Letter Sequence Request |
---|
|
|
MONTHYEARML20199L1091986-04-0303 April 1986 Station Blackout Evaluation Rept,Grand Gulf Nuclear Station Project stage: Other AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid1986-04-0303 April 1986 Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid Project stage: Other ML20203J9631986-07-25025 July 1986 Proposed Tech Spec,Modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training to Satisfy NUREG-0694,TMI Action Plan Item I.G.1 Requirement to Conduct Simulated Loss of Power Test Project stage: Other AECM-86-0198, Application for Amend to License NPF-29,modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training & Testing to Satisfy NUREG-0694,Item I.G.1 Requirement to Conduct Simulated Loss of Power Test.Fee Paid1986-07-25025 July 1986 Application for Amend to License NPF-29,modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training & Testing to Satisfy NUREG-0694,Item I.G.1 Requirement to Conduct Simulated Loss of Power Test.Fee Paid Project stage: Request AECM-86-0243, Application for Amend to License NPF-29,modifying License Condition 2.C(33)(b) Requiring Util to Conduct Simulated Loss of Onsite & Offsite Alternating Current Power Test1986-08-11011 August 1986 Application for Amend to License NPF-29,modifying License Condition 2.C(33)(b) Requiring Util to Conduct Simulated Loss of Onsite & Offsite Alternating Current Power Test Project stage: Request ML20056A7491990-08-0707 August 1990 Forwards Safety Evaluation Accepting Licensee Fire Barrier Penetration Seal Program & Commitment to Complete 100% Review of All Tech Spec Fire Penetration Seals by 911231 Project stage: Approval 1986-07-25
[Table View] |
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20217F1951999-10-0707 October 1999 Application for Amend to License NPF-29,to Revise Licensing Basis to Credit One of Insights/Conclusions of NUREG-1465, Revised Source Term Insights ML20211E7061999-08-20020 August 1999 Application for Amend to License NPF-29,incorporating Many of Generic Improvements Agreed Upon Between Industry & NRC Since GGNS Conversion to ITS ML20196K0791999-06-29029 June 1999 Suppl to 980720 Application for Amend to License NPF-29, Implementing BWROG Enhanced Option I-A,reactor Stability long-term Solution.Rev to TS 3.4.1 Inadvertently Omitted from Original Application ML20196G6901999-06-23023 June 1999 Application for Amend to License NPF-29,revising TS Associated with Various Esfss Which Need No Longer Be Credited Following Design Basis Fuel Handling Accident ML20206K5241999-05-0606 May 1999 Application for Amend to License NPF-29,changing TSs Required to Support Ggns,Cycle 11 Operation,Including Slmcpr.Portions of Encl Re Addl Info on Calculated Cycle Specific SL MCPR for Plant Cycle 11 Withheld ML20206R9271999-01-12012 January 1999 Application for Amends to Licenses NPF-29 & NPF-47,proposing Required Actions Consistent with NRC Accepted Change to BWR Improved TS NUREG-1433 & NUREG-1434 ML20236T1551998-07-20020 July 1998 Application for Amend to License NPF-29,revising TSs Re BWROG Enhanced Option I-A Reactor Stability Long Term Solution ML20198J3451998-01-0909 January 1998 Revised Application for Amend to License NPF-29,providing Clarifications to Amend & Adding Restriction to Allowed Interval Extensions Re Option B of 10CFR50,app J ML20198N3851997-10-28028 October 1997 Application for Amend to License NPF-29,revising TS to Implement Option B & Ref SE Issued by NRR for Ggns'S App J Exemption as Implementing Document for performance-based Leakage Testing Program ML20210V5461997-09-18018 September 1997 Application for Amend to License NPF-29,reflecting Decrease of Two Recirculation Loop SLMCPR to 1.11 & Single Recirculation Loop SLMCPR Limit to 1.12.Proprietary Info Re SLMCPR for Cycle 10,encl.Proprietary Info Withheld ML20134E1191996-10-22022 