ML20263J124
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
|---|---|
Initiation
Administration Questions
Results
Other: ML19296C589, ML19343A810, ML20263J121, ML20263J124, ML20263J132, ML20263J142, ML20263T499, ML20263T501, ML20263T504, ML20263T507, ML20263T509, ML20263T512, ML20263T514, ML20263T516 | |
MONTHYEARML20263J0711972-07-10010 July 1972
[Table View]Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly D (48 of 50), as-built Project stage: Other ML20263J0781972-07-10010 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly C Project stage: Other ML20263J0731972-07-10010 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly a, as-built Project stage: Other ML20263J0751972-07-18018 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly B (46 of 50), as-built Project stage: Other ML20263J0831979-06-0606 June 1979 Piping & Instrument Diagram HP & Auxiliary Turbines System. Sheet 1 of 3.Revision Date Illegible Project stage: Other ML19208D6001979-09-20020 September 1979 Summary of 790830 Meeting W/Utils in Bethesda,Md Re Preliminary Results of Auxiliary Feedwater Sys Reliability Study Project stage: Meeting ML19250A8351979-10-18018 October 1979 Responds to Requiring Util Commitment to Action Re NUREG-0578, TMI-2 Lessons Learned Task Force Status Rept. Forwards Implementation Plan Project stage: Request ML19210D9031979-11-19019 November 1979 Responds to NRC 791030 Request for Review of Util 791018 Response to NUREG-0578 Re Auxiliary Feedwater Sys.Sys Satisfies NRC short-term Position.Backup Capabilities Ensure That Water Reaches once-through Steam Generator Project stage: Request ML16138A4231979-12-17017 December 1979 Notification of 791220 Meeting W/B&W & B&W Licensees in Bethesda,Md to Discuss Control Rod Guide Tube Wear Project stage: Request ML19296C5891980-02-18018 February 1980 Forwards Empirical Data Re Loading of Auxiliary Feedwater Pumps Onto Diesel Generator Powered Bus.Info Obtained During Performance of Test Procedure 600-21 During Initial Startup Testing Project stage: Other ML19290E2891980-02-19019 February 1980 Forwards Auxiliary Sys Branch Position Re Auxiliary Feedwater Sys & Request for Adddl Info as Part of Followup to B&W 1979 Plant Shutdown Orders Project stage: Other ML19305A9911980-02-23023 February 1980 Summary of 800212 & 791129 Meetings W/Licensee in Bethesda, MD Re long-term Upgrading Requirements for Site Auxiliary Feedwater Sys Project stage: Meeting ML16245A4951980-02-24024 February 1980 Summary of 791108 Meeting W/B&W Owners Group in Bethesda,Md Re Responses to IE Bulletin 79-05C Project stage: Meeting ML19296D6791980-02-26026 February 1980 Forwards Comments & Requirements for Continued Facility Auxiliary Feedwater Sys Upgrade.Commitment to Provide Requested Info &/Or Design Mods Must Be within 15 Days Project stage: Other ML19309A4911980-03-18018 March 1980 Responds to NRC Re Requirements for Continued Upgrade of Auxiliary Feedwater Sys.Util Will Update Auxiliary Feedwater Reliability Study & Will Submit New Tech Specs by 800501 Project stage: Other ML19262D0211980-04-14014 April 1980 Withdraws 800308 Commitment Concerning Part B,Item 9 of NRC Re Proposed Mod of Auxiliary Feedwater Sys Operating Procedure A.51.Approval Would Imply Plant Could Be Safely Shutdown W/O Offsite Power or Diesel Generators Project stage: Other ML20263J0951980-04-21021 April 1980 Plant Areas Conduit Arrangement Plan at Turbine Deck. Sheet 2 of 2 Project stage: Other ML20263J0911980-04-21021 April 1980 Turbine Building Arfa II Conduit & Tray Arrangement Plan at Ground & Mezzanine Floor. Sheet 2 of 2 Project stage: Other ML20263J0991980-04-21021 April 1980 Turbine Building Area Conduit & Tray Arrangement Plan at Mezzanine Floor. Sheet 2 of 2 Project stage: Other ML20263J1011980-04-21021 April 1980 Turbine Building Area Conduit & Tray Arrangement Plan at Ground Floor. Sheet 1 of 1 Project stage: Other ML20263J1041980-04-21021 April 1980 Auxiliary Building Area - B Class II Conduits & Class I & II Tray Arrangement - Plan at Turbine