MONTHYEARML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20212J3501999-06-23023 June 1999 Forwards Draft Ltr for Use in Transmitting FERC Rept Re 981008 Audit to Licensee & Copy of FERC Insp Rept ,containing Color Photographs.Without Encls ML20196H9721999-06-23023 June 1999 Requests Attached Request for Addl Info Be Put Into NRC Public Document Room.Encl RAI e-mailed to W Sparkman of Southern Nuclear Operating Co on 990610 IA-96-023, Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier1999-06-18018 June 1999 Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier ML20205N7511999-04-13013 April 1999 Requests That Attached RAI Re TS 3/4.4.7.2e Be Placed in NRC Pdr.Informs That RAI Was Faxed to W Sparkman on 990413 & Will Be Used to Facilitate Discussions During Upcoming Telcon Between NRC & Snoc Staff ML20205M8681999-04-13013 April 1999 Requests That Encl Topics for Discussion Be Made Available in NRC Pdr.Items Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & SNC Staff ML20205J1401999-04-0505 April 1999 Notification of 990419 Meeting with Util to Discuss Licensee Justification of Certain TS Changes Need to Implement Improved Standard Ts.Meeting Was Held in Rockville,Md ML20205G5781999-04-0101 April 1999 Notification of 990416 Meeting with Snoc in Rockville,Md to Discuss Farley Npp,Unit 1 SG Operational Assessment ML20205C8771999-03-31031 March 1999 Requests That Encl questions,e-mailed to W Sparkman of Southern Nuclear Operating Co,Inc,Which Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Util Be Made Available in NRC PDR ML20207J4931999-03-0101 March 1999 Forwards NRC Operator Licensing Exam Repts 50-348/98-300 & 50-364/98-300 (Including Completed & Graded Tests) for Tests Administered on 980313 ML20207J4681999-03-0101 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980313 at Farley NPP ML20202E1621999-01-29029 January 1999 Requests That Encl RAI Be Made Available in NRC Pdr.Subj Document Neither Constitutes Formal Request for Info Nor Represent Formal NRC Position.Encl RAI Faxed on 990129 to W Sparkman of Snoc ML20198H5741998-12-22022 December 1998 Notification of 990107 Meeting with Util in Rockville,Md to Discuss Licensee Justification of Certain TS Changes Needed to Implement Improved Standard TSs ML20197J0501998-12-14014 December 1998 Requests That Encl Memo & Attachments Associated with Task Interface Agreement (TIA 96-023) Fraley License Basis & Acceptability of Kaowool as Electrical Raceway Fire Barrier Be Placed in NRC PDR ML20196H1181998-12-0404 December 1998 Forwards Message Faxed to M Ajluni of Southern Nuclear Operating Co (SNC) on 981204,to Prepare SNC for Conference Call.Message Does Not Constitute Formal Request for Info or Represent Formal NRC Staff Position ML20196E2911998-12-0101 December 1998 Notification of 981215 Meeting with Util in Rockville,Md to Discuss Matters Re Kaowool Fire Barriers Installed at Plant ML20195B7721998-11-12012 November 1998 Forwards Message That Had Been Faxed to M Ajluni on 981112. Purpose of Message Was to Prepare Licensee Personnel for Conference Call Re SG Tube Insp Results for Farley NPP Unit 1 ML20196F7001998-11-0202 November 1998 Notification of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Maryland to Discuss Matters Re Current SG Tube Insps at Farley NPP Unit 1 ML20154L1171998-10-15015 October 1998 Notification of 981026 Meeting with Util in Rockville,Md to Discuss Westinghouse BE-LOCA Abbreviated Reanalysis for Plant,Units 1 & 2 New SG ML20154B0681998-09-29029 September 1998 Notification of 981008 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Repair of SG Tubes ML20154B0411998-09-29029 September 1998 Notification of 981014 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Justification