Proposed Tech Specs,Incorporating Requirement for Daily Channel Check of Control Room Indicating Devices Associated W/Instruments RE05-19 a & B
ML20205G680
Person / Time
Site: Oyster Creek
Issue date: 11/07/1985
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20205G663 List:
References
NUDOCS 8511130317
Download: ML20205G680 (1)


Text

e r

  • IA31E 4.1.1 ,

IIIMIIgge reasCK. CALIBRATISM AND TEST FRE4MENCY FOR PRGIECTIVE IMitatisantTATISM Imatreament Channel gjngsk Calibrate 1321 Remarks ( Ammilea ta f ant - > Calibration)

I 1. Illah Reester Pressure NA 1/3 me. Note 1 By appilcotten of test pressure

2. Illah Bryssell Pressure (Scram) II A 1/3 me. Note 1 By appilsatten af test pressure f 3. Lees Reactor Meter Level Note , 1/3 me. Note 1 By appilcetten of test pressure Lase-Lees Meter Level NA 1/3 me. Olete 1 ily appilcatlen of test pressure l 4.
5. NA 1/3 me. Note 1 By varying level in multch columns

! I.llah Meter..iume isc .rge Level in Scram

6. Lees-Lew-Lo.e Water Level NA 1/3 me. Note 1 By appilcation of test pressure t

j 7. Nish Flow in Main Steamilne I/d I/3 me. Note 1 By appilcatlen of test pressure h 8. Lees Pressure in Main NA 1/3 me. Note 1 By appilcation of test pressure Steamilne

, 9. Nlsh Bryteell Pressure 3/d 1/3 me. Note 1 By appilcation of test pressure -

l (Core Coellns)

! 15. Main Steen Isolatten Valve NA NA 1/3 me. By exercising valve

) (Scram)

18. APRM Level NA 1/3d MA .

Output adjustment using operatlenal type

heat betence derine peeeer operatien 1

APRM Scram Trips Note 2 1/sek 1/uk using built-la cellbretten egulpment l

i ehering poseer operetten

! 12. APRM Red Blocks Note 2 1/3 se 1/me Upscale and denenecate

13. a. NIsh Radietlen In Main 1/s 1/3 se 1/esk Using bestit-la calibration egulpment Steamilne diaring passer operetlen j

! b. Sensers for 13(a) NA Each refuel NA Using enternal radiatten source l ing outage 4

i i

1 4 IISTE la luttially once/mo, thereaf ter according to Fig. 4.1.1, with an interval not less than one month ,s.

I mor more than three months. 8;*

5 Noto 2 t At leas t d.it ly du riny, reactor power operation , the mesctor neutrea flux peaking factor shall be estis.atea **

J and the flua-refucaced APR;4 scram and raJ block i.etti.gs shall be adjusted, if necessary, as specified l In Section 2.3, Specif f rationn (1) (.a) .utd (2) (a).

1 1

q Note 3: A daily channel check will be performed f ital 3 only using RE 21 A and B to verify Reactor Water Level Instrumentation header operability, I

0511130317 851107 PDR ADOCK 05000219 i p PM '