October 1996 Application for Amend to License NPF-29,revising TS Figure 3.4.11-1, Minimum Reactor Vessel Metal Temperature Vs Reactor Vessel Pressure, Curves Using Methodology of Reg Guide 1.99,Rev 2, Radiation Embrittlement.. ML20117P4421996-09-19019 September 1996 Application for Amend to License NPF-29,changing Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20117G6661996-08-27027 August 1996 Application for Amend to License NPF-29,modifying Tech Specs Surveillance Requirements for Safety/Relief Valves ML20116F0141996-07-31031 July 1996 Rev 1 to Application for Amend to License NPF-29,revising TSs Required to Support Cycle 9,reload 8.Rev 1 to J11-02863SLMCPR, GGNS Cycle 9 Safety Limit MCPR Analysis Encl.Rept Withheld ML20113B7341996-06-20020 June 1996 Application for Amend to License NPF-29,redefining Secondary Containment Boundary to Allow Encl Bldg to Be Inoperable During Upcoming Refueling Outage ML20112E1741996-05-31031 May 1996 Application for Amends to Licenses NPF-29 & NPF-47 Adding Addl Acceptable Required Actions to Tech Spec Limiting Condition for Operation (LCO) 3.9.1, Refueling Equipment Interlocks ML20117F4541996-05-0909 May 1996 Application for Amend to License NPF-29,modifying SRV Surveillance Test for Relief Mode of Operation ML20117D6901996-05-0909 May 1996 Application for Amend to License NPF-29,revising TSs to Support Unit 1,cycle 9 Including Changes to SLMCPR & Ref for Analytical Methods Used to Determine Core Operating Limits ML20111B2631996-05-0808 May 1996 Application for Amend to License NPF-29,placing Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20108E3551996-05-0606 May 1996 Application for Amend to License NPF-29,changing Name from Mississippi Power & Light to Entergy Mississippi,Inc ML20107E2521996-04-18018 April 1996 Application for Amend to License NPF-29,prohibiting Performance of 24-h EDG Maint Run While Unit in Either Mode 1/2 RBG-42766, Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells1996-04-18018 April 1996 Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells ML20100J8311996-02-22022 February 1996 Application for Amend to License NPF-29,modifying Safety Setpoint to Tolerance Requirements for Safety/Relief Valves ML20097C3491996-02-0101 February 1996 Application for Amend to License NPF-29,revising TS Bases to Include Changes Since 950221 Approval of TS Bases RBG-42193, Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage1995-11-20020 November 1995 Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage ML20087B5031995-08-0101 August 1995 Application for Amend to License NPF-29,by Revising TS Assoc W/Various ESF Sys Following Design Fuel Handling Accident ML20086N2071995-07-21021 July 1995 Application for Amend to License NPF-29,proposing to Recapture Approx 2 1/2 Yrs of Low/No Power Operation by Extending 40-yr Operating License Term from 220616 to 241101 ML20078S4891995-02-14014 February 1995 Application for Amend to License NPF-29 Consisting of Changes to TS Requirements 4.4.1.4.a.1 & 4.6.1.4.a.2 ML20078N6481995-02-10010 February 1995 Application for Amend to License NPF-29,consisting of Mod to Proposed Amend to OL (PCOL-93/13),requesting to Perform Drywell Bypass Leakage Rate Surveillance on Performance Based Interval ML20079B4431994-11-0909 November 1994 Application for Amend to License NPF-29,revising TS Associated W/Various ESF Sys Following Design Basis Fuel Handling accident.Mark-up of Current Ts,Proposed TS & mark- Up Improved TS Encl ML20076F9781994-10-12012 October 1994 Application for Amend to License NPF-29,consisting of PCOL-94/01,closing & Deleting License Condition 2.C.