ML20203J819

From kanterella
Jump to navigation Jump to search
Rev 1 to AP-430, Loss of Control Room Alarms
ML20203J819
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/10/1997
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20203J799 List:
References
AP-430, NUDOCS 9712220105
Download: ML20203J819 (21)


Text

LNFO RMCM cu v

LOCRA NkdV OY '

AP-430 p--_.

~'

LOSS OF CONTROL ROOM ALARMS 1.0 ENTRY CONDITIONS J1 any of the following conditions exist:

e An unplanned sustained loss of the Plant Computer e

Loss of the Annunciator CRT e

loss of the MCB annunciator windows JEffj use this procedure.

2.0 IMMEDIATE ACTIONS MTI There are no immediate actions for this procedure.

A Approved by MNP0

/f Date/) //O/97 e

~'-

(SIGNATURE %N FILE)

AP-430 PAGE 1 of 21 LOCRA 9712220105 971211 PDR ADOCK 05000302 p

PDR

-as---

a.n-os+-eesm n,<

un 4aa Amei-6 4m2n-e.

6 4 ma-4-e k_,

Aasam-me'L-+,

y.9.1A A4..n J

- is y f-p

-Mem AAS.4.4-We Ae.

JW4mK. A s%Rwn 54e4 e M. oM sg sa s-4 4w 4 eA.&J4e n

4' j

1

+

b

\\

d S

h f-BLANK PAGE 4M 4

i l

l l-I t'

f

= AP 430-REV O!

PAGE-2 0F 21 LOCRA t

i' e

-em-=

ea--m vr-m,-

r-, n w,-,-

v-w,--

,-w---

~

m e

-.r-

- = --

.a

^

i 1

l

-3.0~

FOLLOW UP ACTIONS-s ACTIONS:

DETAILS:

3.l~ __. Notify personnel of plant.

STA conditions.

-j e

SS00 (to evaluate plant-conditions for potential entry.

intoithe Emergency P1an)-

3.2 Increase equipment Increase monitoring of MCB monitoring.-

instrumentation.

o Notify plant operators to increase equipment monitoring and assign additional personnel as required.

3.3-Suspend maintenance and

. operational activities

-O that could result in a h

plant transient.

3.4 E Annunciator System is e H all of the following are available, available, THEN GO TO Step 3.23 IliG the Annunciator System is available:

Annunciator CRT MCB annunciator windows

.,q -

.:V AP-4301 REV 01 PAGE 3 0F 21 I

LOCRA

s O

BLANK PAGE O

+

0 0

AP 430 REV 0'1-PAGE 4 0F 21 LOCRA

..____.__._..._.____._m_

I 3.0 FOLLOW-UP ACTIONS (CONT'D) j f

' ACTIONS DETAILS 3.5 Ensure power wailable to e Ensure the following lights are annunciator system, illuminated on " VITAL BUS C VBDP 5 CIRCULI STATUS PANEL":

Status Lamp 16 "6NNUNCIATOR MONITOR ANNUNCIAIOR ALARM TYPER"

_ Status Lamp 28 " ANNUNCIATOR SYSTEM" e

_ Notify SP0 to ensure closed DPDP 48 8 " FIRE BELL FOR SYSTEM 10 AND SYSTEM 17" (124 ft CC CRD Room).

1 4

3.6 IE Rochester Events

  • Ensure all of the following in

-Recorder is @l available, Annunciator Cabinet 1:

.T M ensure proper O

annunciator power supply Test switch 51 is "0 PEN" i

alignment.

Power switch S2 ir"0N" Power switch S3 is"0N" Test switch S4 is"0 PEN" Voltage = 120 volts t

3.7 11 Annunciator CRT is @l Monitor alarms using alarm tyoer available, (behind MCB),

a@ alternate alarm verifications are e

1[ alarm typer is not available, available.

Itim depress "N0 PRINT" on the IHQ monitor alternate Rochester Events Recorder to alarm indications and enable installed printer.

t G0.T0 Step 3.22 j

o LAP 430 RrV 01 PAGE S OF 21 LOCRA

/9 v

I fi 1

i BLANK PAGE O

4 4

)

i O

AP 430 REV 01.

