|
---|
Category:OPERATING LICENSES & AMENDMENTS
MONTHYEARML20211N5471999-09-0808 September 1999 Amend 121 to License NPF-57 Revising TSs by Locating Procedural Details of RETS to Offsite Dose Calculation Manual ML20199C1411997-11-0606 November 1997 Amend 108 to License NPF-57,changes TS 3/4.11.1, Liquid Effluent-Concentration. Change Adds Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Station Service Water Sys ML20058G5071993-11-29029 November 1993 Amend 60 to License NPF-57,revising App B of License to Remove Pages from Section 4.2.1, Aquatic Monitoring in Environmental Protection Plan ML20148P6261988-01-19019 January 1988 Amend 14 to License NPF-57,deleting Tech Spec 3/4.10.7 & Changing Tech Spec 3/4.9.2 Requirements W/Respect to Min Source Range Monitor Neutron Count Rate ML20236U6121987-11-24024 November 1987 Amend 12 to License NPF-57,reducing Emergency Diesel Generator Air Starting Receiver Min Required Pressure ML20206G3951987-04-0707 April 1987 Amend 3 to License NPF-57,modifying Tech Specs to Permit long-term Operation W/One Recirculation Loop Out of Svc 1999-09-08
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217E0371999-09-30030 September 1999 Application for Amend to License NPF-57,supporting Use of ABB-CE Fuel & Reload Analyses Beginning with Upcoming Cycle 10.Proprietary & non-proprietary Info Re Subject Amend,Encl. Proprietary Info Withheld,Per 10CFR2.790(a)(4) ML20211N5471999-09-0808 September 1999 Amend 121 to License NPF-57 Revising TSs by Locating Procedural Details of RETS to Offsite Dose Calculation Manual LR-N990357, Application for Amend to License NPF-57,to Change TS to Raise Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool1999-08-26026 August 1999 Application for Amend to License NPF-57,to Change TS to Raise Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool ML18107A3571999-06-0404 June 1999 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57 Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New,Affiliated Nuclear Generating Company, PSEG Nuclear Llc.Proprietary Encls Withheld ML20195B5461999-05-24024 May 1999 Application for Amend to License NPF-57,correcting Typos & Editorial Errors Contained in Ts.Corrections Are Considered to Be Administrative in Nature LR-N990137, Application for Amend to License NPF-57 to Revise TS to Include Oscillation Power Range Monitor (OPRM) Sys,In Preparation for Plans to Fully Enable OPRM Trip Function During Ninth Refueling Outage,Scheduled for Apr 22,20001999-05-17017 May 1999 Application for Amend to License NPF-57 to Revise TS to Include Oscillation Power Range Monitor (OPRM) Sys,In Preparation for Plans to Fully Enable OPRM Trip Function During Ninth Refueling Outage,Scheduled for Apr 22,2000 ML20205E7931999-03-29029 March 1999 Application for Amend to License NPF-57,incorporating Programmatic Controls in TS for Radioactive Effluents & Environ Monitoring,Conforming to Applicable Regulatory Requirements ML20206G0651999-03-29029 March 1999 Redistributed Application for Amend to License NPF-57, Incorporating Programmatic Controls in TS for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements.Rev 18 to ODCM Also Encl ML20198T0131998-12-30030 December 1998 Application for Amend to License NPF-57,proposing Rev to Flood Protection TS LCO & Associated Action Statements ML20198N3901998-12-28028 December 1998 Application for Amend to License NPF-57,permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys LR-N980532, Application for Amend to License NPF-57,revising TS by Replacing Accelerated Testing Requirements of TS Table 4.8.1.2-1 with EDG Performance Monitoring & Delete TS 4.8.1.1.3 Requirement to Submit 30-day Special Rept1998-12-16016 December 1998 Application for Amend to License NPF-57,revising TS by Replacing Accelerated Testing Requirements of TS Table 4.8.1.2-1 with EDG Performance Monitoring & Delete TS 4.8.1.1.3 Requirement to Submit 30-day Special Rept ML20155D3441998-10-22022 October 1998 Application for Amend to License NPF-57,to Revise TS to Establish More Appropriate Minimum Battery Electrolyte Temperature Limits ML20154R5821998-10-19019 October 1998 Application for Amend to License NPF-57,eliminating Restrictions Imposed by TS 3.0.4 for Filtration, Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities LR-N980363, Application for Amend to License NPF-57,permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries1998-09-0808 