(26) for Turbine Disc integrity.Mark-up of Affected OL Page & Proprietary Supporting Info Encl.Proprietary Info Withheld ML20069P4401994-06-17017 June 1994 Proposed Amend to OL (PCOL-94/02),removing License Conditions for EDGs Associated w/NUREG-1216 ML20059H6011994-01-13013 January 1994 Application for Amend to License NPF-29,consisting of Proposed Amend to OL PCOL-93/15,removing 2,324 Spent Fuel Pool Storage Limit & Allowing Full Use of Spent Fuel Storage Spaces ML20059A4801993-10-22022 October 1993 Application for Amend to License NPF-29,modifying Testing Frequencies for Drywell Bypass Test & Airlock Tests ML20059B0131993-10-15015 October 1993 Application for Amend to License NPF-29,converting Current GGNS TS to TS Based Largely on NUREG-1434,Rev 0 ML20056E2861993-08-17017 August 1993 Application for Amend to License NPF-29,proposing Changes to Amend TS Section 3/4.3.7.10, Loose Part Detection Sys by Relocating Loose Part Detection Instrumentation to Administrative Controls ML20056D5321993-08-11011 August 1993 Proposed Change to OL (PCOL-93/09) to License NPF-29, Amending TS Section 3/4.3.7.5 by Relocating Certain Accident Monitoring Instrumentation from TS to Administrative Control,Per NUREG-1434,Rev 0,w/respect to RG 1.97 ML20046D2041993-08-11011 August 1993 Proposed Change to OL (PCOL-93/07) to License NPF-29, Amending TS Section 3/4.3.7.10, Loose Part Detection Sys by Relocating Locating Loose Part Detection Instrumentation from TS to Administrative Controls,Per NUREG-1434,Rev 0 ML20046D1911993-08-11011 August 1993 Proposed Change to OL (PCOL-93/06) to License NPF-29, Revising TS to Support Compliance W/New Requirements of 10CFR20 & 10CFR50.36a ML20056C7131993-07-15015 July 1993 Application for Amend to License NPF-29,proposing Changes to Remove Operability Requirements for auto-test Feature of Load Shedding & Sequencing Sys & Increase AOT for Inoperable Load Shedding & Sequencing Sys from Eight to Twelve Hours ML20045H7111993-07-14014 July 1993 Application for Amend to License NPF-29,changing TS to Eliminate Previous Retrictions on Ensuring Operability of Igniters in Encl Areas & Igniters in Open Areas Adjacent to Inoperable Igniters & Redefining Hydrogen Ignition Sys ML20044F1571993-05-20020 May 1993 Proposed Amend PCOL-93/04 to License NPF-29,revising TS 4.8.3.1.2 & 4.8.3.2.2 to Remove Operability Requirements for auto-test Feature of Load Shedding & Sequencing (LSS) Sys & Increase AOT for Inoperable LSS Sys from Eight to 24 H ML20044F1621993-05-20020 May 1993 Proposed Amend PCOL-92/09 to License NPF-29,removing Unnecessary Operability Requirements for IRMs & APRMs During Plant Shutdown Conditions.Ts Changes Follow NUREG-1434, Rev 0 Requirements ML20116D1391992-10-29029 October 1992 Application for Amend to License NPF-29,consisting of Proposed Change,Revising TS Per Generic Ltr 88-16, Removal of Cycle Specific Parameter Limits from TS, That Will Change Each Fuel Cycle ML20118A5681992-09-14014 September 1992 Application for Amend to License NPF-29,deleting TS Tables 3.6.4-1 Re Containment & Drywell Isolation Valves, 3.6.6.2-1 Re Secondary Containment Ventilation Sys & 3.8.4.2-1 Re MOV Thermal Overload Protection,Per GL 91-08 ML20113H6001992-07-29029 July 1992 Application for Amend to License NPF-29,consisting of PCOL-92/03,changing Selected TS Instrumentation Surveillance Test Intervals & Allowed Outage Times,Based on Cited GE Repts ML20101B6681992-05-29029 May 1992 Application for Amend to License NPF-29,changing TS Bases 3/4.9.7, Crane Travel - Spent Fuel & Upper Containment Fuel Storage Pools ML20096B8861992-05-0606 May 1992 Application for Amend to License NPF-29,changing TS Re Primary Containment Penetration Conductor Overcurrent Protective Devices,Under Exigent Circumstances,Per Generic Ltr 89-10 ML20095K0351992-04-30030 April 1992 Application for Amend to License NPF-29,changing TS 3/4.3.1 Re Reactor Protection Sys instrumentation,3/4.3.6 Re Control Rod Block Instrumentation & 3/4.3.7.6 Re Source Range Monitors,Per Violations in Insp Rept 50-416/92-04 ML20095E7341992-04-22022 April 1992 Suppl to 910626 Application for Amend to License NPF-29, Modifying Wording of Requested Change to LCO 3.3.2,Action B Re Extension of Instrumentation Surveillance Intervals & Allowed Outage Times 1999-08-20