of Certain TS Changes Needed to Implement Improved Std TSs ML20217B1371998-04-21021 April 1998 Forwards Three Documents Associated W/Farley Nuclear Plant, Units 1 & 2-licensing/design Basis for Tornado Missile Protection to Be Made Available in PDR ML20217H4431998-04-0101 April 1998 Forwards Message Faxed on 980401 to M Ajluni of Southern Nuclear Operating Co,Inc (Snc).Purpose of Message Was to Prepare SNC Personnel for Conference Call & Does Not Consitute Formal Request for Info ML20217B1811997-12-18018 December 1997 Discusses Design Insp of Farley Units 1 & 2,for Jan-March of 1997,identified Tornado Missile Protection Issue Re Exhaust Piping & Silencers for EDG for Both Units (Including Station Blackout DG) ML20198S9281997-10-31031 October 1997 Notification of 971120 Meeting W/Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Plans & Schedule for SG Replacement ML20217B1961997-10-15015 October 1997 Discusses Review of Farley Nuclear Plant,Units 1 & 2 Licensing & Design Basis for Protection Against Tornado Missiles at Farley in Accordance w/970402 Memo from RM Gallo ML20217D9721997-09-30030 September 1997 Notification of 971022 Meeting W/Licensee in Rockville,Md to Discuss Licensee Initiatives That Focus on Planned Licensing Actions for FNP & Corrective Measures Related to Problems Considered by Licensee Mgt to Warrant Special Attention ML20216G2151997-09-0505 September 1997 Notification of 970916 Meeting W/Snoc in Rockville,Md to Discuss Improved Standard Technical Specification Conversion Application & Schedule for Submittal ML20236N3231997-08-21021 August 1997 Forwards SER in Response to Licensee 970522 Requested Interpretation of TS 4.8.1.1.2.e for Two Shared EDGs ML20148J8131997-06-16016 June 1997 Notifies of 970701 Meeting W/Util in Rockville,Md to Discuss Util Initiatives That Focus on Planned Licensing Actions for Plant & Corrective Measures Re Problems Considered by Util Mgt ML20141B0131997-06-16016 June 1997 Notification of 970701 Meeting W/Southern Nuclear Operating Co in Rockville,Md to Discuss SNC Initiatives That Focus on Planned Licensing Action for FNP & Corrective Measures. Meeting Cancelled ML20217B2111997-04-0202 April 1997 Informs That During Insp of Farley Units 1 & 2 in Jan-March 1997,NRR Led Insp Team Identified Tornado Missile Protection Issue W/Exhaust Silencers for DG for Both Units ML20236M9961997-03-27027 March 1997 Forwards Response to Questions Re Ventilation Specs for Farley ML20137C2501997-03-20020 March 1997 Forwards Message to M Ajluni of Southern Nuclear Operating Re Preparing Licensee Personnel for Conference Call ML20236M9661997-02-12012 February 1997 Discusses from Southern Nuclear Operating Co Requesting NRC Review Interpretation of Application of TS 3/4.9.13 at Farley Nuclear Plant,Units 1 & 2 During Modes 5 or 6,or When Defueled ML20134B3421997-01-27027 January 1997 Notification of 970205 Meeting W/Listed Attendees in Rockville,Md to Discuss Util Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair Method in Repair of SG ML20197J0751996-11-26026 November 1996 Requests Technical Assistance in Evaluation of Issues Identified During Routine Insp at Plant.Insp Rept Summary with Justification Encl ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20149E9221994-02-18018 February 1994 Responds to 930215 Request from J Strosnider Re Documentation of Concerns Re Plant Two Volt IPC Proposal & Resolution of Public Comments Concerning Voltage Based Repair Criteria ML20058J7101993-11-18018 November 1993 Notification of Significant Licensee Meeting W/Util on on 931123 to Discuss Plant SALP Board Assessment for Period of 930531-0925 IR 05000364/19930261993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931117 in Atlanta,Ga to