MONTHYEARML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20212J3501999-06-23023 June 1999 Forwards Draft Ltr for Use in Transmitting FERC Rept Re 981008 Audit to Licensee & Copy of FERC Insp Rept ,containing Color Photographs.Without Encls ML20196H9721999-06-23023 June 1999 Requests Attached Request for Addl Info Be Put Into NRC Public Document Room.Encl RAI e-mailed to W Sparkman of Southern Nuclear Operating Co on 990610 IA-96-023, Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier1999-06-18018 June 1999 Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier ML20205N7511999-04-13013 April 1999 Requests That Attached RAI Re TS 3/4.4.7.2e Be Placed in NRC Pdr.Informs That RAI Was Faxed to W Sparkman on 990413 & Will Be Used to Facilitate Discussions During Upcoming Telcon Between NRC & Snoc Staff ML20205M8681999-04-13013 April 1999 Requests That Encl Topics for Discussion Be Made Available in NRC Pdr.Items Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & SNC Staff ML20205J1401999-04-0505 April 1999 Notification of 990419 Meeting with Util to Discuss Licensee Justification of Certain TS Changes Need to Implement Improved Standard Ts.Meeting Was Held in Rockville,Md ML20205G5781999-04-0101 April 1999 Notification of 990416 Meeting with Snoc in Rockville,Md to Discuss Farley Npp,Unit 1 SG Operational Assessment ML20205C8771999-03-31031 March 1999 Requests That Encl questions,e-mailed to W Sparkman of Southern Nuclear Operating Co,Inc,Which Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Util Be Made Available in NRC PDR ML20207J4931999-03-0101 March 1999 Forwards NRC Operator Licensing Exam Repts 50-348/98-300 & 50-364/98-300 (Including Completed & Graded Tests) for Tests Administered on 980313 ML20207J4681999-03-0101 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980313 at Farley NPP ML20202E1621999-01-29029 January 1999 Requests That Encl RAI Be Made Available in NRC Pdr.Subj Document Neither Constitutes Formal Request for Info Nor Represent Formal NRC Position.Encl RAI Faxed on 990129 to W Sparkman of Snoc ML20198H5741998-12-22022 December 1998 Notification of 990107 Meeting with Util in Rockville,Md to Discuss Licensee Justification of Certain TS Changes Needed to Implement Improved Standard TSs ML20197J0501998-12-14014 December 1998 Requests That Encl Memo & Attachments Associated with Task Interface Agreement (TIA 96-023) Fraley License Basis & Acceptability of Kaowool as Electrical Raceway Fire Barrier Be Placed in NRC PDR ML20196H1181998-12-0404 December 1998 Forwards Message Faxed to M Ajluni of Southern Nuclear Operating Co (SNC) on 981204,to Prepare SNC for Conference Call.Message Does Not Constitute Formal Request for Info or Represent Formal NRC Staff Position ML20196E2911998-12-0101 December 1998 Notification of 981215 Meeting with Util in Rockville,Md to Discuss Matters Re Kaowool Fire Barriers Installed at Plant ML20195B7721998-11-12012 November 1998 Forwards Message That Had Been Faxed to M Ajluni on 981112. Purpose of Message Was to Prepare Licensee Personnel for Conference Call Re SG Tube Insp Results for Farley NPP Unit 1 ML20196F7001998-11-0202 November 1998 Notification of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Maryland to Discuss Matters Re Current SG Tube Insps at Farley NPP Unit 1 ML20154L1171998-10-15015 October 1998 Notification of 981026 Meeting with Util in Rockville,Md to Discuss Westinghouse BE-LOCA Abbreviated Reanalysis for Plant,Units 1 & 2 New SG ML20154B0681998-09-29029 September 1998 Notification of 981008 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Repair of SG Tubes ML20154B0411998-09-29029 September 1998 Notification of 981014 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Justification of Certain TS Changes Needed to Implement Improved Std TSs ML20217B1371998-04-21021 April 1998 Forwards Three Documents Associated W/Farley