OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY L.P.Bregni DATE March 13, 1987 TELEPHONE (313)586-1617 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes l
2.
REPORTING PERIOD: September l
l 3
LICENSED THERMAL POWER (MWt): 3292 l
l 4.
NAMEPLATE RATING (GROSS MWe):
1215 l
l 5
DESIGN ELECT RATING (Net MWe): 1093 I
I 6.
MAX DEPENDABLE CAP (GROSS MWe):
l l
7 MAX DEPENDABLE CAP (Net MWE):
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
218.6
- 10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power.
(Ref. J. G. Keppler letter of September 12, 1986)
THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 225.9'*
225.9 225.9
- 12. HRS REACTOR WAS CRITICAL 47.2 47.2 47.2
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 8.5 8.5 8.5
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 9936 9936 9936
- 17. GROSS ELECT ENERGY GEN (MWH) 740 740 740
- 18. NET ELECT ENERGY GEN (MWH)
-2043
-2043
-2043
- 19. UNIT SERVICE FACTOR N/A N/A N/A
- 20. UNIT AVAILABILITY FACTOR N/A N/A N/A
N/A N/A N/A
- 22. UNIT CAP FACTOR (USING DER NET)
N/A N/A N/A
- 23. UNIT FORCED OUTAGE RATE N/A N/A N/A
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)
None
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
10/03/86
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 05/01/87 L Electricity at 1406 hours0.0163 days <br />0.391 hours <br />0.00232 weeks <br />5.34983e-4 months <br /> on 09/21/86 g31 DO 5
41 PDR R
AVERA E DAILY UNIT POWER LEVEL DOCKET No.
50-341 UNIT FERMI 2 DATE March 13, 1987 COMPLETED BY L. P. Bregni TELEPHONE (313) 586-1617 MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 31 6
0 22 0
7 0
23 0
i 8
0 24 0
9 0
25 0
to 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 N/A 16 0
}l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-341 DATE March
- 13. 1987 UNIT NAME Fermi COMPLETED BY L.
P.
Bregni TELEPHONE (313)S86-1617 REPORT MONTH September NO.
DATE F: FORCED DURATION REASON METHOD OF SHUTTING CORRECTIVE ACTIONS / COMMENTS S: SCHEDULED (HOURS)
(1)
DOWN THE REACTOR OR REDUCING POWER
-POWER (2) 860903 F
81.5 A
1 Shut down required by Tech Specs to repair an isolation valve.
Reported in LER 86-027 dated October 2,
- 1986, 86-01*
860921 F
217.5
-A 2
Shut.down to repair condenser tube. leaks.
to maintain proper reactor coolant' chemistry.
4 (1)
REASON:
E.
OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD A.
EQUIPMENT FAILURE (EXPLAIN)
F.
ADMINISTRATIVE 9 - OTHER B.
MAINTENANCE OR TEST G.
OPERATIONAL ERROR (EXPLAIN)
C.
REFUELING H.
OTHER (EXPLAIN)
D.
REGULATORY RESTRICTION (2)
METHOD 1.
MANUAL 3.
OTHER (EXPLAIN) l I