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217F1951999-10-0707 October 1999 Application for Amend to License NPF-29,to Revise Licensing Basis to Credit One of Insights/Conclusions of NUREG-1465, Revised Source Term Insights ML20211E7061999-08-20020 August 1999 Application for Amend to License NPF-29,incorporating Many of Generic Improvements Agreed Upon Between Industry & NRC Since GGNS Conversion to ITS ML20196K0791999-06-29029 June 1999 Suppl to 980720 Application for Amend to License NPF-29, Implementing BWROG Enhanced Option I-A,reactor Stability long-term Solution.Rev to TS 3.4.1 Inadvertently Omitted from Original Application ML20196G6901999-06-23023 June 1999 Application for Amend to License NPF-29,revising TS Associated with Various Esfss Which Need No Longer Be Credited Following Design Basis Fuel Handling Accident ML20206K5241999-05-0606 May 1999 Application for Amend to License NPF-29,changing TSs Required to Support Ggns,Cycle 11 Operation,Including Slmcpr.Portions of Encl Re Addl Info on Calculated Cycle Specific SL MCPR for Plant Cycle 11 Withheld ML20206R9271999-01-12012 January 1999 Application for Amends to Licenses NPF-29 & NPF-47,proposing Required Actions Consistent with NRC Accepted Change to BWR Improved TS NUREG-1433 & NUREG-1434 ML20236T1551998-07-20020 July 1998 Application for Amend to License NPF-29,revising TSs Re BWROG Enhanced Option I-A Reactor Stability Long Term Solution ML20217P0241998-04-0606 April 1998 Amend 135 to License NPF-29,revising TSs for GGNS to Permit Implementation of Containment Leak Rate Testing Provisions of 10CFR50,App J,Option B ML20198J3451998-01-0909 January 1998 Revised Application for Amend to License NPF-29,providing Clarifications to Amend & Adding Restriction to Allowed Interval Extensions Re Option B of 10CFR50,app J ML20198N3851997-10-28028 October 1997 Application for Amend to License NPF-29,revising TS to Implement Option B & Ref SE Issued by NRR for Ggns'S App J Exemption as Implementing Document for performance-based Leakage Testing Program ML20210V5461997-09-18018 September 1997 Application for Amend to License NPF-29,reflecting Decrease of Two Recirculation Loop SLMCPR to 1.11 & Single Recirculation Loop SLMCPR Limit to 1.12.Proprietary Info Re SLMCPR for Cycle 10,encl.Proprietary Info Withheld ML20134E1191996-10-22022 October 1996 Application for Amend to License NPF-29,revising TS Figure 3.4.11-1, Minimum Reactor Vessel Metal Temperature Vs Reactor Vessel Pressure, Curves Using Methodology of Reg Guide 1.99,Rev 2, Radiation Embrittlement.. ML20117P4421996-09-19019 September 1996 Application for Amend to License NPF-29,changing Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20117G6661996-08-27027 August 1996 Application for Amend to License NPF-29,modifying Tech Specs Surveillance Requirements for Safety/Relief Valves ML20116F0141996-07-31031 July 1996 Rev 1 to Application for Amend to License NPF-29,revising TSs Required to Support Cycle 9,reload 8.Rev 1 to J11-02863SLMCPR, GGNS Cycle 9 Safety Limit MCPR Analysis Encl.Rept Withheld ML20113B7341996-06-20020 June 1996 Application for Amend to License NPF-29,redefining Secondary Containment Boundary to Allow Encl Bldg to Be Inoperable During Upcoming Refueling Outage ML20112E1741996-05-31031 May 1996 Application for Amends to Licenses NPF-29 & NPF-47 Adding Addl Acceptable Required Actions to Tech Spec Limiting Condition for Operation (LCO) 3.9.1, Refueling Equipment Interlocks ML20117D6901996-05-0909 May 1996 Application for Amend to License NPF-29,revising TSs to Support Unit 1,cycle 9 Including Changes to SLMCPR & Ref for Analytical Methods Used to Determine Core Operating