Nuclear Plant, Units 1 & 2-licensing/design Basis for Tornado Missile Protection to Be Made Available in PDR ML20217H4431998-04-0101 April 1998 Forwards Message Faxed on 980401 to M Ajluni of Southern Nuclear Operating Co,Inc (Snc).Purpose of Message Was to Prepare SNC Personnel for Conference Call & Does Not Consitute Formal Request for Info ML20217B1811997-12-18018 December 1997 Discusses Design Insp of Farley Units 1 & 2,for Jan-March of 1997,identified Tornado Missile Protection Issue Re Exhaust Piping & Silencers for EDG for Both Units (Including Station Blackout DG) ML20198S9281997-10-31031 October 1997 Notification of 971120 Meeting W/Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Plans & Schedule for SG Replacement ML20217B1961997-10-15015 October 1997 Discusses Review of Farley Nuclear Plant,Units 1 & 2 Licensing & Design Basis for Protection Against Tornado Missiles at Farley in Accordance w/970402 Memo from RM Gallo ML20217D9721997-09-30030 September 1997 Notification of 971022 Meeting W/Licensee in Rockville,Md to Discuss Licensee Initiatives That Focus on Planned Licensing Actions for FNP & Corrective Measures Related to Problems Considered by Licensee Mgt to Warrant Special Attention ML20216G2151997-09-0505 September 1997 Notification of 970916 Meeting W/Snoc in Rockville,Md to Discuss Improved Standard Technical Specification Conversion Application & Schedule for Submittal ML20236N3231997-08-21021 August 1997 Forwards SER in Response to Licensee 970522 Requested Interpretation of TS 4.8.1.1.2.e for Two Shared EDGs ML20148J8131997-06-16016 June 1997 Notifies of 970701 Meeting W/Util in Rockville,Md to Discuss Util Initiatives That Focus on Planned Licensing Actions for Plant & Corrective Measures Re Problems Considered by Util Mgt ML20141B0131997-06-16016 June 1997 Notification of 970701 Meeting W/Southern Nuclear Operating Co in Rockville,Md to Discuss SNC Initiatives That Focus on Planned Licensing Action for FNP & Corrective Measures. Meeting Cancelled ML20217B2111997-04-0202 April 1997 Informs That During Insp of Farley Units 1 & 2 in Jan-March 1997,NRR Led Insp Team Identified Tornado Missile Protection Issue W/Exhaust Silencers for DG for Both Units ML20236M9961997-03-27027 March 1997 Forwards Response to Questions Re Ventilation Specs for Farley ML20137C2501997-03-20020 March 1997 Forwards Message to M Ajluni of Southern Nuclear Operating Re Preparing Licensee Personnel for Conference Call ML20236M9661997-02-12012 February 1997 Discusses from Southern Nuclear Operating Co Requesting NRC Review Interpretation of Application of TS 3/4.9.13 at Farley Nuclear Plant,Units 1 & 2 During Modes 5 or 6,or When Defueled ML20134B3421997-01-27027 January 1997 Notification of 970205 Meeting W/Listed Attendees in Rockville,Md to Discuss Util Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair Method in Repair of SG ML20197J0751996-11-26026 November 1996 Requests Technical Assistance in Evaluation of Issues Identified During Routine Insp at Plant.Insp Rept Summary with Justification Encl ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20149E9221994-02-18018 February 1994 Responds to 930215 Request from J Strosnider Re Documentation of Concerns Re Plant Two Volt IPC Proposal & Resolution of Public Comments Concerning Voltage Based Repair Criteria ML20058J7101993-11-18018 November 1993 Notification of Significant Licensee Meeting W/Util on on 931123 to Discuss Plant SALP Board Assessment for Period of 930531-0925 IR 05000364/19930261993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931117 in Atlanta,Ga to Discuss Violation 50-364/93-26-01 Re Personnel Error Resulting in Losses of Configuration Control During Performance of Maint & Testing Activities ML20057C3131993-09-15015 September 1993 Notification of Significant Licensee Meeting W/Util on 931013 to Discuss SALP Performance of Facility