Discuss Violation 50-364/93-26-01 Re Personnel Error Resulting in Losses of Configuration Control During Performance of Maint & Testing Activities ML20057C3131993-09-15015 September 1993 Notification of Significant Licensee Meeting W/Util on 931013 to Discuss SALP Performance of Facility During Period 920531-0925 ML20056E4221993-08-0606 August 1993 Requests Written Inputs on Performance of Farley Facilities During Completed SALP Cycle 11 During Period 920531-930925 Using Encl Feeder Forms.Salp Board Meeting for Farley Scheduled for 931013 ML20127J5121993-01-19019 January 1993 Notification of 930202-03 Meetings W/Licensee in Columbia,Al Re Safety Audit of Storage Pond Dam & Dike by NRC & FERC ML20126B1451992-12-11011 December 1992 Notification of 921218 Meeting W/Util in Rockville,Md to Discuss Amend Request for Steam Generator Tube Alternate Plugging Criteria ML20058F4581990-11-0505 November 1990 Submits Daily Highlight.Notifies of 901107 Meeting W/Util to Discuss Technical & Regulatory Concerns Re Steam Generator Tube Collapse Under LOCA & Safe Shutdown Earthquake Loads ML20058E0461990-11-0202 November 1990 Notification of 901120 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Actions ML20058E8271990-11-0202 November 1990 Notification of 901106 Meeting W/Licensee in Rockville,Md to Discuss Facility Steam Generators & Use of EPRI Alternative Tube Plugging Criteria.Agenda Encl ML20058H8871990-11-0202 November 1990 Notification of Cancellation of 901120 Meeting W/Util to Discuss Status of Licensing Actions 1999-06-23
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20212J3501999-06-23023 June 1999 Forwards Draft Ltr for Use in Transmitting FERC Rept Re 981008 Audit to Licensee & Copy of FERC Insp Rept ,containing Color Photographs.Without Encls ML20196H9721999-06-23023 June 1999 Requests Attached Request for Addl Info Be Put Into NRC Public Document Room.Encl RAI e-mailed to W Sparkman of Southern Nuclear Operating Co on 990610 IA-96-023, Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier1999-06-18018 June 1999 Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier ML20205N7511999-04-13013 April 1999 Requests That Attached RAI Re TS 3/4.4.7.2e Be Placed in NRC Pdr.Informs That RAI Was Faxed to W Sparkman on 990413 & Will Be Used to Facilitate Discussions During Upcoming Telcon Between NRC & Snoc Staff ML20205M8681999-04-13013 April 1999 Requests That Encl Topics for Discussion Be Made Available in NRC Pdr.Items Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & SNC Staff ML20205J1401999-04-0505 April 1999 Notification of 990419 Meeting with Util to Discuss Licensee Justification of Certain TS Changes Need to Implement Improved Standard Ts.Meeting Was Held in Rockville,Md ML20205G5781999-04-0101 April 1999 Notification of 990416 Meeting with Snoc in Rockville,Md to Discuss Farley Npp,Unit 1 SG Operational Assessment ML20205C8771999-03-31031 March 1999 Requests That Encl questions,e-mailed to W Sparkman of Southern Nuclear Operating Co,Inc,Which Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Util Be Made Available in NRC PDR ML20207J4931999-03-0101 March 1999 Forwards NRC Operator Licensing Exam Repts 50-348/98-300 & 50-364/98-300 (Including Completed & Graded Tests) for Tests Administered on 980313 ML20207J4681999-03-0101 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980313 at Farley NPP ML20202E1621999-01-29029 January 1999 Requests That Encl RAI Be Made Available in NRC Pdr.Subj Document Neither Constitutes Formal Request for Info Nor Represent Formal NRC Position.Encl RAI Faxed on 990129 to W Sparkman of Snoc ML20198H5741998-12-22022 December 1998 Notification of 990107 Meeting with Util in Rockville,Md to Discuss Licensee Justification of Certain