MONTHYEARML19261C3381979-03-20020 March 1979 License Change Application 26,Revision 1,requesting Amend to NPF-1 to Update Inservice Insp & Inservice Testing Programs Project stage: Other ML19261C3351979-03-20020 March 1979 Forwards License Change Application 26,Revision 1,requesting Amend to NPF-1 Project stage: Other ML17299B3221985-11-0606 November 1985 Forwards Preliminary Case Study Rept, Effects of Ambient Temp on Electronic Equipment in Safety-Related.... Rept Initiated by 840604 Event Re Total Loss of Control Area Ventilation Sys at Plant.Comments Requested within 30 Days Project stage: Other ML20138Q9591985-11-0808 November 1985 Withdraws License Change Application 120 to Revise Tech Spec 3.4.10 Re Structural Integrity Project stage: Other ML17299B3241985-11-30030 November 1985 Preliminary Case Study Rept, Effects of Ambient Temp on Electronic Equipment in Safety-Related Instrumentation & Control Sys Project stage: Other ML20136C6401985-12-20020 December 1985 Forwards Draft SER Re Tech Spec Changes & Draft Transmittal Ltr to Licensee.Proposed Amend to License NPF-1 Approved. SALP Input Also Encl Project stage: Draft Approval ML20205J5991986-02-10010 February 1986 Forwards Amend 109 to License NPF-1 & Safety Evaluation. Amend Revises Tech Spec Sections 1.4 & 1.6 Re Definitions of Operational Mode & operable-operability.Withdrawal Request Acceptable.Listed Tech Specs Should Be Reviewed Project stage: Approval ML20137X7791986-02-28028 February 1986 Confirmatory Action Ltr Re 860228 Telcon W/Jw Lynch Outlining Listed Actions to Be Taken to Assure Operability of Reactor Control Room Emergency Ventilation Sys,Per Tech Specs & GDC 19 Project stage: Other ML20141C7141986-03-21021 March 1986 Notice of Deviation from Insp on 860128-30 & 0224-28 Project stage: Other ML20197F2511986-05-0707 May 1986 Forwards Request for Addl Info Re Control Room Habitability. Control Room Ventilation Sys Functioning Inconsistent W/Tmi Action Plan Item III.D.3.4 or Updated FSAR Project stage: RAI ML20198A1601986-05-14014 May 1986 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $80,000.Violation Noted:Control Room Emergency Ventilation Sys Inoperable & Not Independent Due to Excessive Makeup Flow Rate in Train CB-1B Project stage: Other ML20198A1351986-05-14014 May 1986 Discusses Insp on 860128-30 & 0224-28 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty.Violation Involves Licensee Failure to Maintain Control Room Emergency Ventilation Sys in Operable Status Project stage: Other ML20155J9501986-05-19019 May 1986 Forwards Addl Info Re Adequacy of Control Room Emergency Ventilation Sys & Control Room Habitability,Per Tl Chan 860507 Concerns.Complete Reanalysis of NUREG-0737,III.D.3.4 Requirements Will Be Completed Prior to Startup Project stage: Other ML20195F0061986-06-0404 June 1986 Forwards Revised Dose Calculation Analysis & Schedule for Completion of Control Room Emergency Ventilation Sys & Revised CB-1 Action Plan,Per 860528 Request Project stage: Other IR 05000344/19860211986-06-13013 June 1986 Insp Rept 50-344/86-21 on 860522-0606.No Violations or Deviations Noted.Major Areas Inspected:Activities Re Periodic Containment Integrated Leak Rate Test,Including Review of Procedures & Personnel Interviews Project stage: Request ML20205T6301986-06-13013 June 1986 Forwards Revised CB-1 Action Plan,Control Room Pressurization Test Results & Summary of Control Bldg HVAC Operation,Per 860609 Telcon Re Control Room Emergency Ventilation Project stage: Other ML20203D5471986-07-14014 July 1986 Withdraws Request to Revise Tech Spec 3/4.7.6 Re Control Room Emergency Ventilation Sys,Per License Change Application 120.Change Will Be Part of Control Room Habitability Tech Spec Changes to Be Submitted by 860930 Project stage: Other IR 05000344/19860271986-07-14014 July 1986 Enforcement Conference Rept 50-344/86-27 on 860709.Major Areas Discussed:Apparent Violation Noted During Special Insp of QC Activities (Insp Rept 50-344/86-24) Project stage: Request ML20212K5051986-08-14014 August 1986 Forwards Notice of Withdrawal of Portions of 850419 Application for Amend to License NPF-1,per Util 860714 Request Project stage: Withdrawal ML20212K5131986-08-14014 August 1986 Notice of Withdrawal of Portions of 850419 Application for Amend to License NPF-1,revising Tech Specs to Permit Performance of Surveillance Testing of Control Room Emergency Ventilation Sys Project stage: Withdrawal ML20214Q8211986-09-19019 September 1986 Summary of 860528 Meeting W/Util & Bechtel in Bethesda,Md Re Control Room Emergency Ventilation Sys,Per TMI Action Item III.D.3.4 on Control Room Habitability.List of Attendees Encl Project stage: Meeting ML20215C2151986-09-30030 September 1986 Forwards Revised Toxic Gas Analysis Re NUREG-0737,III.D.3.4, Control Room Habitability, Justifying Deletion of Ammonia & Sulfur Dioxide Detectors.Implementation Plan for Design Changes & Related Info Encl Project stage: Other ML20207C6791986-12-24024 December 1986 Requests Expedited Review & Approval of Control Room Emergency Ventilation Sys (CB-1) Testing Changes Requested in Re TMI Action Item III.D.3.4, Control Room Habitability. Control Room Cooling Design Change Described Project stage: Other 1986-03-21
[Table View] |
Text
. _ _ _
August-14, 1986 DISTRIBUTION o
Docket No. 50-344 Doctet g ej C.:Vogan
~
NRC PDR
.T.
