ML20203J857

From kanterella
Jump to navigation Jump to search
Rev 1 to AP-604, Waterbox Tube Failure
ML20203J857
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/10/1997
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20203J799 List:
References
AP-604, NUDOCS 9712220118
Download: ML20203J857 (25)


Text

_a 4

ew.

lh FORMATION w

. ~.

{

WTT pgy AP 604 N

WATER 80X TU8E FAILURE 1.0 ENTRY CONDITlff(}

jf. in Mode I through 4, 6110 cation conduct., ay at CDP discharge (CE 2, CE-3) is verified to be

> 10 pmho/cc, ltiW use this procedure.

20 IMMEDIATE ACTA 0fil

[

uny There are no imediate actions for this procedure.

OU f

r Approved by MNPO _c/ N Date/2 /0 /97

,-- s

( j)

(SIGNATI$EONfiLE) s,

'AP 604 PAGE 1 of 25 WTF 9712220118 971211 I

PDR ADOCK 05000302' l

P PDR '

O BLANK PAGE

' O AP-604 REV 01 PAGE 2 of 25 WTF l

l

_ 3.0 F0LLOW-UP ACJ1QE1 t

ACTIONS

-DETAILS 5

3.1. ~

Notify Chemistry, e Notify Chemistry to perform _the following

_ Determine affected CWP.

Notify the control. room if Condensate Demin outlet-(CE-5' cation conductivity

> 1 pmho/cc.

e 3.2 Notify personnel of plant STA conditions, o

Plant Operators P

e SSOD (evaluate plant conditions for entry into the Emergency Plan) 3.3 Isolate condensate e Notify SP0 to fail closed CDV-88 rejection flow to CDT-1

" Condensate Reject to CDT-1" (95 ft TB behind Atmospheric Drain Tank).

4 J

O AP-604-REV _: 01_.

FAGE 3-of 25 WTF

.. ~

e

..s

-- -a r

. =

4

+

~,m..

-a.

+.s n -

aa..

a saa.u-,+

e

=

'b O

I BLANK PAGE e

i I

i l

AP 604 REV 01 PAGE 4 of 25 WTF

3;0 FOLLOW-UP ACTIONS (CONT'0)

ACTIONS:

DETAILS.

3.4 Verify Condensato Demins e Notify SPO to verify the following-are not bypassed, are closed at the " Condensate Demineralizer Control Panel":

CXV 5 "Demin Bypass Valve" CXV-12 "Demin Bypass Valve"

_ Jf Condensate Demins are 1

Adjust CX-15-DPI-B1 knob to "15" bypassed.

(95 TB CXCP-1 Panel).

lliG notify SP0 to attempt to close all condensate 2

Adjust CX 16 DPI-B2 knob to "15" Demin bypass valves.

(95 TB CXCP-1 Panel).

3 Depress " SYSTEM HI D/P ALARM CXV-12F BYPASS VALVE B2" " RESET" push button (95 TB CXCP,

Panel).

4 Depress " SYSTEM HI D/P ALARM CXV-5F BYPASS VALVE Bl" " RESET" Os push button (95 TB CXCP-1 Panel).

5 Adjust CX-15 DPI-B1 knob to "0" (95 TB CXCP-1 Panel).

6 Adjust CX-15-DPI-B2 knob to "0" (95 TB CXCP 1 Panel).

3,5 Notify SP0 to ensure.

I __ Obtain most efficient Condensate proper Condensate Demins Demin alignment from chemistry, are in service.

2 Ensure proper number of condensate demins are in service for power level.

.AP-608 REV 01-PAGE 5 of 25

. WTF-

,qr p.

..igy

.--ag y

y y

y.