During Period 920531-0925 ML20056E4221993-08-0606 August 1993 Requests Written Inputs on Performance of Farley Facilities During Completed SALP Cycle 11 During Period 920531-930925 Using Encl Feeder Forms.Salp Board Meeting for Farley Scheduled for 931013 ML20127J5121993-01-19019 January 1993 Notification of 930202-03 Meetings W/Licensee in Columbia,Al Re Safety Audit of Storage Pond Dam & Dike by NRC & FERC ML20126B1451992-12-11011 December 1992 Notification of 921218 Meeting W/Util in Rockville,Md to Discuss Amend Request for Steam Generator Tube Alternate Plugging Criteria ML20058F4581990-11-0505 November 1990 Submits Daily Highlight.Notifies of 901107 Meeting W/Util to Discuss Technical & Regulatory Concerns Re Steam Generator Tube Collapse Under LOCA & Safe Shutdown Earthquake Loads ML20058E8271990-11-0202 November 1990 Notification of 901106 Meeting W/Licensee in Rockville,Md to Discuss Facility Steam Generators & Use of EPRI Alternative Tube Plugging Criteria.Agenda Encl ML20058E0461990-11-0202 November 1990 Notification of 901120 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Actions ML20058H8871990-11-0202 November 1990 Notification of Cancellation of 901120 Meeting W/Util to Discuss Status of Licensing Actions 1999-06-23
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20212J3501999-06-23023 June 1999 Forwards Draft Ltr for Use in Transmitting FERC Rept Re 981008 Audit to Licensee & Copy of FERC Insp Rept ,containing Color Photographs.Without Encls ML20196H9721999-06-23023 June 1999 Requests Attached Request for Addl Info Be Put Into NRC Public Document Room.Encl RAI e-mailed to W Sparkman of Southern Nuclear Operating Co on 990610 IA-96-023, Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier1999-06-18018 June 1999 Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier ML20205N7511999-04-13013 April 1999 Requests That Attached RAI Re TS 3/4.4.7.2e Be Placed in NRC Pdr.Informs That RAI Was Faxed to W Sparkman on 990413 & Will Be Used to Facilitate Discussions During Upcoming Telcon Between NRC & Snoc Staff ML20205M8681999-04-13013 April 1999 Requests That Encl Topics for Discussion Be Made Available in NRC Pdr.Items Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & SNC Staff ML20205J1401999-04-0505 April 1999 Notification of 990419 Meeting with Util to Discuss Licensee Justification of Certain TS Changes Need to Implement Improved Standard Ts.Meeting Was Held in Rockville,Md ML20205G5781999-04-0101 April 1999 Notification of 990416 Meeting with Snoc in Rockville,Md to Discuss Farley Npp,Unit 1 SG Operational Assessment ML20205C8771999-03-31031 March 1999 Requests That Encl questions,e-mailed to W Sparkman of Southern Nuclear Operating Co,Inc,Which Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Util Be Made Available in NRC PDR ML20207J4931999-03-0101 March 1999 Forwards NRC Operator Licensing Exam Repts 50-348/98-300 & 50-364/98-300 (Including Completed & Graded Tests) for Tests Administered on 980313 ML20207J4681999-03-0101 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980313 at Farley NPP ML20202E1621999-01-29029 January 1999 Requests That Encl RAI Be Made Available in NRC Pdr.Subj Document Neither Constitutes Formal Request for Info Nor Represent Formal NRC Position.Encl RAI Faxed on 990129 to W Sparkman of Snoc ML20198H5741998-12-22022 December 1998 Notification of 990107 Meeting with Util in Rockville,Md to Discuss Licensee Justification of Certain TS Changes Needed to Implement Improved Standard TSs ML20197J0501998-12-14014 December 1998 Requests That Encl Memo & Attachments Associated with Task Interface Agreement (TIA 96-023) Fraley License Basis & Acceptability of Kaowool as Electrical Raceway Fire Barrier Be Placed in NRC PDR ML20196H1181998-12-0404 December 1998 Forwards Message Faxed to M Ajluni of Southern Nuclear Operating Co (SNC) on 981204,to Prepare SNC for