3F0798-02, Provides Notification That Two Related NRC Commitments Are Being Combined & Revised & That Due Date for New Commitment Is Being Extended,In Response to Violations Noted in Insp Rept 50-302/97-12

From kanterella
(Redirected from ML20236G817)
Jump to navigation Jump to search
Provides Notification That Two Related NRC Commitments Are Being Combined & Revised & That Due Date for New Commitment Is Being Extended,In Response to Violations Noted in Insp Rept 50-302/97-12
ML20236G817
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/01/1998
From: Holden J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0798-02, 3F798-2, 50-302-97-12, NUDOCS 9807060399
Download: ML20236G817 (3)


Text

_ _ _ _ _

s Flrrida Power CORPORATION Do 60- 2

. Operaufsg Lk: ente No. DPR-72 l

July 1,1998 3F0798-02 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington. D.C. 20555-0001 1

Subject:

R0 vision and Due Date Extension of NRC Commitments

Reference:

FPC to NRC letter,3F0398-18, Reply to Notice of Violatione, NRC Inspection Report No. 50-302/97-12, dated March 24,1998 j

l l

Dear Sir:

l The purpose of this letter is to provide notification that two related NRC commitments are being combined and revised, and that the due date for the new NRC commitment is being extended. in the referenced letter, Florida Power Corporation (FPC) made the following commitments:

Violation 50-302/97-12-02. Issue #1 Dose calculations for Hydrogen Purging Operations will be finalized and incorporated into Revision 25 to the FSAR [ Final Safety Analysis Report) which is scheduled to be l submitted by August 2,1998.

Violation 50-302/97-12-05, Issue #1 FSAR Chapter 14B will be revised to incorporate the results of this evaluation

[ hydrogen generation and hydrogen purge dose calculations) and will be included in Revision 25 to the Updated FSAR, which is scheduled to be submitted by August 2, l 1998..

The hydrogen purge dose calculations have been finalized. Changes made to previous l, hydrogen generation and hydrogen purge dose calculation methodologies and assumptions result in an increase in post-accident dose to members of the general public. Although the f 1

increased dose is still well within the limits of 10 CFR 100, necessary changes to Chapter l 14 of the FSAR have been determined to involve an unreviewed safety question as defined by 10 CFR 50.59. Necessary changes to Chapter 14 of the FSAR must receive prior NRC review and approval before being incorporated. This process cannot be accomplished in ,pC time for incorporation into Revision 25 of the FSAR, which is scheduled for August 2, ),

1998. Therefore, the above two commitments are being combined and revised, and the due date is being extended as follows: ,

4 CRYsTAlcRjVER ENERGY COMPLEX: 15760 W. Power Line Street Crystal River, Florida 344284 708 * (352)795 4 486 s;GO7060399 980701 ' " "*d"* *'**'*** * '"Pany PDR ADOCK 05000302 P PDR

y L.U. S. Nucl Er Ragulatory Commission

.- 3F0798-02 Page 2 of 3 FPC will submit a License Amendment Request by December 11,1998, for changes to Chapter 14 of the.FSAR made necessary by recently revised hydrogen generation

' and hydrogen purge dose calculations.

If' you have any questions regarding this submittal, please contact Mr. Walter Pike, Manager, Nuclear Regulatory Compliance, at (352) 563-4988.

[_ .

'^

__ Sincerely, i

J. J. Holden '

Director

' Site Nuclear Operations L'

JJH/dwh :

Attachment xc:(Regional Admiraistrator, Region 11 Senior Resident inspector r^

! . NRR Project Manager E

i ..

v L'

l' I

a l

.U.S. Nuclarr R:gulatory Commission 3F0798-02 Page 3 of 3 -

ATTACHMENT a

The following table contains a listing of commitments contained in FPC's response:

(REiSPONSEi >

(COMMITMENT 4 :s DUE DATE 0 ,

3 SECTION ? >

Cover letter FPC will submit a License Amendment Request by December 11,1998 December 11,1998, for changes to Chapter 14 of the FSAR made necessary by recently revised hydrogen generation and hydrogen purge dose calculations.

l l

_ _ _ _ _ _ _ _ ____ __ _ __J