PAGE 6 0F 2]

LOCRA

~ 3.0 FOLLOW UP ACTIONS (C(#EDJ ACTIONS DETAILS 3.8 Take compensatory actions.

Maintain plant in steady state i

condition.

Clear the Control Room of all non essential personnel.

Increase monitoring frequency of plant computer, if available, e

Notify Maintenance personnel.

3.9 Monitor Radiation e Observe individual monitors for i

Monitoring Panel, alarm conditions.

See AR 403, PSA H Annunciator Response.

i 3.10,_,,, if at any time, applicable atmospheric radiation RM Al monitor "HIGH ALARM" is lit.

RM A2 JEtj CONCURRENTLY PERFORM AP 250. Radiation Monitor RM A3 Actuation beginning with Step-3.1 RM A4 RM A5 O

AP-430 REV 01.

PAGE 7 0F 21 LOCRA i

l y

es-.-

1 r--- w -

f rs er

-++v-m n-i-u.~v--

,em'-ey v

--w-~+

.---wv w--r--

-ww

Applicable carry over steps:

'~

j

')

3.10 1[ Lqy atmospheric RM actuates, IBM CONrVRRENTLY PERFORM AP 250...

v h

L/

r~h AP 430 REV 01 PAGE 8 Of 21 LOCRA

t l

3.0 FOLLOW UP ACTIONS (CONT'D)

- ACTIONS Q[l&lui 3.11 Stop radioactive releases.

Liquid-releases e _ WGDT releases l

e RB Purge j

i I

3.12 Place the CC ventilation 1

Notify Chemi.try personnel.

in recire.

2 Select both " CONTROL COMPLEX HVAC-ISOLATE / RESET" switches to "150".

t 3 Verify closed:

AHD 12 AHD 2E AHD-12D AHD-lc AHD 2C AHD lE 4 _

Verify open AHD 3 5

_. If AHF-20A and AHF-20B fans are stopped.

IR Q ensure auxiliary fans are stopped:

+

AHF-44A AHF 44B AHF-30 F

O AP 430 REV_01-PAGE 9 0F.21 LOCRA i

.--3

-4 He..

g-t m-

$%ig wy-.mp 7

ivM-r p

y.t,*-w' e,-.g.yF Mi F

4

*#NW#

W' Y**D' ' " '

Y*F844W---

D'*v V

Applicable carry over steps:

(~N, 3.10 E An.y atmospheric RM actuates, liiti CONCURRENTLY PERFORM AP 250...

Q_.)

v e4*

/%

\\

l s_/

AP-430 REV 01 PAGE 10 0F 21 l

LOCRA

6 3.0 FOLLOW UP ACTIONS (CONT'DJ.

l l

f ACTIONS DETAILS 3.13 E core cooling is via DHI

  • Ensure the following parameters are l
Systrm, acceptable:

111[# ensure proper DHR parameters.

RCS PRESS i

_ RCS TEMP RCS level I

DH Flow See OP 1038, Plant Operating Curves 1

3.14 _ Ensure proper valve e

H RCS PRESS is 2 284 psig, 4

positions

)ased on RCS Ili[N ensure DHV 91 closed.

PRESS.

o E RCS PRESS is 2-200 psig, i

JE N ensure proper position of RCV 53 for plant conditions.

O i

i 3.15 _ E at any time, IA PRESS s 95 psig, SAP 1A.

JE B ensure proper compressor operation.

SAP-1B

._ IAP-1A

_ IAP-1B 3.16

_ E at any time. IA PRESS

< 90 psig, i

Ili[h CONCURRENTLY PERFORM-AP 470, loss of instrument Air, beginning with Step-

-3.1 f

AP 430 REV 01 PAGE 11 0F 21 LOCRA

. + -...,... -

..----,,.n..-.

,---.,,ns c

-.,,-n

,-,......-a

,w.-,.-.~,,r..-,-,.n-..,n..-

~ _ _

Applicable carry over steps:

3.10 If 102 atmospheric RM actuates, If D CONCURRENTLY PERFORM AP 250...

3.15 If IA PRESS s 95 psig, 1] E ensure proper compressor operation.

1 3.16 - 1[ IA PRESS s 90 psig. Ilg CONCURRENTLY PERFORM AP 470...

i i

l t

t i

I r

I i

?