Conference Call.Message Does Not Constitute Formal Request for Info or Represent Formal NRC Staff Position ML20196E2911998-12-0101 December 1998 Notification of 981215 Meeting with Util in Rockville,Md to Discuss Matters Re Kaowool Fire Barriers Installed at Plant ML20195B7721998-11-12012 November 1998 Forwards Message That Had Been Faxed to M Ajluni on 981112. Purpose of Message Was to Prepare Licensee Personnel for Conference Call Re SG Tube Insp Results for Farley NPP Unit 1 ML20196F7001998-11-0202 November 1998 Notification of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Maryland to Discuss Matters Re Current SG Tube Insps at Farley NPP Unit 1 ML20154L1171998-10-15015 October 1998 Notification of 981026 Meeting with Util in Rockville,Md to Discuss Westinghouse BE-LOCA Abbreviated Reanalysis for Plant,Units 1 & 2 New SG ML20154B0681998-09-29029 September 1998 Notification of 981008 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Repair of SG Tubes ML20154B0411998-09-29029 September 1998 Notification of 981014 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Justification of Certain TS Changes Needed to Implement Improved Std TSs ML20217B1371998-04-21021 April 1998 Forwards Three Documents Associated W/Farley Nuclear Plant, Units 1 & 2-licensing/design Basis for Tornado Missile Protection to Be Made Available in PDR ML20217H4431998-04-0101 April 1998 Forwards Message Faxed on 980401 to M Ajluni of Southern Nuclear Operating Co,Inc (Snc).Purpose of Message Was to Prepare SNC Personnel for Conference Call & Does Not Consitute Formal Request for Info ML20217B1811997-12-18018 December 1997 Discusses Design Insp of Farley Units 1 & 2,for Jan-March of 1997,identified Tornado Missile Protection Issue Re Exhaust Piping & Silencers for EDG for Both Units (Including Station Blackout DG) ML20198S9281997-10-31031 October 1997 Notification of 971120 Meeting W/Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Plans & Schedule for SG Replacement ML20217B1961997-10-15015 October 1997 Discusses Review of Farley Nuclear Plant,Units 1 & 2 Licensing & Design Basis for Protection Against Tornado Missiles at Farley in Accordance w/970402 Memo from RM Gallo ML20217D9721997-09-30030 September 1997 Notification of 971022 Meeting W/Licensee in Rockville,Md to Discuss Licensee Initiatives That Focus on Planned Licensing Actions for FNP & Corrective Measures Related to Problems Considered by Licensee Mgt to Warrant Special Attention ML20216G2151997-09-0505 September 1997 Notification of 970916 Meeting W/Snoc in Rockville,Md to Discuss Improved Standard Technical Specification Conversion Application & Schedule for Submittal ML20236N3231997-08-21021 August 1997 Forwards SER in Response to Licensee 970522 Requested Interpretation of TS 4.8.1.1.2.e for Two Shared EDGs ML20148J8131997-06-16016 June 1997 Notifies of 970701 Meeting W/Util in Rockville,Md to Discuss Util Initiatives That Focus on Planned Licensing Actions for Plant & Corrective Measures Re Problems Considered by Util Mgt ML20141B0131997-06-16016 June 1997 Notification of 970701 Meeting W/Southern Nuclear Operating Co in Rockville,Md to Discuss SNC Initiatives That Focus on Planned Licensing Action for FNP & Corrective Measures. Meeting Cancelled ML20217B2111997-04-0202 April 1997 Informs That During Insp of Farley Units 1 & 2 in Jan-March 1997,NRR Led Insp Team Identified Tornado Missile Protection Issue W/Exhaust Silencers for DG for Both Units ML20236M9961997-03-27027 March 1997 Forwards Response to Questions Re Ventilation Specs for Farley ML20137C2501997-03-20020 March 1997 Forwards Message to M Ajluni of Southern Nuclear Operating Re Preparing Licensee Personnel for Conference Call ML20236M9661997-02-12012 February 1997 Discusses from Southern Nuclear Operating Co Requesting NRC Review Interpretation of Application of TS 3/4.9.13 at Farley Nuclear Plant,Units 