Chan Local PDR E. Jordan PD#3 Rdg.
B. Grimes.
T. Novak J.' Partlow Mr. Bart D. Withers C. Rossi ACRS(10)
Vice President OGC-B OPA Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204
Dear Mr. Withers:
SUBJECT:
WITHDRAWAL 0F APPLICATION FOR AMENDMENT By letter dated April 19, 1985, Portland General Electric (PGE) submitted LCA 120, which requested, in part, a change to the surveillance requirement of the control room emergency ventilation system, Technical Specification 4.7.6.1.a.
More specifically, it was proposed that the testing of each train of the control room emergency ventilation system be changed from once every 31 days, to once every 12 months.
By letter dated July 14, 1986, PGE requested that the above described portion of its April 19th application for amendment (LCA 120) be withdrawn. Your letter also stated that this portion of LCA 120 would be revised as part of the control room habitability Technical Specification changes, to be submitted by September 30, 1986.
In light of ongoing efforts by PGE staff to maintain commitments regarding the resolution of Control Room Habitability, the staff agrees that-Technical Specification changes regarding the control room ventilation system would more appropriately reflect the latest system configuration when submitted following the system review process (i.e., September 30, 1986). Your request for withdrawal is hereby granted.
The Commission has filed the enclosed " Notice of Withdrawal of Application for Amendment to Facility Operating License" with the Office of the Federal Register for Publication.
Sincerely, S
T 8605220123 860814 Steven A. Varga, Director PDR ADOCK 05000344 Project Directorate #3 P
PDR Division of PWR-Licensing-A
Enclosure:
As stated cc: See next page
- SEE PREVIOUS CONCURRENCE PD#3 PDf3 OGC-B CVogan*
TChan*
MYoung*
SV 7/31/86 7/31/86 8/04/86 (86
- q 1
DISTRIBUTION
- Docket No. 50-344 U6cket-File C. Vogan NRC PDR -
T. Chan Local PDR E. Jordan PD#3 Rdg.
B. Grimes
/
T. Novak 4 Partlow Mr. Bart D. Withers C. Rossi ACRS(10)
Vice President OGC-B OPA '
Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204
Dear Mr. Withers:
SUBJECT:
WITHDRAWAL OF APPLICATION FOR AMENDMENT By letter dated April 19, 1985, Portland General EJ ctric (PGE) submitted LCA 120, which requested in part, a change to the surveil 4nce requirement of the control room emergency ventilation system, Technical S cification 4.7.6.1.a.
More specifically, it was proposed that.the testi of.each train of the control room emergency ventilation system be change from once every-31 days, to once every 12 months.
By letter dated July 14, 1986, PGE re ested that the above described application for amendment of LCA 120 e withdrawn. Your letter also stated that this portion of LCA 120 would e revised as part of the control room-habitability Technical Specificat a changes, to-be submitted by September 30, 1986.
In light of ongoing efforts PGE staff to maintain commitments regarding the resolution of Control Room abitability, the staff agrees that Technical Specification changes re rding the control room ventilation system would more appropriately reflect latest system configuration when submitted following the system review proc s (i.e., September 30,1986).
Your request for withdrawal is hereby granted.
The Commission has/ filed the enclosed " Notice of Withdrawal of Application for Amendment to FaciMity Operating License" with the Office of the Federal Register for Publication.
/
Sincerely,
/
s Steven A. Varga, Director Project Directorate #3 Division of PWR Licensing-AL
Enclosure:
As stated cc: See next page PD#3h PD#3 OGC-PD#3 CVogan TCha
- Aft /mq SVarga 7/g\\/86 g/3f/86 8/f/86 8/ /86
Mr. Bart D. Withers Portland General Eletric Company Trojan Nuclear Plant cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant Post Office Box 0 Rainier, Oregon 97048 Robert M. Hunt, Chairman Board of County Commissioners Columbia County St. Helens, Oregon 97501 William T. Dixon Oregon Department of Energy Labor and Industries Building Room 111 Salem, Oregon 97310 Regional Administrator, Region V U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 l