OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY L.P.Bregni DATE March 13, 1987 TELEPHONE (313)586-1617 OPERATING STATUS 1.

UNIT NAME:

Fermi 2 l Notes l

2.

REPORTING PERIOD: September l

l 3

LICENSED THERMAL POWER (MWt): 3292 l

l 4.

NAMEPLATE RATING (GROSS MWe):

1215 l

l 5

DESIGN ELECT RATING (Net MWe): 1093 I

I 6.

MAX DEPENDABLE CAP (GROSS MWe):

l l

7 MAX DEPENDABLE CAP (Net MWE):

l l

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):

218.6

10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power.

(Ref. J. G. Keppler letter of September 12, 1986)

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 225.9'*

225.9 225.9

12. HRS REACTOR WAS CRITICAL 47.2 47.2 47.2
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 8.5 8.5 8.5
15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWH) 9936 9936 9936
17. GROSS ELECT ENERGY GEN (MWH) 740 740 740
18. NET ELECT ENERGY GEN (MWH)

-2043

-2043

-2043

19. UNIT SERVICE FACTOR N/A N/A N/A
20. UNIT AVAILABILITY FACTOR N/A N/A N/A
21. UNIT CAP FACTOR (USING MDC NET)

N/A N/A N/A

22. UNIT CAP FACTOR (USING DER NET)

N/A N/A N/A

23. UNIT FORCED OUTAGE RATE N/A N/A N/A
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

None

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

10/03/86

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 05/01/87 L Electricity at 1406 hours0.0163 days <br />0.391 hours <br />0.00232 weeks <br />5.34983e-4 months <br /> on 09/21/86 g31 DO 5

41 PDR R

AVERA E DAILY UNIT POWER LEVEL DOCKET No.

50-341 UNIT FERMI 2 DATE March 13, 1987 COMPLETED BY L. P. Bregni TELEPHONE (313) 586-1617 MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 31 6

0 22 0

7 0

23 0

i 8

0 24 0

9 0

25 0

to 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 N/A 16 0

}l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-341 DATE March

13. 1987 UNIT NAME Fermi COMPLETED BY L.

P.

Bregni TELEPHONE (313)S86-1617 REPORT MONTH September NO.

DATE F: FORCED DURATION REASON METHOD OF SHUTTING CORRECTIVE ACTIONS / COMMENTS S: SCHEDULED (HOURS)

(1)

DOWN THE REACTOR OR REDUCING POWER

-POWER (2) 860903 F

81.5 A

1 Shut down required by Tech Specs to repair an isolation valve.

Reported in LER 86-027 dated October 2,

1986, 86-01*

860921 F

217.5

-A 2

Shut.down to repair condenser tube. leaks.

to maintain proper reactor coolant' chemistry.

4 (1)

REASON:

E.

OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD A.

EQUIPMENT FAILURE (EXPLAIN)

F.

ADMINISTRATIVE 9 - OTHER B.

MAINTENANCE OR TEST G.

OPERATIONAL ERROR (EXPLAIN)

C.

REFUELING H.

OTHER (EXPLAIN)

D.

REGULATORY RESTRICTION (2)

METHOD 1.

MANUAL 3.

AUTOMATIC SCRAM 2.

MANUAL SCRAM 4

OTHER (EXPLAIN) l I