1 4 H11F'8B6 HllP878 HllP609 Hllf-~610 He ELIMINATION RELAY CABINET TERMINATI N CABINET TRIP SYSTEM REACTCR PROTECTION CABINET REACTOR PROTECTION SYSTEM TEST MONITORING CABINET I
I I
lI F
-MAKE-UP PUMP FJlJ-L H o. DIVISION Il HllP611 TRIP SYSTEM REACTOR PROTECTION CABINET II
-PUMP AREA E2150FOOSA ""l ~O,
, I .
COOLING UNIT FLOOR EL. 626-0 I II DRYWELL MO~IJO. ,...
1*~
/13 5 H11P614 NSSS TEMPERATURE RECORDING AND LEAK DETECTION CABINET I, II HEAT EXCHANGER vii I ,
I 'J.
, * ~ I NST.RUMENli R CK~ ,-:;K\Xkeo,,
Ill I 6 H11P887 Hl1P608 He ELIMINATION RELAY CABINET POwER RANGE NEUTRON M NIT rllNG CABINET II 1, II P4400B001C I r _ _ ,____,, Hl1P606 STARTING RANGE NEUTRON MONITORING CABINET I, II I .__"___ __, Hl1P855 TERMINATION CABINET, AUX BLR BFP-MISCELLANEOUS AND ESS II lORB ~ TURBINE H11P853 H11P854 TERMINATION CABINET, VENT SYSTEM TERMINATION CABINET, R-., COOLING, DRY-.,ELL COOLING, II II I -~ BUILDING COOLING TO-.,ERS z
p:i REACTOR \./ATER '"" TB-STEAM (\J CL CLEANUP PUr!PjS """ TUNNEL /
7 H11P845 H11P612 4160V SYS SER METER PANEL FEEDwATER AND RECIRCULATICN INSTRUMENT ,ACK II II
'° 0 H11P618 H11P626 RHR RELAY CABINET CORE SPRAY CABINET II I
ATCOWJ 112 CCl.tJ A ,oc. I ,;:
M,l.ill4Vl
\./RAP DD-013-lP H11P623 Hl1P627 OUTBOARD VAL VE RELAY CABINET CORE SPRAY CABINET II II E ---1 P\: J\, :Al I i !*-----+--+-*- -** &:Xid1 ll I CT~ 8 Hl!P870 MISCELLANEOUS DC RELAY PANEL II E
REA /
AYS JUNNE 9 Hl!P898B AUTOMATIC DIGITAL LOAD SEQUENCING CABINET II
(/) / 06AB- ," @ ~
'-~LJ p:i 47 ~~', ERSON CL F112f. BIZflA.I( I'J 93 PERSONNEL "" ' ' '--ICHANG '
'o 10 Hl!P884 PROCESS RADIATICN MONITORING SYSTEM CABINET II
'° 0 T11;'.AY!c> AIR LOCK ROO ' I OP*Ooi oc-oa.o L-----.
?B WRAP........V L------.....1
, >- lP-040 1' 04 AB.:_ IC-030 L.---1 AB V.E TOP OF WALL AIR LDC ~
0'° ~~I J t, ~
~' --t-- ~
EL. 633'-9'
'V
. AB CHASE j__-:;::::c:::::=- 480 V SWITCHGEAR D / ~VISION II N2
............_ E 215 0FOO 5 B ___.-_.,,,,., ~ DIVISION I D REACTOR VESSEL I , '
BOTTLES RACK T 49P401 ~ iP-038__,.,,. 1 ' , \ ,,,,,,,_, I LEVEL AND PRESSURE 06RBS FLOqR ,,EL. P4400B001D IP-OS( * . ~nJ 1 -_1_1 ----4160 V SWITCHGEAR INSTRUMENT RACK,DtJ---1'
' 2 613- 6 ~ IATCOLN "TbF DIVISION I DIVISION Il -
/
I !:OW ti TD t'2.