September 1998 Application for Amend to License NPF-57,permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries ML20151S4301998-08-25025 August 1998 Application for Amend to License NPF-57,implementing Appropriately Conservative SLMCPR for Upcoming Cycle 9 Plant Core & Fuel Designs.Proprietary & non-proprietary Description of Revs to TS Encl.Proprietary Info Withheld ML20236F1121998-06-25025 June 1998 Application for Amend to License NPF-57,deleting Requirement to Perform in-situ Functional Testing of ADS Valves Once Every 18 Months as Part of Startup Testing Activities ML20249A8101998-06-12012 June 1998 Application for Amend to License NPF-57,providing Increased Operational Flexibility During Periods of Elevated River Water Temp & Maintaining Ultimate Heat Sink Operation within Design.Engineering Analyses Also Encl ML20247K7301998-05-13013 May 1998 Application for Amend to License NPF-57,revising TS Inservice Leak & Hydrostatic Testing Requirements.Review Is Requested by 981220,to Support Next Refueling Outage ML20217P9221998-04-28028 April 1998 Application for Amend to License NPF-57,revising TS 3/4.4.2 by Implementing More Appropriate SRV Setpoints.Proprietary GE TR NEDC-32511P, Safety Review for Hope Creek SRV Tolerance Analysis, Encl.Proprietary Info Withheld LR-N970670, Application for Amend to License NPF-57,requesting Rev to App B of TS 4.2.2, Terrestrial Ecology Monitoring, by Rewording Section to Include Completion of Salt Drift Monitoring Program Which Was Completed in Mar 19891997-12-19019 December 1997 Application for Amend to License NPF-57,requesting Rev to App B of TS 4.2.2, Terrestrial Ecology Monitoring, by Rewording Section to Include Completion of Salt Drift Monitoring Program Which Was Completed in Mar 1989 ML20199C1411997-11-0606 November 1997 Amend 108 to License NPF-57,changes TS 3/4.11.1, Liquid Effluent-Concentration. Change Adds Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Station Service Water Sys LR-N970622, Application for Amend to License NPF-57,revising TS 3/4.11.1, Liquid Effluents - Concentration, by Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated1997-09-29029 September 1997 Application for Amend to License NPF-57,revising TS 3/4.11.1, Liquid Effluents - Concentration, by Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated LR-N970618, Application for Amend to License NPF-57,adding Surveillance Requirement in Section 3/4.5.1 to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie Valves1997-09-24024 September 1997 Application for Amend to License NPF-57,adding Surveillance Requirement in Section 3/4.5.1 to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie Valves ML20217Q6641997-08-26026 August 1997 Application for Amend to License NPF-57,requesting Rev to TS to Clarify Plant Basis for Compliance W/Frvs TS Requirements ML20211M2571997-08-26026 August 1997 Sanitized Supplement to 970331 & 970716 Applications for Amend to License NPF-57,revising Ts.Addl Info & Revised TS Bases Pages Associated W/Amend 101 ML20210P3341997-08-20020 August 1997 Application for Amend to License NPF-57,deleting References to Plants Suppression Pool Water Volume from TS & Supporting Planned Mods to ECCS Suction Strainers in Upcoming Refueling Outage,Per NRC Bulletin 96-003 ML20149G4271997-07-16016 July 1997 Supplements Application for Amend to License NPF-57, Submitted 970331.Supplement Provides Revised SLMCPR Values for Upcoming Operating Cycle (Cycle 8).TSs & Proprietary Info Re SLMCPR Changes,Encl.Proprietary Info,Withheld ML20211M2451997-07-16016 July 1997 Sanitized Version of Supplement to 970331 Application for Amend to License NPF-57,revising TS & Providing Revised SLMCPR Values for Upcoming Operating Cycle (Cycle 8) LR-N970217, Application for Amend to License NPF-7,revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10%1997-06-19019 June 1997 Application for Amend to License NPF-7,revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10% ML20141G8221997-05-19019 May 1997 Application for Amend to License NPF-57,revising Ultimate Heat Sink Temp & River Water Level Limits Which Resolve TS Related Issues Documented in Hope Creek Corrective Action Program ML20140F0261997-04-30030 April 1997 Application for Transfer of Control Re Operating License NPF-57 for Hcngs.Joint Proxy Statement/Prospectus Describing Details of Util Agreement & Plant of Merger W/Delmarva Power & Light