1 & 2 During Modes 5 or 6,or When Defueled ML20134B3421997-01-27027 January 1997 Notification of 970205 Meeting W/Listed Attendees in Rockville,Md to Discuss Util Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair Method in Repair of SG ML20197J0751996-11-26026 November 1996 Requests Technical Assistance in Evaluation of Issues Identified During Routine Insp at Plant.Insp Rept Summary with Justification Encl ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20149E9221994-02-18018 February 1994 Responds to 930215 Request from J Strosnider Re Documentation of Concerns Re Plant Two Volt IPC Proposal & Resolution of Public Comments Concerning Voltage Based Repair Criteria ML20058J7101993-11-18018 November 1993 Notification of Significant Licensee Meeting W/Util on on 931123 to Discuss Plant SALP Board Assessment for Period of 930531-0925 IR 05000364/19930261993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931117 in Atlanta,Ga to Discuss Violation 50-364/93-26-01 Re Personnel Error Resulting in Losses of Configuration Control During Performance of Maint & Testing Activities ML20057C3131993-09-15015 September 1993 Notification of Significant Licensee Meeting W/Util on 931013 to Discuss SALP Performance of Facility During Period 920531-0925 ML20056E4221993-08-0606 August 1993 Requests Written Inputs on Performance of Farley Facilities During Completed SALP Cycle 11 During Period 920531-930925 Using Encl Feeder Forms.Salp Board Meeting for Farley Scheduled for 931013 ML20127J5121993-01-19019 January 1993 Notification of 930202-03 Meetings W/Licensee in Columbia,Al Re Safety Audit of Storage Pond Dam & Dike by NRC & FERC ML20126B1451992-12-11011 December 1992 Notification of 921218 Meeting W/Util in Rockville,Md to Discuss Amend Request for Steam Generator Tube Alternate Plugging Criteria ML20058F4581990-11-0505 November 1990 Submits Daily Highlight.Notifies of 901107 Meeting W/Util to Discuss Technical & Regulatory Concerns Re Steam Generator Tube Collapse Under LOCA & Safe Shutdown Earthquake Loads ML20058E8271990-11-0202 November 1990 Notification of 901106 Meeting W/Licensee in Rockville,Md to Discuss Facility Steam Generators & Use of EPRI Alternative Tube Plugging Criteria.Agenda Encl ML20058E0461990-11-0202 November 1990 Notification of 901120 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Actions ML20058H8871990-11-0202 November 1990 Notification of Cancellation of 901120 Meeting W/Util to Discuss Status of Licensing Actions 1999-06-23
[Table view] |
Text
- - - - - - _ _ _ _ __ _
Docket No. 50-348
.MEMOR$NDUMFOR: Elinor G.'Adensam, Director 4 Project Directorate 11-1 :
Division of Reactor Projects - I/II FROM: Edward A. Reeves, Sr. Project Manager Project Directorate 11-1 Division of Reactor Projects - I/II
SUBJECT:
FORTHCOMING MEETING WITH ALABAMA POWER COMPANY.REGARDING 1 THE RECENT SAFETY' INJECTION SYSTEM PIPE CRACK AT JOSEPH !
M. FARLEY NUCLEAR PLANT, UNIT 2 1
DATE & TIME: Thursday, January 15, 1988 11:00 a.m.
l LOCATION: Room P-118, Phillips Building l 7920 Norfolk Avenue l Bethesda, Maryland PURPOSE: Alabama Power Company (APCo) will review the recent 6-irch. ,
safety injection crack and analysis as it may relate to l generic implications to PWR's. Typical questions to be j discussed are attached, j PARTICIPANTS: NkC APCo: SCS E Varga U Mcdonald R. Davis et, al-G. Lainas D. Mansfield C. Cheng W. Shipman BECHTEL J. Richardson J. Garlington K. Gandahi-E. Rossi and others E. Reeves WESTINGHOUSE A. Herdt ]
E. Merchoff D. Adamonis et al.
H. Dance i
Edward A. Reeves, Sr. Project Manager Project Directorate 11-1 Division of Reactor Projects - 1/II 7
Distribution: (MEETINGNOTICEMEMO) l
" Docket Files NRC & Local PDR OGC-B ;
PD 21 Reading EJordan l TMurley/JSniezek JPartlow 1 FMiraglia Receptionist Phillips SVarga NRC Participants Glainas ACRS(10)
EReeves GPA/PA .j' WLanning VWilson DMorley .
