OPERATING DATA REPORT DOCKET No. 50-341 COMPLETED BY L.P.Bregni DATE March 13, 1987~
TELEPHONE (313)586-1617 OPERATING STATUS
.1.
UNIT NAME:
Fermi 2 l Notes l
2.
REPORTING PERIOD: October, 1986 l
l l
3 LICENSED THERMAL POWER (MWt): 3292 l
l 4.
NAMEPLATE RATING (GROSS WJe):
1215 l
l 5
DESIGN ELECT RATING (Net MWe): 1093 l
l 6.
MAX DEPENDABLE CAP (GROSS MWe):
l l
7 MAX DEPENDABLE CAP (Net MWE):
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
None 9
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
218.6
- 10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power. (Ref. J. G. Keppler letter of September 12, 1986)
THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 745 971 997
- 12. HRS REACTOR WAS CRITICAL 354.6 401.8 401.8
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 61 3 69.8 69.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGEY GEN (MWH) 121,536 131,472 131,472
- 17. GROSS ELECT ENERGY GEN (MWH) 4880 5620 5620
- 18. NET ELECT ENERGY GEN (MWH)
-8500
-10,543
-10,543
- 19. UNIT SERVICE FACTOR N/A N/A N/A
- 20. UNIT AVAILABILITY FACTOR N/A N/A N/A
N/A N/A N/A
- 22. UNIT CAP FACTOR (USING DER NET)
N/A N/A N/A l
- 23. UNIT FORCED OUTAGE RATE N/A N/A N/A
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MON (TYPE, DATE, DURATION OF EACH) NONE
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 C6/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 05/01/87 l
- To be determined 8703190537 870313 PDR ADOCK 05000341 R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-341 UNIT FERMI 2 DATE March 13, 1987 COMPLETED BY L. P. Bregni TELEPHONE (313) 586-1617 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 17 77 2
0 18 0
3 0
19 0
4 0
20 0
5 0
21 49 6
0 22 39 7
0 23 68 8
0 24 0
9 0
25 0
to 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 55 l
16 55
(
l l
l
UNIT SHUTDOMMS AND POWER REDUCTIONS DOCKET NO.
50-301 DATE-March 13. 1687 UNIT NAME Fermi 2 COMPLETED BY L.
P.
Breon!
TELEPHONE (313)586-1617 REPORT MONTH October METHOD OF LER SYS COMP CAUSE & CORRECTIVE
^
NO.
DATE TYPE DUR REASON SHUTTING DOWN NO.
CODE CODE ACTION TO PREVENT (1)
(HRS)
(2)
THE REACTOR (4)
=(5)
RECURRENCE (3) 86-01 860921 F
381.7 A
4 N/A HC HTEXCHD Shutdown continued from last month to repair condenser tube' leaks to maintain proper reactor coolant chemistry. While attempting to y
start up the main turbine generator on October 5 the Gland Sealing Steam pressure regulatory Malfunc-tioned.
Reported in LER 86-035' dated November 3, 1986.
On October 9 management decided to Shut down the reactor while investigating the loss of 120 VAc instrument power.
Paportad in LER 86-036 dated Novemoec 7, 1986.
86-02 861017 F
106.3 A
3 86-040 CC INSTRUT Reacter prehbure. regulator malfunc-tioned causing low level reactor trip.
Reported in LER 86-040 dated November 17, 1986.
(1) F: FORCED (2) REASON:
(3) METHOD:
(4) EXHIBIT G - INSTRUCTIONS S SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION 0F DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR. LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CON;INUED.
E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
(5) EXHIBIT 1 - SAME SOURCE i
i
UNIT SHUTDOWNS AteD POWEC CLDUCTIONS DOCKET NO.
50-341 DATE March'13. 1987 ~
UNIT NAME Fermi 2 COMPLETED BY L.
P.
Bregni TELEPHONE (313)586-1617 REPORT MGNTH October METHOD OF LER SYS COMP CAUSE & CORRECTIVE NO.
DATE TYPE DUR REASON SHUTTING DOWN NO.
CODE CODE ACTION TO PREVENT (1)
(HRS)
(2)
THE REACTOR (4)
(5)
RECURRENCE (3) 86-03 861023 5
195.8 8
2 N/A ZZ ZZZZZZ Performed shutdown using remote shutdown panel.
While shut down performed repale's to reactor Recirculation Motor Generator Set A.
(1) F: FORCED (2) REASON:
(3) METHOD:
(4) EXHIBIT G - INSTRUCTIONS S: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)
E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN). 's
.(5) EXHIBIT 1~ - SAME SOURCE H - OTHER (EXPLAIN)