Other: ML19262D021, ML19290E289, ML19296D679, ML19309A491, ML19323E338, ML19339C940, ML19343A810, ML19343A812, ML20009C533, ML20023C118, ML20028B195, ML20028E870, ML20038B523, ML20040B418, ML20040B423, ML20062A475, ML20204G206, ML20263D240, ML20263D295, ML20263D298, ML20263D301, ML20263D420, ML20263D425, ML20263D429, ML20263D430, ML20263D432, ML20263D440, ML20263D449, ML20263D456, ML20263D459, ML20263D463, ML20263D483, ML20263D494, ML20263D879, ML20263D883, ML20263D885, ML20263D888, ML20263D892, ML20263D894, ML20263D898, ML20263D901, ML20263D905, ML20263D908, ML20263D911, ML20263D913, ML20263D916, ML20263D918, ML20263D921, ML20263D924, ML20263D927... further results
|
MONTHYEARML20263J0711972-07-10010 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly D (48 of 50), as-built Project stage: Other ML20263J0781972-07-10010 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly C Project stage: Other ML20263J0731972-07-10010 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly a, as-built Project stage: Other ML20263J0751972-07-18018 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly B (46 of 50), as-built Project stage: Other ML20263J0831979-06-0606 June 1979 Piping & Instrument Diagram HP & Auxiliary Turbines System. Sheet 1 of 3.Revision Date Illegible Project stage: Other ML19208D6001979-09-20020 September 1979 Summary of 790830 Meeting W/Utils in Bethesda,Md Re Preliminary Results of Auxiliary Feedwater Sys Reliability Study Project stage: Meeting ML19250A8351979-10-18018 October 1979 Responds to Requiring Util Commitment to Action Re NUREG-0578, TMI-2 Lessons Learned Task Force Status Rept. Forwards Implementation Plan Project stage: Request ML19210D9031979-11-19019 November 1979 Responds to NRC 791030 Request for Review of Util 791018 Response to NUREG-0578 Re Auxiliary Feedwater Sys.Sys Satisfies NRC short-term Position.Backup Capabilities Ensure That Water Reaches once-through Steam Generator Project stage: Request ML16138A4231979-12-17017 December 1979 Notification of 791220 Meeting W/B&W & B&W Licensees in Bethesda,Md to Discuss Control Rod Guide Tube Wear Project stage: Request ML19290E2891980-02-19019 February 1980 Forwards Auxiliary Sys Branch Position Re Auxiliary Feedwater Sys & Request for Adddl Info as Part of Followup to B&W 1979 Plant Shutdown Orders Project stage: Other ML19305A9911980-02-23023 February 1980 Summary of 800212 & 791129 Meetings W/Licensee in Bethesda, MD Re long-term Upgrading Requirements for Site Auxiliary Feedwater Sys Project stage: Meeting ML16245A4951980-02-24024 February 1980 Summary of 791108 Meeting W/B&W Owners Group in Bethesda,Md Re Responses to IE Bulletin 79-05C Project stage: Meeting ML19296D6791980-02-26026 February 1980 Forwards Comments & Requirements for Continued Facility Auxiliary Feedwater Sys Upgrade.Commitment to Provide Requested Info &/Or Design Mods Must Be within 15 Days Project stage: Other ML19309A4911980-03-18018 March 1980 Responds to NRC Re Requirements for Continued Upgrade of Auxiliary Feedwater Sys.Util Will Update Auxiliary Feedwater Reliability Study & Will Submit New Tech Specs by 800501 Project stage: Other ML19262D0211980-04-14014 April 1980 Withdraws 800308 Commitment Concerning Part B,Item 9 of NRC Re Proposed Mod of Auxiliary Feedwater Sys Operating Procedure A.51.Approval Would Imply Plant Could Be Safely Shutdown W/O Offsite Power or Diesel Generators Project stage: Other ML20263J0951980-04-21021 April 1980 Plant Areas Conduit Arrangement Plan at Turbine Deck. Sheet 2 of 2 Project stage: Other ML20263J0911980-04-21021 April 1980 Turbine Building Arfa II Conduit & Tray Arrangement Plan at Ground & Mezzanine Floor. Sheet 2 of 2 Project stage: Other ML20263J0991980-04-21021 April 1980 Turbine Building Area Conduit & Tray Arrangement Plan at Mezzanine Floor. Sheet 2 of 2 Project stage: Other ML20263J1011980-04-21021 April 1980 Turbine Building Area Conduit & Tray Arrangement Plan at Ground Floor. Sheet 1 of 1 Project stage: Other ML20263J1041980-04-21021 April 1980 Auxiliary Building