Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20263J071 | 10 July 1972 | BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.) | Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly D (48 of 50), as-built | Other |
ML20263J073 | 10 July 1972 | BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.) | Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly a, as-built | Other |
ML20263J078 | 10 July 1972 | BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.) | Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly C | Other |
ML20263J075 | 18 July 1972 | BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.) | Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly B (46 of 50), as-built | Other |
ML20263J083 | 6 June 1979 | SACRAMENTO MUNICIPAL UTILITY DISTRICT BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.) | Piping & Instrument Diagram HP & Auxiliary Turbines System. Sheet 1 of 3.Revision Date Illegible | Other |
ML20263J091 | 21 April 1980 | BECHTEL GROUP INC. | Turbine Building Arfa II Conduit & Tray Arrangement Plan at Ground & Mezzanine Floor. Sheet 2 of 2 | Other |
ML20263J095 | 21 April 1980 | BECHTEL GROUP INC. | Plant Areas Conduit Arrangement Plan at Turbine Deck. Sheet 2 of 2 | Other |
ML20263J099 | 21 April 1980 | BECHTEL GROUP INC. | Turbine Building Area Conduit & Tray Arrangement Plan at Mezzanine Floor. Sheet 2 of 2 | Other |
ML20263J101 | 21 April 1980 | BECHTEL GROUP INC. | Turbine Building Area Conduit & Tray Arrangement Plan at Ground Floor. Sheet 1 of 1 | Other |
ML20263J104 | 21 April 1980 | BECHTEL GROUP INC. | Auxiliary Building Area - B Class II Conduits & Class I & II Tray Arrangement - Plan at Turbine Deck. Sheet 1 of 1 | Other |
ML20263J063 | 25 April 1980 | BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.) | 885-NI/RPS - Schematic Turbine Trip Subassembly C | Other |
ML20263J108 | 10 August 1980 | BABCOCK & WILCOX CO. | Cm&D Equipment OTSG Level Sensing | Other |
ML20263J086 | 20 August 1980 | BABCOCK & WILCOX CO. BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.) | Figure 3.1-1 Auxiliary Feedwater System P&Jid | Other |
ML20263J080 | 8 September 1980 | SACRAMENTO MUNICIPAL UTILITY DISTRICT BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.) | Piping & Instrument Diagram HP & Auxiliary Turbines System. Revision Illegible | Other |
ML20263J068 | 10 September 1980 | BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.) | 885-NI/RPS - Schematic Main Feed Water Pump Trip Subassembly a | Other |
ML20263J066 | 10 September 1980 | BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.) | 885-NI/RPS - Schematic Turbine Trip Subassembly B | Other |
ML20263J062 | 10 September 1980 | BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.) | 885-NI/RPS - Schematic Turbine Trip Subassembly E | Other |
ML20263J059 | 10 September 1980 | BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.) | 885-NI/RPS - Schematic Turbine Trip Subassembly C | Other |
ML20263J056 | 10 September 1980 | BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.) | 885-NI/RPS - Schematic Turbine Trip Sub Assembly | Other |
ML20263J110 | 20 February 1981 | BABCOCK & WILCOX CO. | EFIC Logic 1 Steam Generator a Level Input | Other |
ML20263J114 | 20 February 1981 | BABCOCK & WILCOX CO. | EFIC Logic 2 Steam Generator B Level Input | Other |
ML20263J118 | 20 February 1981 | BABCOCK & WILCOX CO. | EFIC Logic 3 Steam Generator Pressure | Other |
ML20263J121 | 20 February 1981 | BABCOCK & WILCOX CO. | Trip Logic | Other |
ML20263J124 | 20 February 1981 | BABCOCK & WILCOX CO. | EFIC Logic 6 Vector Logic | Other |
ML20263J126 | 20 February 1981 | BABCOCK & WILCOX CO. | EFIC Logic 12 Steam Generator Control | Other |
ML20263J129 | 20 February 1981 | BABCOCK & WILCOX CO. | EFIC Logic 5 Initiate Logic | Other |
ML20263J132 | 20 February 1981 | BABCOCK & WILCOX CO. | EFIC Trip Test Philosophy | Other |
