Rev 6 to AP-545, Plant Runback
ML20203J846
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/10/1997
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20203J799 List:
References
AP-545, NUDOCS 9712220115
Download: ML20203J846 (23)


Text

-

INFORMATIO \\

QQy PR AP 545 (D

PLANT Rl48ACK 1.0 ENTRY COND1110NS 1[ LO.y of the following conditions exist:

e Asymmetric fault e loss of 1 RCP

?

e loss of 1 MFWP e loss of 1 MFWBP 111G use this procedure.

,O V

f$k"*$oMEI>$o$h O\\

Approved by MNPO Date12/l'/f7 U

(SIGNATV/tONFILE)

AP 545 PAGE 1 of 23 PR

- - =

i

?

l i.

(

BLANK PAGE

[

t i

i i

1 i

i 3

i AP 545 REV 06 PAGE 2 of 23 PR l

t

LO IMMEDIATE ACILOM

(_)

ACl10M DETAILS 2.1 Ensure plant runback in progress.

2.2 If 1 MfWP was lost,

  • _ Ensure FWV-28 is opening.

ItiW ensure proper FW valve positions.

  • _ Ensure FWV-29 is closing.
  • _ Ensure FWV 30 is closing.

2.3 _ 1[ l MfWBP trips at > 75%

Rx power, l}iG trip 1 MfWP.

7-

\\

l

/~~

+

/

AP 545 REV 06 PAGE 3 of 23 PR

i t

O f

F r

4 f

BLANK PAGE 1

h AP-545 REV 06 PAGE 4 of 23 PR t

3.0 FOLLOWtJP_ACTifRS O

MIL 0ld DUALLE v

3.1 Notify personnel of plant e _ STA conditions.

Plant operators e

SS0D e

System Dispatcher 3.2 1[ loss of 1 RCP has

occurred, JJiG GO TO Step 3.11 in this procedure.

3.3 J1 > 1 asymmetric control

rod, JE G GO TO E0P-2, Vital

(^}

Systems Status

'xy Verification, beginning with Step 2.1 3.4 1[ ] asymmetric control rod.

THEN GO TO Step 3.21 in this procedure.

J AP 545 REV 06 PAGE 5 of 23 PR

t i

?

O f

1 i

r 4

BLANK PAGE L

O AP 545-REV 06 PAGE 6 of 23 pg

3.0 FOLLOW UP ACTigll5 (CONT'D)

?

ACTIONS DETAILS i

STATUS MFWP or MFW8P trip has occurred.

{

l t

3.5 Ensure RCS PRESS

  • Stabilize RCS PRESS between 2130 and stabilized.

2180 psig using:

PZR heaters PZR spray 3.6 " ~ Ensure Rx power stabilizes at or below required power RCPs Required Power level based on RCPs Running Level running.