TS Changes Needed to Implement Improved Standard TSs ML20197J0501998-12-14014 December 1998 Requests That Encl Memo & Attachments Associated with Task Interface Agreement (TIA 96-023) Fraley License Basis & Acceptability of Kaowool as Electrical Raceway Fire Barrier Be Placed in NRC PDR ML20196H1181998-12-0404 December 1998 Forwards Message Faxed to M Ajluni of Southern Nuclear Operating Co (SNC) on 981204,to Prepare SNC for Conference Call.Message Does Not Constitute Formal Request for Info or Represent Formal NRC Staff Position ML20196E2911998-12-0101 December 1998 Notification of 981215 Meeting with Util in Rockville,Md to Discuss Matters Re Kaowool Fire Barriers Installed at Plant ML20195B7721998-11-12012 November 1998 Forwards Message That Had Been Faxed to M Ajluni on 981112. Purpose of Message Was to Prepare Licensee Personnel for Conference Call Re SG Tube Insp Results for Farley NPP Unit 1 ML20196F7001998-11-0202 November 1998 Notification of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Maryland to Discuss Matters Re Current SG Tube Insps at Farley NPP Unit 1 ML20154L1171998-10-15015 October 1998 Notification of 981026 Meeting with Util in Rockville,Md to Discuss Westinghouse BE-LOCA Abbreviated Reanalysis for Plant,Units 1 & 2 New SG ML20154B0681998-09-29029 September 1998 Notification of 981008 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Repair of SG Tubes ML20154B0411998-09-29029 September 1998 Notification of 981014 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Justification of Certain TS Changes Needed to Implement Improved Std TSs ML20217B1371998-04-21021 April 1998 Forwards Three Documents Associated W/Farley Nuclear Plant, Units 1 & 2-licensing/design Basis for Tornado Missile Protection to Be Made Available in PDR ML20217H4431998-04-0101 April 1998 Forwards Message Faxed on 980401 to M Ajluni of Southern Nuclear Operating Co,Inc (Snc).Purpose of Message Was to Prepare SNC Personnel for Conference Call & Does Not Consitute Formal Request for Info ML20217B1811997-12-18018 December 1997 Discusses Design Insp of Farley Units 1 & 2,for Jan-March of 1997,identified Tornado Missile Protection Issue Re Exhaust Piping & Silencers for EDG for Both Units (Including Station Blackout DG) ML20198S9281997-10-31031 October 1997 Notification of 971120 Meeting W/Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Plans & Schedule for SG Replacement ML20217B1961997-10-15015 October 1997 Discusses Review of Farley Nuclear Plant,Units 1 & 2 Licensing & Design Basis for Protection Against Tornado Missiles at Farley in Accordance w/970402 Memo from RM Gallo ML20217D9721997-09-30030 September 1997 Notification of 971022 Meeting W/Licensee in Rockville,Md to Discuss Licensee Initiatives That Focus on Planned Licensing Actions for FNP & Corrective Measures Related to Problems Considered by Licensee Mgt to Warrant Special Attention ML20216G2151997-09-0505 September 1997 Notification of 970916 Meeting W/Snoc in Rockville,Md to Discuss Improved Standard Technical Specification Conversion Application & Schedule for Submittal ML20236N3231997-08-21021 August 1997 Forwards SER in Response to Licensee 970522 Requested Interpretation of TS 4.8.1.1.2.e for Two Shared EDGs ML20148J8131997-06-16016 June 1997 Notifies of 970701 Meeting W/Util in Rockville,Md to Discuss Util Initiatives That Focus on Planned Licensing Actions for Plant & Corrective Measures Re Problems Considered by Util Mgt ML20141B0131997-06-16016 June 1997 Notification of 970701 Meeting W/Southern Nuclear Operating Co in Rockville,Md to Discuss SNC Initiatives That Focus on Planned Licensing Action for FNP & Corrective Measures. Meeting Cancelled ML20217B2111997-04-0202 April 1997 Informs That During