Deck. Sheet 1 of 1 Project stage: Other ML20263J0631980-04-25025 April 1980 885-NI/RPS - Schematic Turbine Trip Subassembly C Project stage: Other ML19323E3381980-05-14014 May 1980 Forwards Addl Info Re Auxiliary Feedwater Sys Per 800226 Request Project stage: Other ML19343A8121980-07-24024 July 1980 Auxiliary Feedwater Sys for Smud Project stage: Other ML20263J1081980-08-10010 August 1980 Cm&D Equipment OTSG Level Sensing Project stage: Other ML20263J0861980-08-20020 August 1980 Figure 3.1-1 Auxiliary Feedwater System P&Jid Project stage: Other ML20263J0801980-09-0808 September 1980 Piping & Instrument Diagram HP & Auxiliary Turbines System. Revision Illegible Project stage: Other ML20263J0681980-09-10010 September 1980 885-NI/RPS - Schematic Main Feed Water Pump Trip Subassembly a Project stage: Other ML20263J0661980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly B Project stage: Other ML20263J0591980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly C Project stage: Other ML20263J0561980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Sub Assembly Project stage: Other ML20263J0621980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly E Project stage: Other ML19343A8101980-11-17017 November 1980 Forwards B&W Upgraded Design, Auxiliary Feedwater Sys for Smud. Requests NRC Approval Prior to Design Freeze & Preparation of Equipment Purchase Specs on 801205.Oversize Drawings Available in Central Files Project stage: Other ML19339C9401981-01-22022 January 1981 Advises That Util 801117 Preliminary Auxiliary Feedwater Sys Upgrade Design Is Acceptable.Licensee Must Provide Schedules for Design Submittals,Tech Specs & Final Implementation Project stage: Other ML20263T5041981-02-20020 February 1981 EFIC Organization Project stage: Other ML20263J1421981-02-20020 February 1981 EFIC Symbology Project stage: Other ML20263J1321981-02-20020 February 1981 EFIC Trip Test Philosophy Project stage: Other ML20263J1241981-02-20020 February 1981 EFIC Logic 6 Vector Logic Project stage: Other ML20263J1211981-02-20020 February 1981 Trip Logic Project stage: Other ML20263J1181981-02-20020 February 1981 EFIC Logic 3 Steam Generator Pressure Project stage: Other ML20263J1291981-02-20020 February 1981 EFIC Logic 5 Initiate Logic Project stage: Other ML20263J1261981-02-20020 February 1981 EFIC Logic 12 Steam Generator Control Project stage: Other ML20263J1101981-02-20020 February 1981 EFIC Logic 1 Steam Generator a Level Input Project stage: Other ML20263J1141981-02-20020 February 1981 EFIC Logic 2 Steam Generator B Level Input Project stage: Other ML20040B4231981-04-30030 April 1981 Auxiliary Feedwater Sys Upgrade Reliability Analysis for Rancho Seco Nuclear Generating Station Unit 1 Project stage: Other ML20009C5331981-07-17017 July 1981 Repeats & Notarizes Util 810713 Response to NRC 810210 Generic Ltr 81-14 Re Seismic Qualification of Auxiliary Feedwater Sys Project stage: Other ML20263J1531981-09-0808 September 1981 One Line Diagram 4160 Volt System. Sheet 6.No Revision Date Project stage: Other ML20263J0881981-09-0808 September 1981 Anticipatory Reactor Trip System Instrument Installation. Sheet 1 of 2 Project stage: Other ML20263J1481981-09-0808 September 1981 One Line Diagram 4160 Volt System. Sheet 7.No Revision Date Project stage: Other ML20038B5231981-11-30030 November 1981 Forwards Auxiliary Feedwater Sys Flow Evaluation Verifying That Existing Flow Capacity Is Adequate to Meet Sys Requirements Per ALAB-655 & NRC .Abnormal Transient Operator Guidelines Will Be Submitted by 820701 Project stage: Other 1980-04-14 |
| ML20263J124 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 02/20/1981 |
| From: | BABCOCK & WILCOX CO. |
| To: | SACRAMENTO MUNICIPAL UTILITY DISTRICT |
| Shared Package | |
| ML20010G015 | List:
|
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.1.1, TASK-2.E.1.2, TASK-2.K.2, TASK-TM 1122925, 1122925C, TAC-43190, TAC-44673, NUDOCS 8109230148 | |
| Download: ML20263J124 (1) | |
Similar Documents at Rancho Seco | |
|---|---|
Text