Co,Encl LR-N970183, Application for Amend to License NPF-57,requesting Mod to Listed TSs to Adopt Option B of 10CFR50,App J1997-04-0101 April 1997 Application for Amend to License NPF-57,requesting Mod to Listed TSs to Adopt Option B of 10CFR50,App J ML20137M1061997-03-31031 March 1997 Application for Amend to License NPF-57,revising TS to Improve Consistency Between TS & Plant Configuration, Operation & Testing & Complete Required CA to Resolve TS Discrepancies Identified in CA Program ML20137M5811997-03-31031 March 1997 Application for Amend to License NPF-57,representing Changes to TS 2.1.2,action a.1.c for LCO 3.4.1.1 & Bases for TS 2.1. Info Re Safety Limit Min Critical Power Ratio Changes Encl. Info Withheld ML20135E8041997-03-0303 March 1997 Application for Amend to License NPF-57,changing TS 3/4.3.1, Reactor Protection Sys Instrumentation, 3/4.3.2, Isolation Actuation Instrumentation & 3/4.3.3, Emergency Core Cooling Sys Actuation Instrumentation ML20134M0771997-02-11011 February 1997 Application for Amend to License NPF-57,requesting Rev to 3/4.8 Re Electrical Power Systems for Improvements to EDG ML20134B5441997-01-24024 January 1997 Application for Amend to License NPF-57,changing TS 3.1.5, Control Rod Scram Accumulators ML20134F4231996-10-25025 October 1996 Application for Amend to License NPF-57,requesting Rev to 3.1.3.5 Re Control Rod Scram Accumulators ML20117K1231996-08-30030 August 1996 Application for Amend to License NPF-57,changing FSAR Decoupling SSE from LOCA ML18102A2541996-07-12012 July 1996 Suppls to Application for Amend to Licenses DPR-70,DPR-75 & NPF-57 Re Qualifications of Operations Manager ML20100R0841996-03-0606 March 1996 Application for Amend to License NPF-57,revising Diesel Fuel Oil Storage & Transfer Requirements ML18101B2501996-02-26026 February 1996 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57, Revising TS Section 6.0 Re Administrative Controls of Plant ML20097C5671996-02-0505 February 1996 Application for Amend to License NPF-57,revising SR 4.6.2.2.b & 4.6.2.3.b to Include Flow Through RHR Heat Exchanger Bypass Line in SPC & Suppression Pool Spray Flow Path Used During RHR Pump Testing ML18101B1751996-01-11011 January 1996 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57, Revising TS Section 6.0 Re Administrative Controls & Replacing Specific Mgt Titles W/Generic Mgt Functional Positions ML20099L6571995-12-28028 December 1995 Application for Amend to License NPF-57,revising TS Definition 1.4 Re Channel Calibr to Ensure Required Testing Methodology Aligns W/Std Industry Methodology for Instrument Channels Having T/C or RTD as Sensor ML20098D0011995-10-0707 October 1995 Application for Amend to License NPF-57,revising SR 4.8.1.1.2 Re Testing of EDGs to Be Consistent W/Applicable Licensing Documents Used for Development of EDG Surveillance ML20086T6991995-07-27027 July 1995 Application for Amend to License NPF-57,revising Ts,By Incorporating Updated Pressure Vs Temperature Operating Limit Curves Contained in TS Figure 3.4.6.1-1 ML20083B9591995-05-0404 May 1995 Application for Amend to App a of License NPF-57,increasing Annual Operational Limit for Drywell & Suppression Chamber Purge Sys from 120 H to 500 H ML20082T3351995-04-18018 April 1995 Application for Amend to License NPF-57,revising TS Table 4.3.7.1-1, Radiation Monitoring Instrumentation SRs by Extending Channel Functional Test Interval from Monthly to Quarterly for Each Instrument ML20082C1171995-03-30030 March 1995 Application for Amend to License NPF-57 for Hope Creek Generating Station.Amend Would Eliminate Selected Response Time Testing Requirements from TS & Associated Bases Changes 1999-09-08
[Table view] |
Text
l
., ., T -
QtEn
- UNITED STATES
! o,t NUCLEAR REGULATORY COMMISSION g ,t WASHINGTON, D. C. 20556 i
PUBLIC SERVICE ELECTRIC & GAS COMPANY ATLANTIC CITY ELECTRIC COMPANY
/-
DOCKET NO. 50-354 HOPE CREEK GENERATING STATION l AMENDMENT TO FACILITY OPERATING LICENSE
^
Amendment'No.12 License No. NPF-57
- 1. The Nuclear Regulatory Comission (the Commission or the NRC) has found that:
A. The application for amendment filed by the Public Service Electric &
Gas Company (PSE&G) dated August 12, 1987, complies with 1 the standards and requirements of the Atomic Energy Act of 1954, as )
amended (the Act), and the Comission's rules and regulations set !
forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the !