ML20263J142 | 20 February 1981 | BABCOCK & WILCOX CO. | EFIC Symbology | Other |
ML20263J088 | 8 September 1981 | SACRAMENTO MUNICIPAL UTILITY DISTRICT | Anticipatory Reactor Trip System Instrument Installation. Sheet 1 of 2 | Other |
ML20263J148 | 8 September 1981 | BABCOCK & WILCOX CO. | One Line Diagram 4160 Volt System. Sheet 7.No Revision Date | Other |
ML20263J153 | 8 September 1981 | BECHTEL GROUP INC. | One Line Diagram 4160 Volt System. Sheet 6.No Revision Date | Other |
ML20062A475 | 27 July 1982 | SACRAMENTO MUNICIPAL UTILITY DISTRICT Mattimoe J | Responds to NRC 820711 Telcon Re Annunciation of Manual Bypass of Auxiliary Feedwater Auto Initiation.New Control Sys Will Annunciate in Control Room When Auxiliary Feedwater Auto Initiator Is Bypassed | Other |
ML20058G773 | 27 July 1982 | SACRAMENTO MUNICIPAL UTILITY DISTRICT Mattimoe J | Responds to NRC 820721 Request for Addl Info Re TMI Action Item II.E.1.2 Concerning Auxiliary Feedwater Sys Flow Indication.Currently Installed Indicator Will Be Replaced W/Safety Grade Differential Pressure Flow Indicator | Request |
ML20263D965 | 1 September 1982 | INC. AUTOMATION INDUSTRIES | B&W Emergency Feedwater Initiation and Control System (EFIC) Wiring Diagram. Sheet 6 of 7.Consists of 3 Aperture Cards | Other |
ML20263D961 | 1 September 1982 | INC. AUTOMATION INDUSTRIES | B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 5 of 7.Consists of 2 Aperture Cards | Other |
ML20263D957 | 1 September 1982 | INC. AUTOMATION INDUSTRIES | B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 4 of 7.Consists of 2 Aperture Cards | Other |
ML20263D967 | 1 September 1982 | INC. AUTOMATION INDUSTRIES | B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 7 of 7.Consists of 2 Aperture Cards | Other |
ML20263D951 | 2 September 1982 | INC. AUTOMATION INDUSTRIES | B&W Emergency Feedwater Initiation and Control System (EFIC) Wiring Diagram. Sheet 2 of 7.Consists of 2 Aperture Cards | Other |
ML20263D948 | 2 September 1982 | INC. AUTOMATION INDUSTRIES | B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 1 of 7.Consists of 2 Aperture Cards | Other |
ML20263D955 | 6 September 1982 | INC. AUTOMATION INDUSTRIES | B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 3 of 7.Consists of 2 Aperture Cards | Other |
ML20263D883 | 23 December 1982 | Duke Energy | Marked-up Elem Diag Efic Matrix a Cont and EFW Act a, Interim Drawing.Sheet EF-15.No Revision Date | Other |
ML20263D879 | 23 December 1982 | Duke Energy | Marked-up Elem Diag Mot Drvn Emg Fd Wtr PP3A (EFP-1) Auto Ckt, Interim Drawing.Sheet EF-14.No Revision Date | Other |
ML20263D494 | 23 December 1982 | Duke Energy | Marked-up Elem Diag Mot Drvn Emg Fd PP3A(EFP-1) 416OV Es Swgr 3A & 3A3, Interim Drawing.Sheet EF-01B.No Revision Date. Actual Drawing Number Is B-208-026/EF-01B | Other |
ML20263D483 | 23 December 1982 | Duke Energy | Marked-up Elem Diag Motor Driven Emerg Feed-PP3A, Interim Drawing.Sheet EF-01A.No Revision Date. Actual Drawing Number Is B-208-026/EF-01A | Other |
ML20263D463 | 23 December 1982 | Duke Energy | Marked-up Elem Diag-Index Emergency Feedwater Sys, Interim Drawing.Sheet EF-00.No Revision Date | Other |
ML20263D459 | 23 December 1982 | Duke Energy | Marked-up Alarm Point List Emergency Feedwater Sys, Interim Drawing.No Revision Date | Other |
ML20263D456 | 23 December 1982 | Duke Energy | Marked-up Elem Diag Turb Driven Emer Feed Pp Inlet Iso Vlv ASV-5, Interim Drawing.Sheet AS-01.No Revision Date | Other |
ML20263D449 | 23 December 1982 | Duke Energy | Marked-up Alarm Pt List Aux Steam Sys (As), Interim Drawing.No Revision Date | Other |
ML20263D440 | 23 December 1982 | Duke Energy | Marked-up Elem Diag Main St Line Rupture Press Matrix Select I, Interim Drawing.Sheet FW-47.No Revision Date | Other |
ML20263D432 | 23 December 1982 | Duke Energy | Marked-up Elem Diag Efic Matrices Stm Gen A/Act 1 Mn Stm and Mn Feedwater Isol, Interim Drawing.Sheet FW-58.No Revision Date | Other |