Revised Monthly Operating Rept for Oct 1986
ML20207S487
Person / Time
Site: Fermi 
Issue date: 10/31/1986
From: Bregni L
DETROIT EDISON CO.
To:
Shared Package
ML20207S480 List:
References
NUDOCS 8703190537
Download: ML20207S487 (4)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _

OPERATING DATA REPORT DOCKET No. 50-341 COMPLETED BY L.P.Bregni DATE March 13, 1987~

TELEPHONE (313)586-1617 OPERATING STATUS

.1.

UNIT NAME:

Fermi 2 l Notes l

2.

REPORTING PERIOD: October, 1986 l

l l

3 LICENSED THERMAL POWER (MWt): 3292 l

l 4.

NAMEPLATE RATING (GROSS WJe):

1215 l

l 5

DESIGN ELECT RATING (Net MWe): 1093 l

l 6.

MAX DEPENDABLE CAP (GROSS MWe):

l l

7 MAX DEPENDABLE CAP (Net MWE):

l l

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

None 9

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):

218.6

10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power. (Ref. J. G. Keppler letter of September 12, 1986)

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 745 971 997
12. HRS REACTOR WAS CRITICAL 354.6 401.8 401.8
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 61 3 69.8 69.8
15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGEY GEN (MWH) 121,536 131,472 131,472
17. GROSS ELECT ENERGY GEN (MWH) 4880 5620 5620
18. NET ELECT ENERGY GEN (MWH)

-8500

-10,543

-10,543

19. UNIT SERVICE FACTOR N/A N/A N/A
20. UNIT AVAILABILITY FACTOR N/A N/A N/A
21. UNIT CAP FACTOR (USING MDC NET)

N/A N/A N/A

22. UNIT CAP FACTOR (USING DER NET)

N/A N/A N/A l

23. UNIT FORCED OUTAGE RATE N/A N/A N/A
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MON (TYPE, DATE, DURATION OF EACH) NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 C6/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 05/01/87 l

  • To be determined 8703190537 870313 PDR ADOCK 05000341 R

PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT FERMI 2 DATE March 13, 1987 COMPLETED BY L. P. Bregni TELEPHONE (313) 586-1617 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0 17 77 2

0 18 0

3 0

19 0

4 0

20 0

5 0

21 49 6

0 22 39 7

0 23 68 8

0 24 0

9 0

25 0

to 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 55 l

16 55

(

l l

l

UNIT SHUTDOMMS AND POWER REDUCTIONS DOCKET NO.

50-301 DATE-March 13. 1687 UNIT NAME Fermi 2 COMPLETED BY L.

P.

Breon!

TELEPHONE (313)586-1617 REPORT MONTH October METHOD OF LER SYS COMP CAUSE & CORRECTIVE

^

NO.

DATE TYPE DUR REASON SHUTTING DOWN NO.

CODE CODE ACTION TO PREVENT (1)

(HRS)

(2)

THE REACTOR (4)

=(5)

RECURRENCE (3) 86-01 860921 F

381.7 A

4 N/A HC HTEXCHD Shutdown continued from last month to repair condenser tube' leaks to maintain proper reactor coolant chemistry. While attempting to y

start up the main turbine generator on October 5 the Gland Sealing Steam pressure regulatory Malfunc-tioned.

Reported in LER 86-035' dated November 3, 1986.

On October 9 management decided to Shut down the reactor while investigating the loss of 120 VAc instrument power.

Paportad in LER 86-036 dated Novemoec 7, 1986.

86-02 861017 F

106.3 A

3 86-040 CC INSTRUT Reacter prehbure. regulator malfunc-tioned causing low level reactor trip.

Reported in LER 86-040 dated November 17, 1986.

(1) F: FORCED (2) REASON:

(3) METHOD:

(4) EXHIBIT G - INSTRUCTIONS S SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION 0F DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR. LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CON;INUED.

(NUREG-0161)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

(5) EXHIBIT 1 - SAME SOURCE i

i

UNIT SHUTDOWNS AteD POWEC CLDUCTIONS DOCKET NO.

50-341 DATE March'13. 1987 ~

UNIT NAME Fermi 2 COMPLETED BY L.

P.

Bregni TELEPHONE (313)586-1617 REPORT MGNTH October METHOD OF LER SYS COMP CAUSE & CORRECTIVE NO.

DATE TYPE DUR REASON SHUTTING DOWN NO.

CODE CODE ACTION TO PREVENT (1)

(HRS)

(2)

THE REACTOR (4)

(5)

RECURRENCE (3) 86-03 861023 5

195.8 8

2 N/A ZZ ZZZZZZ Performed shutdown using remote shutdown panel.

While shut down performed repale's to reactor Recirculation Motor Generator Set A.

(1) F: FORCED (2) REASON:

(3) METHOD:

(4) EXHIBIT G - INSTRUCTIONS S: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN). 's

.(5) EXHIBIT 1~ - SAME SOURCE H - OTHER (EXPLAIN)