Limits ML20117F4541996-05-0909 May 1996 Application for Amend to License NPF-29,modifying SRV Surveillance Test for Relief Mode of Operation ML20111B2631996-05-0808 May 1996 Application for Amend to License NPF-29,placing Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20108E3551996-05-0606 May 1996 Application for Amend to License NPF-29,changing Name from Mississippi Power & Light to Entergy Mississippi,Inc ML20107E2521996-04-18018 April 1996 Application for Amend to License NPF-29,prohibiting Performance of 24-h EDG Maint Run While Unit in Either Mode 1/2 RBG-42766, Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells1996-04-18018 April 1996 Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells ML20100J8311996-02-22022 February 1996 Application for Amend to License NPF-29,modifying Safety Setpoint to Tolerance Requirements for Safety/Relief Valves ML20097C3491996-02-0101 February 1996 Application for Amend to License NPF-29,revising TS Bases to Include Changes Since 950221 Approval of TS Bases RBG-42193, Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage1995-11-20020 November 1995 Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage ML20087B5031995-08-0101 August 1995 Application for Amend to License NPF-29,by Revising TS Assoc W/Various ESF Sys Following Design Fuel Handling Accident ML20086N2071995-07-21021 July 1995 Application for Amend to License NPF-29,proposing to Recapture Approx 2 1/2 Yrs of Low/No Power Operation by Extending 40-yr Operating License Term from 220616 to 241101 ML20078S4891995-02-14014 February 1995 Application for Amend to License NPF-29 Consisting of Changes to TS Requirements 4.4.1.4.a.1 & 4.6.1.4.a.2 ML20078N6481995-02-10010 February 1995 Application for Amend to License NPF-29,consisting of Mod to Proposed Amend to OL (PCOL-93/13),requesting to Perform Drywell Bypass Leakage Rate Surveillance on Performance Based Interval ML20079B4431994-11-0909 November 1994 Application for Amend to License NPF-29,revising TS Associated W/Various ESF Sys Following Design Basis Fuel Handling accident.Mark-up of Current Ts,Proposed TS & mark- Up Improved TS Encl ML20076F9781994-10-12012 October 1994 Application for Amend to License NPF-29,consisting of PCOL-94/01,closing & Deleting License Condition 2.C.(26) for Turbine Disc integrity.Mark-up of Affected OL Page & Proprietary Supporting Info Encl.Proprietary Info Withheld ML20069P4401994-06-17017 June 1994 Proposed Amend to OL (PCOL-94/02),removing License Conditions for EDGs Associated w/NUREG-1216 ML20059H6011994-01-13013 January 1994 Application for Amend to License NPF-29,consisting of Proposed Amend to OL PCOL-93/15,removing 2,324 Spent Fuel Pool Storage Limit & Allowing Full Use of Spent Fuel Storage Spaces ML20059A4801993-10-22022 October 1993 Application for Amend to License NPF-29,modifying Testing Frequencies for Drywell Bypass Test & Airlock Tests ML20059B0131993-10-15015 October 1993 Application for Amend to License NPF-29,converting Current GGNS TS to TS Based Largely on NUREG-1434,Rev 0 ML20056E2861993-08-17017 August 1993 Application for Amend to License NPF-29,proposing Changes to Amend TS Section 3/4.3.7.10, Loose Part Detection Sys by Relocating Loose Part Detection Instrumentation to Administrative Controls ML20046D2041993-08-11011 August 1993 Proposed Change to OL (PCOL-93/07) to License NPF-29, Amending TS Section 3/4.3.7.10, Loose Part Detection Sys by Relocating Locating Loose Part Detection Instrumentation from TS to Administrative Controls,Per NUREG-1434,Rev 0 ML20046D1911993-08-11011 August 1993 Proposed Change to OL (PCOL-93/06) to License NPF-29, Revising TS to Support Compliance W/New Requirements of 10CFR20 & 10CFR50.36a ML20056D5321993-08-11011 August 1993 Proposed Change to OL (PCOL-93/09) to License NPF-29, Amending TS Section 3/4.3.7.5 by Relocating Certain Accident