O 3

$ 4 5'/,

3.7 Ensure vital plant PZR level

~~~~

parameters are approaching stability.

T v.

MS Hdr PRE 3S

-3.8 Maintain imbalance within

  • Adjust APSRs to maintain limits.

limits.

See OP-103D Withdrawal Limit Curves.

a h

AP 545 REV 06 PAGE 7 of 23 PR I

4 i

4 i

BLANK PAGE

(

S I

\\

l-AP-545 REV 06 PAGE 8 of 23 PR v

i l

l l

\\

3.0 FOLLOW UP ACTIONS (CONT'D)

()

ACTIONS DETAILS 3.9 if FWV 28 is open, 1

Notify PPO to obtain keys 11, 74 IBIN align EFIC MFW and 75 from Control Room.

isolation pump trip logic..

-2 Notify PPO to select EFIC MfW 4=

isolation pump trip key switches to "BOTH":

"EFIC CHANNEL A MAIN FW

' ISOLATION MAIN FW. PUMP TRIP" (CRD room, Aux Relay Cab RR3A)

"EFIC CHANNEL B MAIN FW ISOLATION MAIN FW PUMP TRIP" (B EFIC room, Aux Relay Cab RR5BI)-

3.10 ___ GO TO Step 3.27 in this procedure.

O 1

il 9

y AP.545 REV 06-PAGE 9 of 23 PR

f l

k

?

I h

P i

r i

I BLANK PAGE i

l i

l AP 545 REV 06 PAGE 10 of 23 PR 1

1 l

I yre.+--,-ow-wuW

-v-9 m-w

-e--

---w,+

+t-pr - +=-

    • w-,

w

,----v q

eev y

w w+ - - - - - -wew w-m-

&-e-cem,-- - +

-e--*==r'w-*-w-e-*-

ws

--- - - - ----=-

LO FOLLOW UP-ACTIONS (CONT'D)

[)

ACTIONS DETAILS c,

STATUS An RCP trip has occurred.

3.1 1,__. Ensure MFW flows are ratioing based on RCP combinntion.

3.12 __ Ensure RCS PRESS

  • Stabilize RCS PRESS between 2130 and stabilized.

2180 psig using:

__ PZR heaters PZR spray

,x

(

)

m.)

3.13.__ Ensure a 1tft oil pump has started on affected RCP.

3.14 __ Ensure Rx power stabilizes

< 75*..

3.15._, Ensure narrow range Tc is celected for the operating RCP in the affected loop.

See Table 1 i

,3

(

L_J AP-545 REV 06 PAGE 11 of 23 PR l

I i

t I

l i

a BLANK PAGE

(

i s

t'\\

AP 545

.REV 06' PAGL 12 of 23-PR i

-ww,c w

w.

~-

i

- 3.0 rati m.up AcTi m IcoNT'D).

l r

(

ACTIONS Qfl&lLS j

ji P

3.16 _,,,. Ensure Aic stabilizes between 5 and +5'F.

t i

t l

3.17 _,_ Ensure vital plant PZR level parameters.are approaching l

stability.

  • _,_ Ten j

l i

e

_,MS Hd? PRESS i

l i

3.18,__ Maintain imbalance within

  • Adjust _APSRs to maintain limitsi limits.

See'OP 1030, Withdrawal 1.imit:

Curves.

l o

i s

J 1

1 l

1 1

l 1

s

- AP 545 REV 06 PAGE:13 of 23-PR r

q t

3 r

m M' P ty tyy e Wma-tm

" wow - g gred,yym egry-e e'W e-

--e w+,mWc.

We*H.

-t-v=9 Parse s -+'.t

'8+t'Nt>-

vv^^+e' f r e *e w +

    • re*e'"

M k"#8*Na

'4 w---*T"

F Y

i I

BLANK PAGE

'i 1

j l

1 N

AP 545 REV 06 PAGE 14 of 23' PR

-i t

3.0 FOLLOW UP ACTIONS (CONTfD) j ACIM DETAILS 4

3.19

. Ensure narrow range RCS e _ H loop A is-in single RCP PRESS control is-selected operation.

to the loop in single RCP

&!fD RC 3 HS (NNI CAB 3) is operation.

selected to "RPS B",

]

Itifj perform the following:

Select PORV to " CLOSED".-

Select PZR spray toggle f

switch to

  • MANUAL".

4 i

]

Select PZR Htrs to HAND".

f

,_ _ Select RC 3 HS to "RPS A".

Restore PORV, PZR spray, and PZR Htrs to automatic.

  • _ E loop B is in single RCP i

operation.

A!!Q RC-3-HS (NNI CAB 3) is selected to "RPS A".

