4 OPERATING DATA REPORT
-+'
I DOCKET NO. 50-341 COMPLETED BY L.P.Bregni
~~'
DATE March 13, 1987 TELEPHONE (313)586-1617 OPERATING STATUS 1.
UNIT NAME:'
Fermi 2 INotes l
2.
REPORTING PERIOD: November l
l 3
LICENSED THERMAL POWER (MWt):' 3292 l
l 4.
NAMEPLATE RATING (GROSS MWe):
1215 l
l 5.
DESIGN ELECT RATING (Net MWe): 1093 I
I 6.
MAX DEPENDABLE CAP (GROSS MWe):
l l
7 MAX DEPENDABLE CAP (Net MWE):
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
None 9
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
218.6
- 10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated
!~
thermal power.
(Ref. J. G. Keppler letter of September 12, 1986)
THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 720 1690.9 1690.9
- 12. HRS REACTOR WAS CRITICAL 159 1 560.9 560.9
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 26.0 95.8 95.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
l.
- 16. GROSS THERMAL ENERGY GEN (MWH) 36,096 167,568 167,568
- 17. GROSS ELECT ENERGY GEN (MWH) 2,020 7,640 7,640
- 18. NET ELECT ENERGY GEN (MWH)
-6,723
-17,266
-17,266
- 19. UNIT SERVICE FAC10R N/A N/A N/A
- 20. UNIT AVAILABILITY FACTOR N/A N/A N/A
N/A N/A N/A i
- 22. UNIT CAP FACTOR (USING DER NET)
N/A N/A N/A
- 23. UNIT FORCED OUTAGE RATE N/A N/A N/A
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH): NONE
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/16/86 3
- 26. UNITS IN TEST STATUS (PRIOR TO COMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 l
INITIAL ELECTRICITY 10/01/86 09/21/86 CO MERCIAL OPERATION 05/01/87 "To Be determined 8703190544 870313 PDR ADOCK 05000341 i
R PDR
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-341 UNIT FERMI 2 DATE March 13, 1987 COMPLETED BY L. P. Bregni TELEPHONE (313) 586-1617 HONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 75 17 0
2 75 18 0
'3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 N/A 16 0
~
7
~
i s
' UNIT SHUTDOWNS AND POWER E EDUCTIONS '.
DOCKET NO.
50-341 DATE
' March 13.'1987 UNIT NAME Fermi 2 COMPLETED SY L.
P.
Brooni TELEPHONE (313)586-1617-REPORT MONTH November METHOD OF
' LER SYS COMP CAUSE & CORRECTIVE NO.
DATE TYPE DUR REASON SHUTTING DOWN NO.
CODE CODE ACTION TO PREVENT (1)
(HRS)
(2)
THE REACTOR (4)
(5)
RECURRENCE (3) i 86-04 861102 F
694.0 A
2 N/A.
HC HTEXCHO Shutdown to repair the cause'of excessive air..in-leakage into the condenser. Outage scope haw been expanded to include installation of new relief valves to prevent future overpressurization of the condensate return line.
On November 17 1986-'
overpressurization of this.line
-caused an expansion joint to. rupture and damaged a penetration in the Condensate Storage Tank.
Reported in LER 86-045 dated January 12, 1987.
(1) F: FORCED (2) REASON:
(3) METHOD:
(4) EXHIBIT G - INSTRUCTIONS S SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA-B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS'FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
-EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)-
E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD, F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)
SAME SOURCE H - OTHER (EXPLAIN)
(5) EXHIBIT I -
h
.r--