Monitoring Instrumentation from TS to Administrative Control,Per NUREG-1434,Rev 0,w/respect to RG 1.97 ML20056C7131993-07-15015 July 1993 Application for Amend to License NPF-29,proposing Changes to Remove Operability Requirements for auto-test Feature of Load Shedding & Sequencing Sys & Increase AOT for Inoperable Load Shedding & Sequencing Sys from Eight to Twelve Hours ML20045H7111993-07-14014 July 1993 Application for Amend to License NPF-29,changing TS to Eliminate Previous Retrictions on Ensuring Operability of Igniters in Encl Areas & Igniters in Open Areas Adjacent to Inoperable Igniters & Redefining Hydrogen Ignition Sys ML20044F1571993-05-20020 May 1993 Proposed Amend PCOL-93/04 to License NPF-29,revising TS 4.8.3.1.2 & 4.8.3.2.2 to Remove Operability Requirements for auto-test Feature of Load Shedding & Sequencing (LSS) Sys & Increase AOT for Inoperable LSS Sys from Eight to 24 H ML20044F1621993-05-20020 May 1993 Proposed Amend PCOL-92/09 to License NPF-29,removing Unnecessary Operability Requirements for IRMs & APRMs During Plant Shutdown Conditions.Ts Changes Follow NUREG-1434, Rev 0 Requirements ML20116D1391992-10-29029 October 1992 Application for Amend to License NPF-29,consisting of Proposed Change,Revising TS Per Generic Ltr 88-16, Removal of Cycle Specific Parameter Limits from TS, That Will Change Each Fuel Cycle ML20118A5681992-09-14014 September 1992 Application for Amend to License NPF-29,deleting TS Tables 3.6.4-1 Re Containment & Drywell Isolation Valves, 3.6.6.2-1 Re Secondary Containment Ventilation Sys & 3.8.4.2-1 Re MOV Thermal Overload Protection,Per GL 91-08 ML20113H6001992-07-29029 July 1992 Application for Amend to License NPF-29,consisting of PCOL-92/03,changing Selected TS Instrumentation Surveillance Test Intervals & Allowed Outage Times,Based on Cited GE Repts ML20101B6681992-05-29029 May 1992 Application for Amend to License NPF-29,changing TS Bases 3/4.9.7, Crane Travel - Spent Fuel & Upper Containment Fuel Storage Pools ML20096B8861992-05-0606 May 1992 Application for Amend to License NPF-29,changing TS Re Primary Containment Penetration Conductor Overcurrent Protective Devices,Under Exigent Circumstances,Per Generic Ltr 89-10 ML20095K0351992-04-30030 April 1992 Application for Amend to License NPF-29,changing TS 3/4.3.1 Re Reactor Protection Sys instrumentation,3/4.3.6 Re Control Rod Block Instrumentation & 3/4.3.7.6 Re Source Range Monitors,Per Violations in Insp Rept 50-416/92-04 1999-08-20
[Table view] |
Text
..
MISSISSIPPI POWER & LIGHT COMPANY
] Helping Build Mississippi P. O. B O X 1640, J A C K S O N, MIS SIS SIP PI 39215-1640 August 11, 1986 O. D. KINGSLEY, J R.
VICE PRESIDENT NUCLEAR OPERATIONS U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. 20555 Attention: Mr. Harold R. Denton, Director
Dear Mr. Denton:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 i Docket No. 50-416 License No. NPF-29 File: 0260/0840/L-860.0 Proposed Amendment to the Operating License (PCOL-86/18)
Supplement AECM-86/0243 Mississippi Power & Light (MP&L) made a submittal, AECM-86/0198, dated July 25, 1986, requesting an amendment to Facility Operating License No. NPF-29 for Grand Gulf Nuclear Station (GGNS) Unit 1. The proposed amendment modifies License Condition 2.C.(33)(b) requiring that MP&L conduct a simulated loss of onsite and offsite alternating current power test.
Based on conversations with the staff, MP&L wishes to supplement AECM-86/0198 to revise the New License Condition as follows:
Prior to restart following the first refueling outage, MP&L shall complete the additional training and testing related to TMI Action Plan I.G.I as described in Section 2.3 of the MP&L submittal dated April 3, 1986.
This change provides a more specific requirement than originally proposed but has no affect on the technical content of the earlier submittal.
For the convenience of the staff the entire submittal is enclosed with the above change incorporated. The remainder of the submittal is unchanged.
In accordance with the provisions of 10 CFR 50.30, three (3) signed originals and forty (40) copies of the requested amendment are enclosed. The attachment provides the complete technical justification and discussion to support the requested amendment. The technical content and safety concerns associated with this proposed amendment were reviewed and accepted by the Plant Safety Review Committee (PSRC) and the Safety Review Committee (SRC) at the time of the original submittal.
8008190278 860725 DR ADOCKOSOOg6 J12AECM86073102 - 1 i i Member Middle South Utilities System l
AECM-86/0243 Pags 2 Based on the guidelines presented in 10 CFR 50.92, it is the opinion of MP8L that this proposed amendment involves no significant hazards considerations.
Yours ly, ODK:rg '\'
Attachments: GGNS PCOL-86/18 cc: Mr. T. H. Cloninger (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. R. C. Butcher (w/a)
Mr. James M. Taylor, Director (w/a)
Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. J. Nelson Grace, Regional Administrator (w/a)
U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Dr. Alton B. Cobb (w/a)
State Health Officer State Board of Health Box 1700 Jackson, Mississippi 39205 J12AECM86073102 - 2
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSE NO. NPF-29 i
DOCKET NO. 50-416 IN THE MATTER OF MISSISSIPPI POWER & LIGHT COMPANY and MIDDLE SOUTH ENERGY, INC.
and SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION AFFIRMATION I, O. D. Kingsley, Jr., being duly sworn, stated that I am Vice President, Nuclear Operations of Mississippi Power & Light Company; that on behalf of Mississippi Power & Light Company, Middle South Energy, Inc., and South Mississippi Electric Power Association I am authorized by Mississippi Power & Light Company to sign and file with the Nuclear Regulatory Commission, this application for amendment of the Operating License of the Grand Gulf Nuclear Station; that I signed this application as Vice President, Nuclear l,
Operations of Mississippi Power & Light Company; and that the statements madc and the matters set forth therein are true and correct to th best of my knowledge, information and belief.
.t
'T). M Kings 1 .
STATE OF MISSISSIPPI COUNTY OF HINDS SUBSCRIBED AND SWORN T0 befog me, a Not y Public, in and for the County and State above named, this //Nday of _
, , 1986.
I (SEAL) i
.AlaNotary.Public a0 W My commission expires:
hg Commissi:n Dphes Se? II 1937 J12AECM86073102 - 4
, , - . , , ----....---.m -- ,_ ,
- 1) OLCR NLS-86/02
SUBJECT:
Facility ConditionOperating (License No. NPF-29, page 11 License 2.C.(33)b)
DISCUSSION: Mississippi Power & Light Company (MP&L) wishes to amend the Grand Gulf Nuclear Station (GGNS) Operating License replacing License Condition 2.C.(33)(b):
MP&L shall conduct a special test, Simulated Loss of Onsite and Offsite Alternating-Current Power Test, as described in the MP&L letter dated August 18, 1981. At least 4 weeks prior to per-forming the Special Test, MP&L shall provide a safety analysis for this test and its procedures to NRC for review and approval.
with the following:
Prior to restart following the first refueling outage, MP&L shall complete the additional training and testing related to TMI Action Plan'I.G.1 as described in Section 2.3 of the MP&L~ submittal dated April 3, 1986.
JUSTIFICATION: The requirement for performing an SB0 test originated from TMI Action Plan Item I.G.1, " Training During Low Power Testing." This Action Plan item, as presented in NUREG 0694, requested that applicants, "... define 'and commit to a special low-power testing program approved by NRC to be conducted at power levels no greater than 5 percent for the purposes of providing meaningful technical information beyond that obtained in the normal startup test program and to provide supplemental training."
In a January 27, 1981 letter from the NRC, Mississippi Power & Light was requested to commit to performing an SB0 test as part of TMI Item I.G.I.
MP&L committed to perform a Low-Power Test Training Program to be developed using the guidelines provided in the report "BWR Owners' Group Program for Compliance with NUREG 0737, Item I.G.1 Training During Low Power Testing" and also -
committed to perform a Station Blackout test.
The Grand Gulf Facility Operating License, NPF-29, consequently contained licensing condition 2.C.(33)(b) which required MP&L to conduct a simulated SB0 test.
J13ATTC86062701 - 1
b In NRC Generic' Letter 83-24, the NRC modified their !
position on SB0 testing by stating "..if it can be demonstrated that temperature and/or other SB0 test ,
, conditions would adversely impact and pose a hazard to !
plant equipment, the BWR Uwners' Group recommendations by
, themselves would constitute compliance with Item '
I.G.1...." MP&L submittec' a Station Blackout report, transmitted by letter AECM-86/0042 dated April 3, 1986.
Section 2.0 of this report provides justification for not performing the SB0 test. This report shows that GGNS can
, withstand an SB0 for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> given no additional failures and points out the detrimental effect to plant components if SB0 testing were allowed to progress to the point where temperature (xceeds normal limits.
SIGNIFICANT HAZARDS CONSIDERATION: ,
- 1. MP&L has determined that no significant increase in probability or consequences of an accident previously evaluated exists due to this change. This
- change-will not result in changes to hardware or operating
- procedures at GGNS. The object of "providing
. meaningful technical information beyond that obtained
- in the normal startup test program and to provide !
supplemental training" is fulfilled by alternate 4 training and testing without the possible detrimental effects of the originally proposed test.- The above .
conclusions are supported by the Station Blackout Report submitted to the NRC by MP&L April 3, 1986.
- 2. The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated since it will not result in hardware or operating procedure changes. ,
! 3. There is no significant reduction in margin of safety
- since the intent of performing alternate testing '
' is to avoid degradation of plant equipment. As shown in the above referenced Station Blackout report the
, training goals are being met through alternate testing.
The Station Blackout Report itself provided additional analytical information on plant performance under SB0 conditions.
l Therefore, deleting the requirement to conduct a special simulated loss of onsite alternating-current power test and instead demonstrating the adverse impact of such a test and i implementing the BWR Owners' recommendations for compliance i with I.G.1 does not involve a significant hazards L consideration. :
J J13ATTC86062701 - 2
i i
(a) Control Room Design Review (I.D.I. SER; Appendia E. SSER #2 55ER #4, 55ER f5)
Prior to startup following the first refueling outage, MP&L l shall demonstrate the ability to maintain an effective temperature" condition of 85'F or less in the remote shut-down panel (RSP) room for at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with an ambient outdoor temperature of at least 95'F.
(b) TrainingDuringLow-PowerTestino(I.G.I.SER) nret-4ati conauct a speciai test, stamistea Loss e
- and OffsflPA atin -Current Power Te escribed in INSERT ' the MP&L letter date . 1 . At least 4 weeks prior to performin a P&L shall provide a safety an r this test and its pro o NRC for nd accroval.
- (c) Post Accident Samp1tne (11.B.3 SER $$ER fl. SSER #4
- 55ER f5) ,
Prior to startup following the first refueling outage. MP&L shall incorporate the additional requirements into the procedure for relating radionuclide caseous and ionic l species to estimate core damage as d'scussed in Section 11.8.3.1 of SSER F4.
(d) _ Hydrogen Control (Section 11.8.7. SER SSER #2 SSER f3 55ER#4,55ERF5)
(1) During the first cycle of operation, MP&L shall maintain a suitable program of analysis and testing of the installed hydrogen ignition system. MP&L shall submit to the NRC quarterly reports on the status of their research programs.
(a) MP&L shall amend its research program on hydrogen control measures to include, but not be limited to, the following items:
- 1) Perform containment sensitivity analysis to determine the adequacy of the hydrogen control system for a spectrum of degraded core accidents including the determination of accident sequences for which equipment .
survivability is assured
, - - - , - - - - . - , - , . - . - - - - , , - , - , , , , - - - - - - , - - . , , _ _ _ , _ , _ , ---.---- - -.--.---- --- --. .---,---.. -~..,,--
Insert to Operating License Condition 2.C(33)(b)
Prior to restart following the first refueling outage, MPAL shall coitplete the additional training and testing related to TMI Action Plan I.G.1 as described in Section 2.3 of the MP&L submittal dated April 3, 1986.
J13ATTC86062701 - 3