Revised Monthly Operating Rept for Dec 1986
ML20207S492
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/31/1986
From: Bregni L
DETROIT EDISON CO.
To:
Shared Package
ML20207S480 List:
References
NUDOCS 8703190546
Download: ML20207S492 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

DOCKET NO. 50-341 COMPLETED BY L.P.Bregni DATE March 13, 1987 TELEPHONE (313)586-1617 OPERATING STATUS

1. UNIT NAME: Fermi 2 l Notes l
2. REPORTING PERIOD: December l l 3 LICENSED THERMAL POWER (MWt): 3292 l l
4. NAMEPLATE RATING (GROSS MWe): 1215 l l
5. DESIGN ELECT RATING (Net MWe): 1093 l l
6. # l MAX DEPENDABLE CAP (GROSS MWe): l
  1. l 7 MAX DEPENDABLE CAP (Net MWe): l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net): 218.6
10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power. (Ref. J. G. Keppler letter of September 12, 1986)

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 744 2434.9 2434.9
12. HRS REACTOR WAS CRITICAL 308.9 869.8 869.8
13. REACTOR RESERVE SHUTDOWN HRS 0 0 0
14. HOURS GENERATOR ON-LINE 33 7 129.5 129.5
15. UNIT RESERVE SHUTDOWN HOURS 0 0 0
16. GROSS THERMAL ENERGY GEN (MWH) 55,680 223,248 223,248
17. GROSS ELECT ENERGY GEN (MWH) 2,810 10,450 10,450
18. NET ELECT ENERGY GEN (MWH) -8,693 -25,959 -25,959
19. UNIT SERVICE FACTOR N/A N/A N/A
20. UNIT AVAILABILITY FACTOR N/A N/A N/A
21. UNIT CAP FACTOR (USING MDC NET) N/A N/A N/A
22. UNIT CAP FACTOR (USING DER NET) N/A N/A N/A
23. UNIT FORCED OUTAGE RATE N/A N/A N/A
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

None

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 05/01/87

  • To Be determined 870313 h IM h 05000341 R

PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT FERMI 2 DATE March 13, 1987 COMPLETED BY L. P. Bregni TELEPHONE (313) 586-1617 MONTH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6- 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 68 15 0 31 55 16 0

UNIT SHUTDOWNS AND POWER.EEDUCTIONS :

DOCKET NO. 50-341 DATE March 13. 1987 j UNIT NAME Fermt 2 COMPLETED BY L. P. Bregni .i TELEPHONE. (313)585-1617 , r REPORT MONTH December METHOD OF LER SYS COMP CAUSE'& CORRECTIVE NO. DATE TYPE DUR REASON SHUTTING DOWN NO. CODE CODE ACTION TO PREVENT (1) (HRS) (2) THE REACTOR (4) (5) RECURRENCE (3) 86-04 861102 F 710.7 A 4 N/A HC HTEXCHO Shutdown continued from last month to repair the cause of excessive air in-leakage into the condenser and to install new relief valves to prevent future overpressuriza-tion of the condensate return line.

(1) F: FORCED (2) REASON: (3) METHOD: (4) EXHIBIT G - INSTRUCTIONS S: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D- REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN) (5) EXHIBIT I - SAME SOURCE ,