Area - B Class II Conduits & Class I & II Tray Arrangement - Plan at Turbine Deck. Sheet 1 of 1 Project stage: Other ML20263J0631980-04-25025 April 1980 885-NI/RPS - Schematic Turbine Trip Subassembly C Project stage: Other ML19323E3381980-05-14014 May 1980 Forwards Addl Info Re Auxiliary Feedwater Sys Per 800226 Request Project stage: Other ML19343A8121980-07-24024 July 1980 Auxiliary Feedwater Sys for Smud Project stage: Other ML20263J1081980-08-10010 August 1980 Cm&D Equipment OTSG Level Sensing Project stage: Other ML20263J0861980-08-20020 August 1980 Figure 3.1-1 Auxiliary Feedwater System P&Jid Project stage: Other ML20263J0801980-09-0808 September 1980 Piping & Instrument Diagram HP & Auxiliary Turbines System. Revision Illegible Project stage: Other ML20263J0681980-09-10010 September 1980 885-NI/RPS - Schematic Main Feed Water Pump Trip Subassembly a Project stage: Other ML20263J0661980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly B Project stage: Other ML20263J0591980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly C Project stage: Other ML20263J0561980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Sub Assembly Project stage: Other ML20263J0621980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly E Project stage: Other ML19343A8101980-11-17017 November 1980 Forwards B&W Upgraded Design, Auxiliary Feedwater Sys for Smud. Requests NRC Approval Prior to Design Freeze & Preparation of Equipment Purchase Specs on 801205.Oversize Drawings Available in Central Files Project stage: Other ML19339C9401981-01-22022 January 1981 Advises That Util 801117 Preliminary Auxiliary Feedwater Sys Upgrade Design Is Acceptable.Licensee Must Provide Schedules for Design Submittals,Tech Specs & Final Implementation Project stage: Other ML20263J1181981-02-20020 February 1981 EFIC Logic 3 Steam Generator Pressure Project stage: Other ML20263J1241981-02-20020 February 1981 EFIC Logic 6 Vector Logic Project stage: Other ML20263J1291981-02-20020 February 1981 EFIC Logic 5 Initiate Logic Project stage: Other ML20263J1211981-02-20020 February 1981 Trip Logic Project stage: Other ML20263J1321981-02-20020 February 1981 EFIC Trip Test Philosophy Project stage: Other ML20263J1261981-02-20020 February 1981 EFIC Logic 12 Steam Generator Control Project stage: Other ML20263J1421981-02-20020 February 1981 EFIC Symbology Project stage: Other ML20263J1101981-02-20020 February 1981 EFIC Logic 1 Steam Generator a Level Input Project stage: Other ML20263J1141981-02-20020 February 1981 EFIC Logic 2 Steam Generator B Level Input Project stage: Other ML20040B4231981-04-30030 April 1981 Auxiliary Feedwater Sys Upgrade Reliability Analysis for Rancho Seco Nuclear Generating Station Unit 1 Project stage: Other ML20009C5331981-07-17017 July 1981 Repeats & Notarizes Util 810713 Response to NRC 810210 Generic Ltr 81-14 Re Seismic Qualification of Auxiliary Feedwater Sys Project stage: Other ML20263J1531981-09-0808 September 1981 One Line Diagram 4160 Volt System. Sheet 6.No Revision Date Project stage: Other ML20263J0881981-09-0808 September 1981 Anticipatory Reactor Trip System Instrument Installation. Sheet 1 of 2 Project stage: Other ML20263J1481981-09-0808 September 1981 One Line Diagram 4160 Volt System. Sheet 7.No Revision Date Project stage: Other ML20038B5231981-11-30030 November 1981 Forwards Auxiliary Feedwater Sys Flow Evaluation Verifying That Existing Flow Capacity Is Adequate to Meet Sys Requirements Per ALAB-655 & NRC .Abnormal Transient Operator Guidelines Will Be Submitted by 820701 Project stage: Other ML20040B4181982-01-18018 January 1982 Forwards Auxiliary Feedwater Sys Upgrade Reliability Analysis for Rancho Seco Nuclear Generating Station Unit 1. Rept Provides Info Requested in NUREG-0737 Item II.E.1.1 Project stage: Other ML20028E8791982-07-0606 July 1982 Responds to 820507 Request for Addl Info Re Seismic Qualifications of Auxiliary Feedwater Sys.Seismic Qualifications Described for Items Questioned Project stage: Request 1980-04-21
[Table View] |
Text
..
