ML20237F986
Text
1 j
NATHAN M.
NEWMARK 9
CONSULTING ENGINEERING SERVICES 1114 CIVIL ENGINEERING BUILDING URBANA. ILLINOIS 618o1 22 January 1968 I
i 1
Dr. Peter A. Morris, Director Division of Reactor Licensing U. S. Atomic Energy Commission
]
Washington, D.C.
20545 q
l Re:
Diablo Canyon Report - Docket No. 50-275
]
l Dea r Dr. Morris :
i k
In accordance with the request f rom Roger S. Boyd, dated 16 January 1968, we have reviewed the report to the AEC Regulatory Staff dated December 1967, prepared by Dr. Hall and myself, and compared the i
copy with the draft prepared by us.
One minor point is called to your l
attention. At the bottom of the first paragraph on page 7, the original draf t and notes (f rom the end of the first complete paragraph on page 8 i
of the original draf t) indicates that a sentence should be added as follows:
]
j 1
"On this basis, we concur in the design approach adopted."
However, this added statement may not be important, and I believe that the typed copy of the report reflects our views and is in accord with our draft. Therefore I am signing it on page 11 and returning a copy to you.
I am also returning the amended draf t copy, which is marked for Troy Conne r.
i Thank you for your cooperation.
Sincerely you rs, D '8[d/. w w.s/ (
N. M. Newmark bj w cc:
W. J. Hall Enclosure 9708130263 070729 PDR FOIA
(
ppa CONNORB7-214 241