Comission; C. There is reasonable assurance: (1)thattheactivitiesauthorizedby this amendment can be conducted without endangering the health and safety of tne public, and (ii) that such activities will be conducted .
in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will' not be inimical to the comon defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied. ,
i
- 2. Accordingly, the license is. amended by changes to the Technical Specifica- I tions as indicated in the attachment to this license amendment, and .
paragraph 2.C.(2) of Facility Operating License No. NPF-57 is hereby amended to read as follows:
(2) - Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.12, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PSE&G shall operate ;
the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
I 8712030195 871124 )
DR ADOCK 050g4 .
i l
- 3. This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/s/
Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: November 24, 1987 I
l l
1 L RPI/II PM 2:DRFI/II D:PDI-2:DRPI/II GR renbark:C A WButler !
ff /[/87 0/(/87 ,#/IP/87 g/g3/87k DC:SPLD:EAD JCraig
/ /87 See concurrence page of cover letter for SPLD's concurrence dated 11/10/87
., T'
- 3. This license amendment is effective as -of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION f '
Walter R. ' Butler, Director t.s Project Directorate-I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: November 24, 1987 4
e i
ATTACHMENT TO LICENSE AMENDMENT NO.12 FACILITYOPERATINGLICENSU(0.NPF-57 DOCKET NO. 50-354 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised page is identified by Amendment number and contains vertical lines indicating the area of change. Overleaf page is provided to maintain document completeness.*
Remove Insert 3/4 8-5 3/4 8-5 I 3/4 8-6* 3/4 8-6*
i 1
l l
l
, ~
i 1
)
ELECTRICAL POWER SYSTEMS i
SURVEILLANCE REQUIREMENTS (Continued)
- 6. Verifying the diesel generator _is aligned to provide standby power to the associated emergency busses.
- 7. Verifying the pressure in all diesel generator air start receivers to be greater than or equal to 325 psig. l ;
- 8. Verifying the lube oil pressure, temperature and differential pressure across the lube oil filters to be within manufac-turer's specifications. J j
I
- b. At least once per 31 days by. visually examining a sample of lube oil 1 from the diesel engine to verify absence of water.
- c. At least once per 31 days and after each operation of the diesel where the period of operation was greater than or equal to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> by checking for and removing accumulated water from the fuel oil day tank.
- d. At least once per 92 days by removing accumulated water from the fuel oil storage tanks. l
- e. At least once per 31 days by performing a functional test on the emergency load sequencer to verify operability.
l
- f. At least once per 92 days and from new fuel oil prior to addition to the storage tanks by obtaining a sample in accordance with ASTM-D270-1975 and by verifying that the sample meets the following 3 minimum requirements and is tested within the specified time .!
limits: i
- 1. As soon as sample is taken or from new fuel prior to addition l to the storage tank, as applicable, verify in accordance with l the tests specified in ASTM-0975-77 that the sample has:
a) A water and sediment content of less than or equal to 0.05 volume percent. -
b) A kinematic viscosity @ 40*C of greater than or equal to 1.9 centistokes, but less than or equal to 4.1 centistokes or a Saybolt Second Universal (SSU) viscosity at 100*F of greater than or equal to 32 SSU but less than or equal to 40.1 SSU. e c) A specific gravity as specified by the manufacturer as API gravity @ 60 F of greater than or equal to 28 degrees but less than or equal to 42 degrees.
I 2. Within one week after obtaining the sample,. verify an impurity level of less than 2 mg of insolubles per 100 ml. when tested in accordance with ASTM-D2274-70.
HOPE CREEK 3/4 8-5 Amendment No.12 i
l
ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
- 3. Within 2 weeks after obtaining the sample, verify that the other properties specified in Table 1 of ASTM-0975-77 and s Regulatory Guide 1.137, Position 2.a, are met when tested in accordance with ASTM-0975-77.
- g. At least once per 2 months, isy verifying the buried fuel ' oil transfer piping's cathWic protection system is OPERABLE and at least once per j year by subjecting the cathodic protection system to a performance test. .
- h. At least once per 18 months #, during shutdown, by:
- 1. Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service.
- 2. Verifying the diesel generator capability to reject a load of greater than or equal to that of the RHR pump motor (1003 kW) for each diesel generator while maintaining voltage at 4160 1 420 volts and frequency at 60
- 3. Verifying the diesel generator capability to reject a load of 4430 kW without tripping. The generator voltage shall not I -
exceed 4580 volts during and following the load rejection.
- 4. Simulating a loss of offsite power by itself, and:
a) Verifying loss of power is detected and~deenergization of the emergency busses and load shedding from the emergency busses, b) Verifying the diesel generator starts
- on the auto-start signal, energizes the emergency busses with permanently connected loads within 10 seconds after receipt of the start signal, energizes the autoconnected shutdown loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the shutdown loads. After energization, the steady state voltage and frequency of the emergency busses shall be maintained at 4160 1 420 volts and 60
- 1.2 Hz during this test.- .l
- This diesel generator start (10 sec) and subsequent loading (130 sec) from ambient conditions may be preceded by an engine prelube period and/or other warmup procedures recommended by the manufacturer so that mechanical' stress and wear on the diesel engine is minimized.
- For any start of a diesel generator, the diesel must be loaded in accordance with the manufacturer's recommendations.
i HOPE CREEf. 3/4 8-6 ,
. .-