4,1,,+,s

E

't I

l l

BLANK PAGE

!~

I l

l l

\\

AP 604 REV 01 PAGE 6 of 25 WTF i

6 m

-.c w

- +,

,..-r-

... -.y w

m w- = ~ - -

-r-=e

3.0 FOLLOW-UP ACTIONS (CONT'DJ m

(

)

ACTIONS DETAILS 3.6 ___

1E at any time, Condensate 1 Stop the affected CWP:

Demin outlet (CE-5) cation conductivity is

> 1 smho/cc, CWP-1A IB1H stop the affected CWP and GO TO Step 3.12 in CWP-1B this procedure.

CWP-lC CWP-lD 2

GO TO Step 3.12 in this procedure.

3.7 JF a power reduction is

  • CONCURRENTLY PERFORM AP-510, Rapid
required, Power Reduction, beginning with Step 1818 start a rapid power 3.1 reduction at > 5%/ min.

)

See Table 1 3.8 lE the tube leak is in a WHEN Rx power is < 45%,

hotwell with only one IHIE trip the turbine and inservice waterbox, CONCURRENTLY PERFORM AP-660, AND turbine is operating, Turbine Trip, beginning with THEN reduce Rx power to Step 2.1 less than the anticipatory setpoint and trip the

turbine, i

i

'y _,.!

AP-604 REV 01 PAGE 7 of 25 WTF

e

~

Applicable carry-over steps:

(V7 3.6 IE con 'ensate Demin outlet cation conductivity is > 1 ftmho/ce...

L O

%.J

-~

k()

AP-604 REV 01 PAGE 8 of 25 WTF

)

L.

-1 0 FOLLOW-UP ACTIONS'(CONT'D)-

(

ACTIONS DETAILS 3.9-11 at any time, the.

1

-Ensure Rx power and Turbine are affected CWP can be-operating within CWP operation.

stopped,

. guidelines.

JH Q stop the affected CWP.

See Table 1 2 Stop the affected CWP:

CWP-1A CWP-1B CWP-lC CWP-ID.

3 Notify SP0 to close waterbox vacuum isolation valve for the affected CWP:

ARV-47 "A Waterbox Vacuum Outlet 4. g' Iso" (119 ft TB north of A Waterbox)

ARV-46 "B Waterbox Vacuum Outlet Iso" (119 ft TB north of B Waterbox)

ARV-45 "C Waterbox Vacuum Outlet Iso" (119 f t TB north of C Waterbox)

ARV-44 "D Waterbox Vacuum Outlet Iso" (119 ft TB north of D Waterbox) 4 Notify Chemistry of CWP shutdown.

p.Q AP-604-REV 01 PAGE 9 of 25 WTF i

- ~

-1 i

Applicable carry-over steps:

3.6 E Condensate Demin outlet cation conductivity.is-> l-';nho/cc...

3.9. E the affected CWP can be stopped,1 HEN stop the affected CWP..

i i

t,.

O t

e i

O

AP 604 REV 01 PAGE.10 of 25 WTF um

.e

-gyf"-

VTD4----

vv 'ef

Pr re br r'[

Yz-T--=r'so* - * 'y

-m r*'a'

T "D'

a-'*

'e w

ur'-*w' ws er-Y N-N

'" * *'-'1'

i 3.0 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS Opening waterbox vacuum breakers can potentially create-a vacuum leak when the affected CWP is stopped.

F 3.10 if at any time, the affected CWP is stopped, ARV-57

. Ill[N open affected CWP-l' Waterbox Vacuum Breaker ARV-56 Valves.

ARV-55 CWP-1B ARV-54 ARV-53 CWP-lC ARV-52

'O ARV-51

__ CWP-ID ARV-50 3,11 _ WHEN all of the following conditions exist for the affected CWP:

._ CWP is stopped Waterbox vacuum

~

isolation valve is closed Waterbox Vacuum Breaker valves are open THEN GO TO OP-204, Power Operations, Section 4.3, 1001. To 20!e Power

Decrease,

~O AP-604 REV 01 PAGE 11 of 25 WTF T

eT

. ~..

