OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY L.P.Bregni DATE March 13, 1987 TELEPHONE (313)586-1617 OPERATING STATUS

1. UNIT NAME: Fermi 2 l Notes l
2. REPORTING PERIOD: September l l LICENSED THERMAL POWER (MWt): 3292 l l 3 ,
4. NAMEPLATE RATING (GROSS MWe): 1215 l l 5 DESIGN ELECT RATING (Net MWe): 1093 I I
6. MAX DEPENDABLE CAP (GROSS MWe): l l
  • l 7 MAX DEPENDABLE CAP (Net MWE): l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net): 218.6
10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power. (Ref. J. G. Keppler letter of September 12, 1986)

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 225.9'* 225.9 225.9
12. HRS REACTOR WAS CRITICAL 47.2 47.2 47.2
13. REACTOR RESERVE SHUTDOWN HRS 0 0 0
14. HOURS GENERATOR ON-LINE 8.5 8.5 8.5
15. UNIT RESERVE SHUTDOWN HOURS 0 0 0
16. GROSS THERMAL ENERGY GEN (MWH) 9936 9936 9936
17. GROSS ELECT ENERGY GEN (MWH) 740 740 740
18. NET ELECT ENERGY GEN (MWH) -2043 -2043 -2043
19. UNIT SERVICE FACTOR N/A N/A N/A
20. UNIT AVAILABILITY FACTOR N/A N/A N/A
21. UNIT CAP FACTOR (USING MDC NET) N/A N/A N/A
22. UNIT CAP FACTOR (USING DER NET) N/A N/A N/A
23. UNIT FORCED OUTAGE RATE N/A N/A N/A
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

None

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/03/86
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 05/01/87 L Electricity at 1406 hours0.0163 days <br />0.391 hours <br />0.00232 weeks <br />5.34983e-4 months <br /> on 09/21/86 g31 DO 5 PDR 41 R

. AVERA E DAILY UNIT POWER LEVEL DOCKET No. 50-341 UNIT FERMI 2 DATE March 13, 1987 COMPLETED BY L. P. Bregni TELEPHONE (313) 586-1617 MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 31 6 0 22 0 7 0 23 0 i

8 0 24 0 9 0 25 0 to 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 N/A 16 0 -

}l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-341 DATE March 13. 1987 UNIT NAME Fermi COMPLETED BY L. P. Bregni TELEPHONE (313)S86-1617 REPORT MONTH September NO. DATE F: FORCED DURATION REASON METHOD OF SHUTTING CORRECTIVE ACTIONS / COMMENTS S: SCHEDULED (HOURS) (1) DOWN THE REACTOR OR REDUCING POWER

-POWER (2) 860903 F 81.5 A 1 Shut down required by Tech Specs to repair an isolation valve. Reported in LER 86-027 dated October 2, 1986, 86-01* 860921 F 217.5 -A 2 Shut.down to repair condenser tube. leaks.

to maintain proper reactor coolant' chemistry.

4 (1) REASON: E. OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD A. EQUIPMENT FAILURE (EXPLAIN) F. ADMINISTRATIVE 9 - OTHER B. MAINTENANCE OR TEST G. OPERATIONAL ERROR (EXPLAIN)

C. REFUELING H. OTHER (EXPLAIN)

D. REGULATORY RESTRICTION

" (2) METHOD
1. MANUAL 3. AUTOMATIC SCRAM
2. MANUAL SCRAM 4 OTHER (EXPLAIN) l I