11:t~+~-----
~
- ROOF OF Al R LOCK AT EL 622-6 I II IS A Fl RE RA TED SEPARATION
- - ****-- l V'{ J (TECH. SPEC.) BARRIER DD-0 2 5-2C -----::1. I II 00
\./RAP- -+---WALL ABO\IE EL 622-6 IS A Fl RE RATFD SEPARATION I
EMERGENCY OSRBS 1--~ ~ I ~
(TECH, SPEC~ BARRIER (NOT RATED BELOW EL 622'..6")
EQUIPMENT COOLING \ 0 C
\v'ATER SYSTEM DIVISION I !
COLUMN ~
co I
I N DRAWIN A-2406 ~
0J I
l{)
C 9 TO 10 AND loci NOTES
- , ,< 'l!!illh" """" FLOOR ~" 's."" EL HEAT EXCHANGER~ COLUMN A TD B l' ' I ' I. FDR FIRE PROTECTION LEGEND DESIGNATION SEE DwG, A-2400, r' Nllillll!W P4;400B001B '< t:: I,;' - A ,Y2 " 2, REFER TO DRA-.,ING A-2400 FOR FIRE DETECTION ZONE VERSUS UFSAR FIRE ZONE P4400B001A CROSS REFERENCE,
~ E1150F068B
> L-J.C-0,.j
"' II MCC,DIV!SION IJ 04AB
,'11,
-~ #, 04AB-DIV 2 6A721-2405
.. I E~AERGENCY EQUIPMENT COOLING EQUIPMENT. AREA LATEST REVISION y I L RHR HEAT EXCHANGER W,A.TER SYSTEtv1, DIVISION II
' - PUMP ,,:1,REi\ COOLING UNIT DIVISION I REMOTE ESSENTIAL SWITCHGEAR PUMP SHUTDOWN PANEL ROOM COOLING UNITS RAIL CAR AIR LOCK .__ MAKEUP TANK B ROOF EL. 6101-o '----MAKE-UP PUMP B HEAT EXCHANGER------' !NON-NUCLEAR SAFETY RELATEDI THIS IS A MICROSTATION PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED, THIS DRAWRlG WAS REFORMA'ITED BY MICROSTATION AT REVISION "'!/'. ALL INC.CODE Detroit Edison Fermi 2 y IDCD'S INCORPORATED, PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MICROFil.M IN DOCUMENT CONTROL.
PREPARED EY u
DATE TlTLF. FIRE PROTECTION EVALUATION REACTOR AND AUXILIARY BUILDINGS A PORTION OF THJ.S DRAWING TSR-36721, REV, ¢ IS AFFECTED BY THE FOU..OWING:
SECOND FLOOR - PLAN - EL. 613'-6" I TC CBANGE DOCUUENT CHECKED EIY DATE I A 1DTHER REVISIONS: APERTURE CARD TITLE I A REF, LCR 11-017-UFS FIRE PROT EVAL REB & AUX 2ND FL Af'PROYJ!lJJ. _BY DATE I PLANT lDEN'l'lFICATION SYSTEM NUMBER ARMS RECIPIENT #
T8000, TOOOO PREPARED BY S, EISENMANN fbAtE I C:ir:li:D 6/9/11 1vl, .
_.._ - ....BYl'1 DATE
~/11, /toil OTHER APPROVALS DATE DOCUMENT TYPE CODEDDDACS NUC OPS FlLE NO.I DATE ISSUED TO JS
,so, 1 '7a1-11 APPROVED BY '-Iv~=~
'.J< .s .<..
,l- DATE
[,21-11 EDP POSTING ENTRIES REQUIRE THE ADDITION OF THE ARMS STATUS CODE:
l!ll'.t'HER "AFC" OR "ASB" DRAWING NUMBER 6 A? 21- 2 4 0 5 REV.
y 8 7 6 5 4 3 2 1 .i
'