PM:. PR D f3DhPR k ER e's/cp EAde sam l 1/ /88 1/ 88 8801070417 080104 PDR ADOCK 0500034B '
P PDR
/ o
~,,
UNITED STATES
!" o NUCLEAR RF.GULATORY COMMISSION aE WASHINGTO N, D. C, 20555 5, 't N...../ J REQUEST FOR INFORMATION We have concerns regarding the long. term integrity of the safety injection and and associated piping in the Farley plants, and we need to evaluate the generic implications, including possible relationships to ongoing leak-before break analyses. For these reasons, we must determine the root cause of the crack in the Farley safety injection piping in a timely manner.
We have developed a set of questions that we feel must be addressed for us to make a technically sound evaluation of this problem. We would like these to be covered to the extent possible in a meeting to be held in the very near future. Because we have.only limited information at this time, you should try to address any other relevant aspects that you are aware of, even if not covered explicitly in our list of questions.
- 1. What was the source of the cyclic stress that caused the fatigue failure.
- 2. We understand that the maximum amount of vibration picked up by the accelerometers was .1 G. What vibratory stress does this imply at the crack location? What was the frequency? Provide rationale for the elimination of strain gaging from the instrumentation program.
- 3. If it is assumed that the failure was caused by cyclic thermal stresses, what was the cause of the thermal fluctuations? If cold water was flowing thru the pipe, where did it come from. Why? Is this a nonnal condition or does it only occur infrequently? If cold water flow is the cause, was the cycling caused by thermal eddies or opening and closing of the check valve? Why are temp. measurements at upstream and downstream of check valve on loops B & C different?
- 4. If the failure is attributed to thermal cycling from cold water inadvertently leaking.into the SI pipe, how much cold water flow is necessary to cause the problem? How could this be monitored to detect such flow? Provide isometric of piping of interest in current state for both units 1 and 2.
- 5. We heard some reference to concern about the adjacent check valve. What experience caused this concern? Could this relate to chatter or cyclic operation of the valve?
- 6. Provide status of thermal sleeves in both units. What was the root cause of the failure of the thermal sleeves? Could this be related to the crack in the pipe? If so, why are we sure that the safety injection piping in Loop B of Unit 1 is not subject to cracking?
l l
1
- 7. Provide brief rationale on (1) why the original design provided thermal sleeves (2) why the plant can operate without thermal sleeves and (3) why you still believe (2) is appropriate.
- 8. If cold water flow is assumed to be the cause, we have concerns regarding the possibility of thermal cracking of the nozzle and/or the main coolant.
pipe itself, particularly now that the thermal sleeve is. absent. This-subject should be addressed, as it relates to any leak-before-break analysis.
We believe that we may need to understand the problem in considerable detail, but recognize that it may take additional time to accomplish this. The following questions represent our current thinking on the types of analyses that may be required.
- 1. Assuming leakage thru the check valve and stratification of the fluid between the valve and the elbow, develop the thermal and flow time-history _ of the fluid and the inner pipe wall in the region between the J check valve and the cold leg nozzle. The effects of the flow in the cold leg past the nozzle should also be considered.
- 2. Assuming that the thennal- sleeve protruded into the cold leg flow, evaluate the vibratory loading experienced by the region between the check valve and the cold leg nozzle.
- 3. Perform a fatigue evaluation of the region, including the thermal ,
sleeve in both as-built and protruding into cold leg when subjected to both the vibratory and transient thermal load histories, and determine the cumulative usage factor. Include effects of residual stresses.
I l.
I