1 O

i 4

I t

s 1

h

'I h

[

-- AP-430.

- REV.01 '.

PAGE 12 0F 21 LOCRA r

'r

,..,--.ri,

.-..--u.a.

.,,....,., -, ~,,

..--~~,-.,a

..a..'

n

..n-

-.. ~, -,,.

,-,-,e

3.0 FOLLOW UP ACTIONS (CONT'D)

ACTIONS

~ DETAILS 3.17 1[ at any time, flooding a Notify SPO to monitor TB for is detected, flooding.

1H B CONCURRENTLY PERFORM-AP-1050, flooding, beginning with Step 3.1 3.18 1.E at any time, ICS power

-l

__ If the Rx is critical, is @l available.

IliG manually trip the Rx and A@ primary to secondary CONCURRENTLY PERFORM E0P 02, heat transfer is in Vital System Status-

progress, Verification, beginning with IB M trip MFWPs and Step 2.1 control OTSG parameters.

2 Trip the MFWPs:

_ FWP 2A FWP 28 3 Ensure EFWPs start and control flow:

EFP 1 EFP 2

[ Rule 3. EFW Control) 4 Ensure ADVs control 0TSG PRESS:

MSV 25 MSV-26 I.

t v

AP 430 REV 01 PAGE 13 0F 21 LOCRA

-. - -. = -. -

- ~

Applicable carry over steps:

3.10 E ADX atmospheric RM actuates, M CONCURRENTLY PERFORM AP 250...

3.15 E IA PRESS s 95.psig, M ensure proper compressor operation.

3.16 H IA PRESS $ 90 psig,- M CONCURRENTLY PERFORM AP 470...

3.17 H flooding detected, M CONCURRENTLY PERFORM AP-1050...

3.18 H ICS power is @l available AND OTSG cooling M trip MFWPs...

9 e

o O

Y F

I i

l AP 430 REV 01 PAGE 14 0F 21 LOCRA

3.0 FOLLOW-UP ACTIONS ICONT'DJ ACTIONS DETAILS 3.19

_ - E at any time, NNI-X e Observe "X PWR ON" status lit, power is M01 available, M CONCURRENTLY PERFORM AP 581, Loss of NNI-X.

beginning with Step 3.1 3.20 ___ E at any time, NNI Y

  • Observe "Y PWR ON" status lit, power is E01 available, M CONCURRENTLY PERFORM AP 582 Loss of NNI-Y, beginning with Step 3.1 3.21,__. E at any time, SW Surge lank level < 7 ft, M CONCURRENTLY PERFORM AP 330. Loss of Nuclear O

Service Cooling, beginning with Step 3.1 3.22 _ E Plant Computer alarming capabilities are available, THEN GO TO Step 3.25 G

_(

AP 430 REV 01.

PAGE 15 0F 21 LOCRA

Applicable carry over steps:

}

3.10 E (qr atmospheric RM actuates, M CONCURRENTLY PERFORM AP 250...

3.15 E lA PRESS s 95 psig. M ensure proper compressor operation.

3.16 E lA PRESS s 90 psig, E CONCURRENTLY PERFORM AP 470...

3.17 E flooding detected, M CONCURRENTLY PERFORM AP 1050 l

3.18 E ICS power is @l available A!iD OTSG cooling, E trip MFWPs...

3.19 E NNI X power lost, M CONCURRENTLY PERFORM AP 581...

3.20 E NN!-Y power lost, M CONCURRENTLY PERFORM AP 582...

3.21 E SW surge tank < 7 ft, M CONCURRENTLY PERFORM AP-330..,

t O

l

-AP 430 REV 01 PAGE-16 Of 21 LOCRA

. ~. - _ _ _ _,

, _.. - ~

i 3.0 FOLLOW-UP ACTIONS (CONT'D1 l

O AC, IONS DETAILS I

l

}

STATUS i

Plant computer is not available.

3.23 1E plant computer is 801 Ensure all breakers on VBDP-7 available, are closed.-

1818 ensure power available to plant computer.

j 3.24 ___ Take compensatory actions.-

-Establish and raintain s 100% Rx power as indicated on MCD instrumentation.

3

[

Suspend all activities that rely on planticomputer data.