Insp of Farley Units 1 & 2 in Jan-March 1997,NRR Led Insp Team Identified Tornado Missile Protection Issue W/Exhaust Silencers for DG for Both Units ML20236M9961997-03-27027 March 1997 Forwards Response to Questions Re Ventilation Specs for Farley ML20137C2501997-03-20020 March 1997 Forwards Message to M Ajluni of Southern Nuclear Operating Re Preparing Licensee Personnel for Conference Call ML20236M9661997-02-12012 February 1997 Discusses from Southern Nuclear Operating Co Requesting NRC Review Interpretation of Application of TS 3/4.9.13 at Farley Nuclear Plant,Units 1 & 2 During Modes 5 or 6,or When Defueled ML20134B3421997-01-27027 January 1997 Notification of 970205 Meeting W/Listed Attendees in Rockville,Md to Discuss Util Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair Method in Repair of SG ML20197J0751996-11-26026 November 1996 Requests Technical Assistance in Evaluation of Issues Identified During Routine Insp at Plant.Insp Rept Summary with Justification Encl ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20149E9221994-02-18018 February 1994 Responds to 930215 Request from J Strosnider Re Documentation of Concerns Re Plant Two Volt IPC Proposal & Resolution of Public Comments Concerning Voltage Based Repair Criteria ML20058J7101993-11-18018 November 1993 Notification of Significant Licensee Meeting W/Util on on 931123 to Discuss Plant SALP Board Assessment for Period of 930531-0925 IR 05000364/19930261993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931117 in Atlanta,Ga to Discuss Violation 50-364/93-26-01 Re Personnel Error Resulting in Losses of Configuration Control During Performance of Maint & Testing Activities ML20057C3131993-09-15015 September 1993 Notification of Significant Licensee Meeting W/Util on 931013 to Discuss SALP Performance of Facility During Period 920531-0925 ML20056E4221993-08-0606 August 1993 Requests Written Inputs on Performance of Farley Facilities During Completed SALP Cycle 11 During Period 920531-930925 Using Encl Feeder Forms.Salp Board Meeting for Farley Scheduled for 931013 ML20127J5121993-01-19019 January 1993 Notification of 930202-03 Meetings W/Licensee in Columbia,Al Re Safety Audit of Storage Pond Dam & Dike by NRC & FERC ML20126B1451992-12-11011 December 1992 Notification of 921218 Meeting W/Util in Rockville,Md to Discuss Amend Request for Steam Generator Tube Alternate Plugging Criteria ML20058F4581990-11-0505 November 1990 Submits Daily Highlight.Notifies of 901107 Meeting W/Util to Discuss Technical & Regulatory Concerns Re Steam Generator Tube Collapse Under LOCA & Safe Shutdown Earthquake Loads ML20058E0461990-11-0202 November 1990 Notification of 901120 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Actions ML20058E8271990-11-0202 November 1990 Notification of 901106 Meeting W/Licensee in Rockville,Md to Discuss Facility Steam Generators & Use of EPRI Alternative Tube Plugging Criteria.Agenda Encl ML20058H8871990-11-0202 November 1990 Notification of Cancellation of 901120 Meeting W/Util to Discuss Status of Licensing Actions 1999-06-23
[Table view] |
Text
_ m- _
Hn . April 27i1989 .,
- Docket No. 50-348-364 MEMORANDUM'FOR:" Elinor. G. ~ Adensam, Director -
Project Directorate-II-1 Division of Reactor Projects -1/II FROM: Edward A. Reeves, Senior Project Manager Project Directorate 11-1 Division of Reactor Projects -I/II
SUBJECT:
FORTHCOMINGMEETINGWITHALABAMAPOWERCOMPANY-(APC)
I DATE & TIME: May 10, 1989 12:00 noon LOCATION: One. White Flint North
'11555 Rockville Pike Room 16-B-11 L, Rockville, Maryland
' PURPOSE:- To allow APC Senior Management to' meet with NRC Senior
. Management to Discuss the hydrogen gas intrusion event at-Farley Unit 1 and the related Order. An agenda is attached.'
