Responds to NRC Re Violations Noted in Insp of Facility on 750218-21.Corrective Actions:Procedure Instituted to Attach Status of 10CFR50.59 Changes to Current Yearly File for Ready Ref
ML20215E274
Person / Time
Site: Berkeley Research Reactor
Issue date: 03/25/1975
From: Prussin S
CALIFORNIA, UNIV. OF, BERKELEY, CA
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20215E220 List:
References
FOIA-86-811 NUDOCS 8612190111
Download: ML20215E274 (2)


Text

__

to W'

(~

.(

oUN1VERSITY OF CALIFORNIA, BERKELEY BERKELEY

  • DAVIS
  • IRVINE
  • 148 ANCELES
  • RIVERSIDE
  • SAN DIECO
  • SAN FRANCISCO SANTA BARBARA
  • SANTA CRUZ '

COLLEGE OF ENCINEERING BEREF FY, CALIFORNIA 94720 DEPARTMENT OF NUCLEAR ENGINEERING March 25,-1975 R.

H.'Engelken, Director United States Nuclear Regulatory Commission Region V Suite 201, Walnut Creek' Plaza 1990 N. California Boulevard Walnut Creek, California 94596 Re:

Docket No. 050-0224; Inspection of Berkeley Research Reactor Facility, February-18-21, 1975 -

Notice of Violation

Dear Mr. Engelken:

In reference to your notification of March 10, 1975 speci-fying two activities not conducted in full compliance.with NRC requirements, we report the following actions which we'believe will correct these deficiencies.

(In the following we refer to items A.

and B.

as given in Appendix A:

Notice of Violation, March 10, 1975.)

Item A).

1).

A report of the two changes requiring a 10 CFR 50.59 review will have been' forwarded to NRC, Washington as of Friday, March 28, 1975.

2).

The factors which lead to failure to submit an anrual report covering these changes have been determined to be a change in reactor personnel and inadequacies in filing procedures.

To prevent reoccurrence, a procedure has been instituted wherein the status of such changes shall be attached to the current yearly file for ready reference.

3).

The procedure noted in item 2). has already been instituted and full compliance will have been achieved as of March 28, 1975.

Item B).

1).

The topic of review of experiment records has Leen placed on the agenda of the Reactor h 21 g 1 861216

'> SQ

~.;

/

9g EORCEB6-811 ppg

.... p.,.

~

E if e

'% p,.

pc

y

(

% March 25, 1975 Hazards Committee meeting scheduled for April'1, 1975.

2).

The apparent lack of full compliance with

- I Technical Specification I.2. stems from past interpretation of the requirements set forth in this pa,ragraph.

The mechanics of a procedure to formally meet the requirements of Technical-Specifications I.2 shall be defined jointly f

by the Reactor staff and the Reactor Hazards Committee.

3). _ Full compliance will be achieved as of June 1, 1975.

We believe that these-actions should correct possible inadequacies in our operations and would be happy to provide additional information if required.

Sincerely, d m..A., C. (s-4 Stanley G. Prussin Reactor Administrator SGP: irs cc: