TT WINL T AP 660 0
TURBINE TRIP 1.0 ENTRY CONDITIONS If Rx power is < 45%,
B1D either of the following:
e Turbine trip has occurred
- Turbine trip should have occurred IHit{ use this procedure, f
1 Approved by MNPO Date /2 /0 /9 7 (SIGNAMJRE ON FILE)
AP-660 PAGE 1 of 17 TT K
5
~
j i
l l=
BLANK PAGE
. gs.d
- AP 660 REV 10 PAGE 2 of 17-TT.
~.
.g v
2.0 IMEDIATE ACTIONS ACTIONS [
' DETAILS' L. 2. lL Depress Mein-LTurbineLtrip push button.
-2.2
- Verify 1TVs and-GVs are-
~
iciosed._
IE any TV,-
I close a.11 MSIVs:
AND any GV-are HQI closed, IRB close all MSIVs' and M5V-412
-trip the Rx.
MSV-413 MSV-414 MSV-411 2
Depress Rx trio push button-and 60 TO E0P-02, Vital System
.O Status Verification, beginning with step 2.1 2.3 Stabilize RCS-PRESS.
+
AV AP-660 REV 10 PAGE 3 of 17 TT I
O
's BLANK PAGE 7
- O' V
AP-660 REV 10 PAGE 4 of 17 TT
r l
4 3,0 FOLLOW UP ACTIONS ACTIONS b]Aj.LS r
3.1,_.,. Notify-personnel of plant e
STA l
conditions.
I e __, Plant Operators 5S00 (evaluate plant _ conditions I
for entry into the Emer incy v
Plan) l
].
i i
3.2 Ensure ICS runback in l
- progress, t
'J. 3 Ensure MS Hdr PRESS controlled between 870 and
,, I 900 psig by TBVs or ADVs.
i O
3.4 Ensure Main Generator t
output Bkrs are open.
__ Bkr 1661 Bkr 1662 if, any output Bkr fails to 1 Select affected output Bkr to open.
" BACKUP":
lii[N tttempt to open i
output Bkr using backup "BKR 1661 TRIP C0ll SELECTOR trip coils.
SWITCH" "BKR 1602 TRIP C0ll SELECTOR SWITCH" 2 Open affected output Bkrs:
Bkr 1661-i Skr 1662 3
jf output Bkrs are fiQ1 open, It!LN notify System Dispatcher to separate CR 3 from grid.
'AP 660-REV 10 PAGE 5 of 17 TT-
... ~..
i t
I l
4 s
BLANK PAGE i
t' AP 660 REV 10 PAGE 6 of 17 TT i
r m.
,-.-....m,.
1 L9 FOLLOW UP ACTIONS (CONT'D)
ACTIONS DETAILS I
3.5 IE CR 3 i!. separated from e
Open field Bkr.
l the grid.
j liff3 shutdown Main e
Select voltage regulator to j
Generator.
"0FF".
-r 3.6 Ensure plant conditions-RCS PRESS l
1 stabilize.
o _,OTSGs on LLL e __ Steaming rate within capacity of TBVs or ADVs e _ Tm f
i 3.7-Maintain PZR level.
O See OP 100A, Startup Curves, Curve 5 h
3.8 Notify SP0 to perform post 1
Close HVV 103 "Deaerator Vent trip DFT line up.
Iso" (162 ft-TB by DFT).
j 2
Close HDV 47 "SA Heater to Deaerator Level Control Iso" (162 ft TB by DFT).
3 Close HDV 48 "5B Heater to Deaerator level Control Iso" i
O t
AP 660
- REV 10 PAGE 7 of.17--
-TT s
O i
t BLANK PAGE l
t l
l l
O AP-660 REV 10 PAGE 8 of 17 TT L
. - -.... _ _ _ -. _ - - = - = - - -..
h l
I t
L.0 f0LL0thDP ACTIONS (CONT'D) 8.C.IlQM DETAltS l
3.9 Ensure Main Turbine drain e Notify SPO to perform the followin9 i
isolation valves are open.
l Open-TDV 104 "TDV 5 Iso" l
_. Open TDV 105 "TDV-10 Iso" l
i 3.10 Ensure Main Turbine oil pumps are running.
TBP 8 TBP 2-f r
3.11 __
Ensure MSR high PRESS.
l bundle: isolation valves MSV 29 are closed, j
_ MSV 30 MSV 31 i
MSV 32 3,12._._ Ensure Main Turbine drain valves are open.
__ 1DV 2 TDV 6 i
TDV 1 TDV-5 I
TDV 3 TDV-7
_ TDV 4 TDV 9 i
TDV 10 TDV 8 i
O i
AP 660 REY 10 PAGE 9 of 17 TT i
..-..........~.,-....,__.........,_...-.m.
.. = _ _..-.-.
f i
l i
i l
4 5
9 f
9 i
1 r
i r
f i
J BLANK PAGE t
i I
i AP 660 REV 10 PAGE 10 of 17 TT t
I
_ _ _ _ _. _. _.. ~. _ _ -..
i r
i 1.9 FOLLOW-UP ACTIONS fCONT'D) j O
ACTIONS DETAILS
_j g
3.13,__ Notify Chemistry of 2 15%
Rx power change in any I hour time period.
-3.14,_ ' Align CD system for low I,__,$ elect both CDP 1A and CDP-1B-flow operation.
controllers to " HAND" and reduce demand to "0".
2.__ Ensure only 1 CDP is running.
1 3 Close CD Htr outlet valves +
CDV 44--
t
,__ CDV 43 4
Maintain CD system PRESS between 90 and 250 psig.
5.__ Throttle _CDV 242 to maintain DFT level between 8 and 11 ft.
i i
o f
-AP6601 REV 10-PAGE ll.of 17,:
TT
-,-+..,.._..w,-
._...._..,..,...____-_,.-.,_,...____.-_.___._..I
I i
f BLANK PAGE 9
O AP 660-REV 10 PAGE 12 of 17 TT
i Lg FOLLOW-UP ACTIONS fCONT'0)
ACTIONS DETAILS 3.15 _ IE MFW is feeding both.
I _ _ Notify PP0'to obtain keys 11, 74 i
- OTSGs, and 75 from Control Room.
M align MFW for reduced flow operation.
2 Notify PPO to select EFIC MFW.
isolation pump trip key switches to L
"BOTH":
"EFIC CHANNEL A MAIN FW ISOLATION MAIN FV PUMP TRIP" (CRD room, Aux Relay Cab RR3A) l "EFIC CHANNEL B MAIN FW ISOLATION MAIN FW PUMP TRIP"-
-(B EFIC-room, Aux Relay Cab RR5B1) 3,_., M EFIC MFW isolation pump trip key switches are selected to "BOTH",
M ensure FWV-28 is open..
4 Ensure one MFWP is tripped:
FWP-2A FWP 2B 5 Open valves associated with tripped MFWP:
FWP-2A FWP-28
_ FWV-18 FWV-19 TDV TDV-23 TDV 16 TDV-30 TDV 32 TDV-33
~
AP 660
. REY.10 PAGE 13-of'17 TT
t t
[;
l f
1 BLANK PAGE k
t l
l l
s AP 660 REV 10 PAGE 14 of.17 TT 1--
-~. - - -
l a FOLLOW UP ACTIONS (CONT'D)
(
)
ACTIONS QUAILS 3.16 isolate MSR high PRESS and o Notify SP0 to select "CLOSE" on LP bundle vents to FWHEs.
HDCP-1 "MSR REHEATER DRAINS CONTROL PANEL" (119 ft TB) for the following valves:
HDV 539 HDV 540
_ HDV 543 HDV-544
_ HDV-547 HDV-548 HDV-551 HDV 552 3.17,__
lsolate MSR high PRESS
- Notify SP0 to close MSR high PRESS drain tank drains to drain tank drains to FWHEs:
FWHEs.
HDV-1 "A MSR HP Drain Tank to FWHE-3A Control Iso" (119 ft TB
(
above FWHE-3A) u.-
~
- HDV-3 "B MSR HP Drain Tank to FWHE 3A Control Iso" (119 ft TB above FWtiE-3A)
- HDV 5 "C MSR HP Drain Tank to FWHE-3A Control Iso" (119 ft TB above FWHE-3B)
_ HDV-7 "D MSR HP Drain Tank to FWHE-3A Control Iso" (119 ft TB aaove FWHE-38)
L)
AP-660 REV 10 PAGE 15 of 17 TT
O l
i l
l BLANK PAGE O
O AP 660 REV 10 PAGE 16 of 17 TT
I L.0 FOLLOW UP ACTIONS (CONT'D)
)
ACTIONS DETAILS 3.18 E at any tima, the "TURB 1 _ _ Ensure TBM 1-in " AUTO".
i Al ZERO SPEED" alarm is actuated.
2 __. Ensure TBP 6 is running.
l M ensure Main Turbine
- t goes on the Turning Gear.
3 E Turning Gear does $ 1 Auto
- engage, IllG select TBM 1 to " MAN" and notify SP0 to engage Turning i
Gear.
i 3.19 ___. E turbine was tripped due i
to' exceeding condenser l
vacuum limits,
)
111G notify Systems i
Engineering to ' valuate per vendor. Instructions.
3.20,__, E plant shutdown is
- required, lHLN GO TO OP 208, Plant Snutdown, beginning with Step 3.2 E plant shutdown is @l
- required, ltiG GO TO OP-203, Plant Startup, beginning with Step 3.2 4