}'

o T

o BLANK-PAGE O

AP-604 REV 01 PAGE 12 of 25 WTF

3.0 FOLLOW-UP ACTIONS JCONT'D)

ACTIONS DETAILS STATUS Condensate Domin outlet (CE-5) cation conductivity.is > 1 pmho/ce,

'l 3.12 If the Rx is NE tripped, 111@ manually trip the Rx,

-and CONCURRENTLY PERFORM

!0P-02, Vital System Status Verification, beginning with Step 2.1 3.13 Initiate EFIC.

I Depress "EFW INITIATE" push buttons on EFIC channels A and B.

2 Ensure at least one EFP running:

V EFP-1 EFP-2 3

Ensure level in available OTSGs is at or trending toward required level.

[ Rule 3, EFW Control)

)

~

AP-604 REV 01 PAGE 13 of 25 WTF

A q

--F4'+

aAm&

L' g)i;.

[

BLANK PAGE

. OV O

AP-604 REV 0]

PAGE 14 of 25 WTF

_~.

3.0 FOLLOW-UP ACTIONS'(CONT'D)-

i -,

(

ACTIONS DETAILS 3.14._ Initiate MFLI for both 1 Depress " MAIN FEED ISOLATION" OTSGs.

pushbuttons on EFIC channels A and B for both OTSGs, 2 Select MBV to " MAN" and select FW isolation valves to "CLOSE" for'both OTSGs:

FW Valve A OTSG B OTSG LLBV-FWV-31 FWV-32 MBV toggle

" MAN"

" MAN" MBV FWV-30 FWV-29 SUBV FWV-36

._,FWV-33 Cross-Tie FWV-28 FWV-28 Suction FWV-14 FWV-15 0

.. 3 Ensure ooth MFWPs tripped:

A OTSG B OTSG FWP 2A FWP-2B 4

O AP-604 REV 01 PAGE 15 of 25 WTF

t A

BLANK PAGE O

l l

. O AP 604 REV 01 PAGE 16 of 25 WTF

A l

3.0 FOLLOW UP ACTIONS-(CONT'D)

ACTIONS

-DETAILS

_ 3.15:

Stop both MFWBPs..

1 Start both-MFWBP aux oil pumps:

l FWP-6A

'FWP 6B

-2 Stop both MFWBPs:

FWP-1A

_ FWP-1B i

3.16 _., Isolate waterbox vacuum 1 Notify SP0 to close waterbox vacuum for the affected CWP.

isolation valve for the affected CWP:

ARV 47 "A Waterbox Vacuum Outlet Iso" (119 ft TB north of A Waterbox)

ARV-46 "B Waterbox Vacuum Outlet Iso" (119 ft TB north of B Waterbox)

ARV-45 "C Waterbox Vacuum Outlet Iso" (119 ft TB north of C Waterbox) 4 ARV-44 "D Waterbox Vacuum Outlet

-~

Iso" (119 ft TB north of D Waterbox) 2 __ Notify Chemistry of CWP shutdown.

AP-604 REV 01 PAGE 17 of 25 WTF

~.

I

~*+

I o

i BLANK PAGE 1

AP-604 REV 01 PAGE 18 of 25 WTF h

~1 4-<-

'3.0 FOLLOW UP: ACTIONS (CONT'D)'

'(f

-ACTIONS DETAILS 3.17

.Open-;the:affected Waterbox Vacuum Bretker Valves.

