ML20263D927

From kanterella
Jump to navigation Jump to search

Marked-up Elem Diag Main Fw Pump 3A Turb Reset & Trip Ckt, Interim Drawing.Sheet FW-38.No Revision Date
ML20263D927
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/23/1982
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20070K744 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.1.1, TASK-2.E.1.2, TASK-TM B-208-032-FW-38, B-208-32-FW-38, TAC-44673, NUDOCS 8301130127
Download: ML20263D927 (1)


Text