~

  • CONCURRENTLY PERFORM o'ne of-the following:

t SP 300, Operating Daily e

Surveillance Log, applicable steps of Section 4.2, Special Surveillance Frequency.

SP 301, Shutdown Daily Surveillance Log, applicable steps of Section 4.2, Special Surveillance Frequency.

  • ___ Notify Nuclear Computer and Controls Specialist.

t AP 430 REV 01.

PAGE 17 0F 21 LOCRA

., _, _. - - _. _ - -. ~. _ _ _ _. _ _, -. _ _ _ _ _ _ _. _ - _ _ _.

~.

Applicable carry over steps:

3.10 if ADX atmospheric RM actuates, IR B CONCURRENTLY PERFORM AP 250...

3.15 11 1A PRESS s 95 psig, 1110 ensure proper compressor operation.

3.16 11 IA PRESS s 90 psig, IB M CONCURRENTLY PERFORM AP 470...

3.17 11 flooding detected, IBM CONCURRENTLY PERFORM AP-1050...

3.18 1[ ICS power is 11Q1 available 6!fD OTSG cooling, IHG trip MFWPs...

3.19 11 NNI X power lost, Ilj@ CONCURRENTLY PERFORM AP 581...

3.20 11 NNI Y power lost, IBM CONCURRENTLY PERFORM AP 582...

3.21 1[ SW surge tank < 7 ft, IHG CONCURRENTLY PERFORM AP 330...

I O

f d'

i a

O AP 430 REV 01 PAGE 18 0F:21 LOCRA

_.~

.4 3.0 FOLLOW UP ACTIONS (CONT'D) l ACTIONS DETAILS r

3.25 _,_, 1012 maintenance IE MCB annunciator windows, r

activities are complete, QB Rochester Events Recorder was f

IllB ensure proper post lost,-

maintenance testing.

IllB request applicable portions of PMe104, Operability and Functional Check of the Events t

Recorder and Annunciator System, i

be performed (as determined by MNPO and Electrical Supervisor).

1 o-If plant computer was lost, 1118 request Nuclear Computer and Controls Specialist to verify operability of applicable portions of the plant computer alarms (as determined by HNPO l

and Nuclear Computer and Controls Specialist).

t O

l l

I t

[

t i

AP 430 REV 01 PAGE 19 0F 21 LOCRA L

B Applicable carry over steps:

l 3.10 E Lqr atmospheric RM actuates, M CONCURRENTLY PERFORM AP 250...

3.15 E lA PRESS 5 95 psig, M ensure proper compressor operation.

3.16 _ E IA PRESS s 90 psig, M CONCURRENTLY PERFORM AP 470...

l 3.17 E flooding detected, M CONCURRENTLY PERFORM AP 1050...

3.18 H 105 power is (101 available mfd OTSG cooling, M trip MFWPs...

3.19 E NNI X power lost, M CONCURRENTLY PERFORM AP 581...

i 3.20 E NN!-Y power lost, M CONCURRENTLY PERFORM AP 582...

3.21 E SW surge tank < 7 ft, M CONCURRENTLY PERFORM AP-330...

f h

,-t O

1 5

1 0

AP 430 REV 01 PAGE 20 0F 21 LOCRA-

a 3.0 FOLLOW UP ACTIONS (C0f @

7,

(

)

ACTIONS DETAILS v

3.26 11 CC ventilation was 1

Select " CONTROL COMPLEX HVAC placed in recire, ISOLATE / RESET" switches to 1101 restore CC

" RESET".

ventilation to normal.

2 Ensure proper damper repositioning:

Open AHD 17 AHD 2C AHD 22

_ _ AHD 2E AHD 12 kHD lC AHD 12D AHD ll Closed AHD 3 x

3 Ensure only one train of CC ventilation operating:

p A Train B Train AHF-17A AHF-17B AHF-19A AHF-198 4 Start one of the following trains:

A Train B Train

._ AHf-20A

._ AHf 20B AHf 44A AHF-44B AHF-30

__ AN -30 5._ Ensure proper flow of

= 35,000 scfm on AH 32-flR, Channel A.

3.27,_ EXIT this procedure.

7~O AP 430 REV 01 PAGE 21 Of 21 (LAST PAGE)

LOCRA