ARV-57:

CWP-1A ARV 56

_ARV-55 CWP-1B-ARV 54 ARV-53 CWP-lC ARV 52 ARV-51 CWP-lD ARV __

i 3.18 :.___ -If at any time EFT-2 Unlock and open CDV-103 "CDT-1

(g_

level is s 8.5 ft, to EFP Suction" (119 ft Berm by-1

(,,/

DJEU notify SP0 to CDT-1).

cross tie CDT-1 and EFT-2 Ensure CDV-290 "CDT 1 to EFP Suction" is open (119 ft Berm in covered valve box by-FST-1A).

i 1

AP-604 REV 01 PAGE 19 of 25 WTF J

Applicable carry over _ steps:

[)h 3.18 E EFT 2 level'is-s 8.5 ft, IBEN cross tie CDT-1 and EFT-2...

m f

f v

e u

l AP 604 REV 01 PAGE 20 of 25 WTF

L3.0'F0LLOW-UP ACTIONS (CONT'D1 ACTIONi;

DETAILS-3.19 H at.any time, makeup to-1
Ensure CDV-102 "CDT-1 Lower Iso" CDT 1 is required,

~

closed-(119 ft Berm by CDT-1).:

-JBIB notify SPD to makeup, to CUT 1-2' Ensure CDV-236 "CDT 1 Upper Iso" open (119 ft Berm by CDT-1).

3 Isolate: Condenser vacuum from DW loads downstream of DWV-346:

Close CDV-149 "DW-Makeupito Hotwell Control Bypass # (95 it TB by C inlet waterbox).

Close CDV-147 "DW Makedg to hotwell Control Inlet Iso" (95 ft TB by C inlet waterbox).

4 Select DWV-346 "TB DW Header Iso" control switch to-"CLOSE" (95 ft TB Demin Water Panel).

5 Open DW7-377 "DWV-346 Bypass" O.

(95 ft TB southwest-stairwell)-

until pressu,*e equalizes around Dwy.346 6

Select DWV-346 "TB DW Header Iso" control switch to "0 PEN" and verify DWV-346 opens (95 ft TB Demin Water Panel).

7_

Open CDV-147 "DW Makeup to Hotwell Control Inlet Iso" (95 ft TB by C inlet waterbox).

B Close;DWV-377 "DWV-346 Bypass" i

(95 ft TB southwest stairwell).

9 Select DWV-346 "TB DW Header Iso" control. switch to "AUT0" (95 ft TB Demin Water Panel).

10 _ Throttle open CDV-ll2 "DW-Makeup to CDT-1" (95 ft TB by-MFWBPs),

f}

~V=

AP-604 REV 01-PAGE 21 of 15 -

WTF i-

9 Applicable carry-over steps:

('}

3.18 E EFT-2 level is s 8.5 ft, MB cross tie LDT-1 and EFT-2...

x,y 3.19 E makeup to CDT-1 is required, Eh makeup to CDT-1...

4 lh L..)

/N, I

J

'u J AP-604 REV 01 PAGE 22 of 25 WTF

..~_--.-.

~

3.0 F0LLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS 3.20?

IStop'any hotwell fills, e Notify SPO-to perform the following:

_ Fail closed CDV-87 "CDT-1 Makeup to Hotwell" (95 ft TB by C: inlet waterbox)

Fail closed CDV-ll3 "DW Makeup f

to Hotwell Control" (95 ft TB by C inlet waterbox)

Close CDV-149 " Makeup to-Hotwell Control Bypass" (95 ft TB by C' inlat waterbox) 3.21 Notify Chemistry to make preparations for continuous condensste release.

3,22 _. EXIT this procedure.

r E

d

[ ]

t

'AP-604.

REV 01 PAGE 23 of 25 WTF.

l d.

O 1

t BLANK PAGE O

t I(

i AP-604 REV 01 PAGE 24 of 25 WTF i

.......~

1

.j 1

i s;

O cwe ce 84" t4e" e er ievei 1

from 4 to 3 CWPs

<85%

i Table 1:

From 3 to 2 CWPs

<60%-

-CWP Operation =

(one in each hotwell)1

Guidelines =

From 3 to 2 CWPs-

<45%.

c;'

(both in same hotwell)

J t

1 1

1 v

O x

. i 5

1

AP. _60dL REV 01

-lPAGE 25 of 25 (LAST PAGE)

WTF

-