~* PARTICIPANTS: NRC' . Utility T Taylor R. McDon61d J. ' Partlow, G. Hairston S. Varga J. Woodward E. Merschoff- E. McKay (Consultant)
J. Lieberman -)
W. Hodges
'R. Jonen A. Thadant' J. ' Luchman E.. Reeves D. Verrelli f v e Edward A. Reeves, Senior Project Manager
- L$$ Project Directorate II-1 Divisien of Reactor Projects -I/II l Q84
!:88 cb: See'next.page -
l co o NU
- Meeting between NRC technical staff and applicants or licensees are open for
$$ interested members of the public, petitioners, invervenors, or other parties
, QC to atten4 as observers pursuant to "Open Meeting Statement of NRC Staff Policy,"
Ln 43 FeJfer#1, Register 26058,6/28/78.-
L 0- PDII EReevents P
- E edsap
-[ }hs l ,
\@ N f'}0$ \ ,
amnw _ w -L._---. -___1-. _-- . _ _ . _
q
, , =]
(.c ,
u . , ;. 3 j
1 ,
- h. .'Mr. .
W.'G. Hairston, III ., -
< ;1
. Alabama Power Company Joseph M. Farley Nuclear Plant t
i
- CC* ~
-Mr. R. P; Mcdonald Resident Inspector ^
Executive Vice President U.S. Nuclear Regulatory Commission
-Alabama Power Company P. 0. Box 24 - Route 2 g
P.;0. Box 2641 Columbia, Alabama 36319 Birmingham, Alabama 35291-0400
~
Mr. Bill'M. Guthrie D. Biard MacGuineas, Esquire Executive Vice President: Volpe,1Boskey'and Lyons,
. Alabama Power Company- 918:16th Street, N.W.
.P. 0. Box: 2641 - Washington, D.C. 20006 Birmingham, Alabama- 35291-0400'
~
-Mr. Louis B. Long, General Manager M4., Charles.R.~Lowman
-Southern Company Services, Inc. ' Alabama Electric: Corporation P. 0. Box 2625~ P. O. Box Ef0
> Birmingham, Alabama. 35202 Andalusia, Alabama 35420-
- Chairman, RbgionalAdministrator,RegionII Houston County Comission U.S. Nuclear Regulatory Commission 1
Dothan, Alabama 36301. 101 Marietta' Street, Suite 2900 Atlanta, Georgia 30323 Ernest L. Blake,. Jr. , Esquire .
Shaw, Pittman. Potts and Trowbridge Claude Earl Fox, M.D.-
H 2300 N. Street, N.W. -State Health Officer .
Washington,: DC : 20037 State Department of Publicl Health State Office Puilding Montgomery, Alabama 36130 Robert A. Buettner, Esquire Balch, Bingham, Baker, Hawthorne, Mr. D. N. Morey .
~ Williams and Ward General Manager - Farley Nuclear Plant P.-0. Box 306 P. O. Box 470 Birmingham, Alabama 35201' Ashford, Alabama 36312 s
-g 5' ' '
___-__.-l_.'.
,c .
1 ., . .
- .0- ,
1 1: I L !
PRELIMINARY MEETING AGENDA FARLEY NUCLEAR PLANT CHARGIN PUMPS-MAY 10, 1989 I. Introduction and Review II. System Description III. Pump Operability IV. System Response V. Conclusion s
______m,__mm m_____.-.__.______ ____m. . _ _
r"g";T - ; g. ,
- f. ; .
.5 : .
- i:'/ . , * :
, DISTRIBUTION Socket or Central File.
4
. NRC & !0 cal PDRs PDII-l' : leading' T. Murley/J.-Sniezek
- S. Varga G. Lafnas-0 E. Reeves. ,
P W.'Lanning
. OGC
- E. Jordan B.. Grimes- .
Receptionist '(Building where meeting is being held)~
1J. Taylor
-J. Partlow-
' E..Merschoff RII D. Verrelli: .RII
' J. Liebernian -
- W. Hodges R. Jones A.:Thadanis
! ;J.'Luehman-
'ACRS.(10).
GPA/PA-V. Wilson H. L'. Thomas ~'
L R. Borchardt L K. Clark, Region'II**
' P. Anderson ir ;