_m k
,(#
Io UNITED STATES g
y
)#(
g NUCLEAR REGULATORY COMMISSION
.E WASHINGTON, D. C. 20555 t
i January 22, 1981
%, *..../
Y y
Docket No. 50-312 Mr. J. J. Mattimoe Assistant General Manager and Chief Engineer Sacramento Municipal Utility District 6201 S Street P. O. Box 15830 Sacramento, California 95813
Dear Mr. Mattimoe:
We have reviewed your preliminary Auxiliary Feedwater System Upgrade design description for Rancho Seco, Unit No. I which was submitted by letter dated November 17, 1980. On the basis of this description and your presentation at our meeting with you on September 4,1980, we have determined that the preliminary design description is acceptable in concept and that you should proceed with your design.
Since this activity will require our review and acceptance prior to implementation, you should provide design submittals on a timely basis to allow for our review and any revisions which may result from our review. Your submittals should not only identify those areas of compliance with applicable General Design Criteria, Standards, CoJes and Standard Review Plans but those areas not in compliance with justifications for noncompliance.
We request that you submit a plan which will provide schedules for design submittals for our review, a schedule for submittal of Technical Specification which will be required, and a schedule for final implementation with time allowed for our review. This plan is requested within 30 days from receipt of this letter.
Sincerely, N
(
Jh l
ert W. Reid, Chief Operating Reactors Branch #4 Division of Licensing cc:
See next page 810e 120 Lf 73
Sacramento Municipal Utility Rancho Seco, Docket No. 50-312 District cc w/ enclosure (s):
David S. Kaplan, Secretary and Christopher Ellison, Esq.
General Counsel Dian Grueuich, Esq.
6201 S Street California Energy Commission P. O. Box 15830 1111 Howe Avenue Sacramento, California 95813 Sacramento, California 95825 Sacramento County Ms. Eleanor Schwartz Board of Supervisors California State Office 827 7th Street, Room 424 600 Pennsylvania Avenue, S.E., Rm. 201 Sacramento, California 95814 Washington, D. C.
20003 Business and Municipal Department Docketing and Service Section Sacramento City-County Library Office of the Secretary 828 I Street U.S. Nuclear Regulatory Comission Sacramento, California 95814 Washington, D. C.
20555 Resident. Inspector / Rancho Seco Director, Criteria and Standards c/o U. S. N. R. C.
Division 14410 Twin Cities Road Office of Radiation Programs (ANR-460)
Herald, CA 95638 U. S. Environmental Protection Agency Washington, D. C.
20460 g
Atomic Safety & Licensing Board Panel U.S. Nuclear Regulatory Comission G. S. Environmental Protection Agency Washington, D. C.
20555 l
Region IX Office ATTN: EIS C0ORDINATOR Mr. Frederick J. Shon 215 Fremont Street Atomic Safety and Licensing Board San Francisco, California 94111 Panel U.S. Nuclear Regulatory Commission Mr. Robert B. Borsum Washington, D. C.
20555 Babcock & Wilcox Nuclear Power Generation Division Elizabeth S. Bowers, Esq.
Suite 420, 7735 Old Georgetown Road Chairman. Atomic Safety and Bethesda, Maryland 20014 Licensing Board Panel U.S. Nuclear Regulatory Comission Thomas Baxter, Esq.
Washington, D. C.
20555 l
Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Mr. Michael R. Eaton Washington, D. C.
20036 Energy Issues Coordinator Sierra Club Legisiative Office Herbert H. Brown, Esq.
1107 9th Street, Room 1020 Lawrence Coe Lanpher, Esq.
Sacramento, California 95814 Hill, Christopher and Phillips, P.C.
l 1900 M Street, N.W.
Atomic Safety and Licensing Board Washington, D. C.
20036 Panel U.S. Nuclear Regulatory Comission Helen Hubbard Washington, D. C.
20555
,P. O. Box 63 l
Sunol, California 94586
i i
]
Sacramento Municipal Utility District cc w/o enclosure (s):
Atomic -Safety and Licensing Board Panel l'
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Atomic Safety and Licensing Appeal i
Board Panel U. S. Nuclear Regulatory Commission Washington, D.C.
20555 i
i f
California Department of Health i
ATTN: Chief, Environmental Radiation Control Unit l
l Radiological Health Section 714 P Street, Room 498 Sacramento, California
[
i e
6 I
e i
i t
l l
h
)
t i
I
?
[
l t
i b
I r
-w' y
7%"-f v
"gg p,r--y--w-%-yw--
9 y
v ma g1y -
+y-p 1--
e
-yW+
-wme=
a w.ygm 9zMn'-
g w
y g---
4y--ytnevsp ww y-ep s e i (er9-e-et---+gp. y g t-eny--py 9
et y-s