liff3 perform the following:

i Select PORV to " CLOSED".

~

Select PZR spray toggle switch to " MANUAL".

i Select PZR Htrs to " HAND".

Select RC 3 HS to "RPS B".

Restore PORV PZR spray, and PZR Htrs to automatic.

3. ? 0._, GO TO Step 3.27-in this procedure.

i l

O AP 545 REV 06 PAGE 15 of 23 PR W*e-'wpwr vit+'sW'7 Fw.r,fi

.gy.

c e

-+-,

-y y-

-v.,,.9 y,,.,,-%,,,g-,4,ye,,y g

3 w.

9 p-ryw,-,p-,7yyy99

-gr

-.-9,..yp.,--

rw-e,p.-..9 9,9y.,,w gy-yp.-

9y..siw--g-.'y g,9.--egrv wt' y 7 r-g

e O

I t

i BLANK PAGE O

t O

AP 545 REV 06 PAGE 16 of 23 PR i

3.0 FOLLOW.UPACTip33._{@ffIlDJ

[v)

ACTIONS DETAll}

STATUI An Asymmetric Fault has occurred.

3.24 Ensure RCS PRESS

  • Stabilize RCS PRESS between 2130 and stabilized.

2180 psig using:

PZR heaters PZR spray 3. 2 2 ~- Ensure h power stabilizes at or below required power RCPs Required Power level based on RCPs Running Level running.

4 s 607.

,,\\

V 3

s 457.

3, 2 3 __ Ensure vital plant

  • _ _ PZR level parameters are approaching stability.
  • __ Teve e _ _ MS Hdr PRESS

,N,)

AP 545 REV 06 PAGE 17 of 23 PR 1

I I

}

1 I,

i I

t t

t t

i i

BLANK PAGE i

l l

1 l

I i

I l

l

\\

AP 545 REV 06 PAGE 18 of 23 PR

- - - - -.. - ~

r

~

3.0 -FOLLOW-UP ACTIONS (CONT'D) l ACTIONS DETAILS 3.24 Notify Reactor Engineer of l

plant conditions.

i I

4 3.25

_,, Ensure quadrant power tilt r

is within limits.

3 See COLR i

I i

3.26 _

Maintain imbalance within e Adjust APSRs to m.a.intain limits.

4 limits.

i See OP 103D Withdrawal Limit i-a Curves.

,j ON

-3.27 1E power reduction was 2-15% in I hr,.

..Dif3 notify Chemistry to o

perform ITS required RCS sampiing.

-3,28

. Ensure regulating rod l

index is within group i

insertion limits.

4 See OP 103D. Withdrawal Limit Curves.

3.29 Verify _ rods are within

-1.6.5% of.their group average height.

i AP 5451 REV 06 PAGE 19 of-23

.PR

=m.

w.

.....-__i,

,.z_-.__,

,,w,

t i

i V

i i

4 l

i 9

4 i

b BLANK PAGE l

l

/*

-t AP-545 REV.06 PAGE 20 of 23 PR

.. _.. _ _. _ _ _ _ _... _ _ -.... ~.... _. _.

4 i

LD,J0LLM-UP ACTIMS (CMT'D) t ACTIONS DETAILS i

. 3.30 _. Ensure Rx thermal power is i

below the a;plicable I

runback limit.

See Table 2

-3.31.,_. Verify the' plant stable.

RCS PRESS stable with'PZR Htrs-and PZR spray in Auto.

  • _,,PZR level T

MS Hdr PRESS i

3.32 EXIT this procedure, r

_AP 545' REY 06" PAGE 21 of 23 PR

=

,+*eA4.-.-

.d44=.-AdhA_.,

a*.ww_A_A4.E.,.

maewJ--A e, m m, a

p4-uA.Aw)m.da.__

.-G-4

~4_A..AAM-amm-ww-maLem.4,aA..h----meta---

a O

l e

t O

i e

I i

I i

{

1 i

W b

BLANK PAGE i

f 0

B t

i i l

\\

AP 545 REV 06 PAGE 22 of 23 PR lu-


r-

,,.._,.n.__,,,

I 9

h RCP

-Selector Switch NR Tc Table 1:

1A RC 5A MS2 171 Proper Tc for IB RC 5A MS2 TT3 operating RCP IC RC-58 MS2 TT1 l

1D RC 5B MS2 TT3 Maximum Maximum Rx

+

Condition Rx Power Thermal Power i

- Table 2:

Asymmetric fault 60%

1526 Runba:L I.1mits Asymmetric Fault l

with 3 RCPs 45%

1145

/:

Loss of 1 MFWP 55%

1400 Loss of 1 MFWBP 55%

1400 Loss of 1 RCP r 75%

1908 f

?

4 O