RAPID POWER REDUCTION 1.0 [NTJLY CONDITIMI 11 conditions exist which require a rapid power reduction, JE N use this procedure.
L9__lMEDI ATE ACTIONS 891t There are no innediate actions for this procedure.
9 O
V Approved by HNPO
- 8 Date /1//0/f/
ig (SIGNATURfONFILE)
AP 510 PAGC 1 of 19 RPR
$DNK 0
?
O I
h i.
r 5
BLANK FAGE O
i 3
i l
O AP-510
.REV 01 PAGE 2 of 19 RPR
l b0 FOLLOW UP_ ACTIONS w-j ACTIONS' DETAILS 3.1 Notify personnel of plant
- ._. STA conditions.
i e _ Plant operators j
e,_,_ 5500 l
t o.__ Dispatcher l
3.2 Adjust ICS " LOAD RATE" to desired setpoint.
i 6
3.3 Adjust "t".11T LOAD MASTER"
,l demand tu "10".
4 O
3. 4 _ _,,
Maintain Imbalance within e Adjust APSRs-to maintain limits.
limits.
i
~
See OP 103D, Withdrawal limit i
- Curves, i
3.5 Maintain MUT level e Cycle appropriate BWST ta MVP valve t 55 in, to raise MUT level:
__ MVV-73 i
HUV-58 3.6
_ Notify Chemistry of 2 15t,'
Rx power change in any-I hour time period.
/~N V
IAP 510 REV PAGE 3 of-19 RPR h
i i
1 f
i r
i t
BLANK PAGE i
l I
l l
l i
i C
AP.510 REV 01 PAGE 4 of 19 ppg
~.
L.D FOLLOW-UP ACTIONS (CONT'D)
ACTIONS DETAILS 3.7 11 at any time, a rapid e
OP 204, Power Operations, power reduction is Section 4.2 MI required, M stop power reduction e __ OP 208. Plant Shutdown, and 60 70 the applicable Section 4.1 OP.
e _ OP 203, Plant Startup, Sectico 4.1 3.8 M Rx power is < 80%,
e Notify SP0 to ensure ASV 27 *MS to M ensure MS is AS Control" (119 ft TB by AS Hdr) is supplying AS.
supplying Aux Steam header.
3.9 Jf at any time, FWV-28 is 1
Notify PPO to obtain keys 11, 74
- opened, and 75 from Control Room.
E ensure EFIC MFW isolation is properly 2 Notify PPO to select Efl0 MFW
- aligned, isolation pump trip key switches to "BOTH":
__. "EflC CHANNEL B MAIN FW ISOLATION MAIN FW PUMP TRIP" (B Ef!C room, Aux Relay Cab RR581) 3.10 _
Maintain DFT level between 10 and 13 ft.
O AP 510 REV 01 PAGE $ of 19 RPR
Applicable Carry over steps:
^}
3.7 (V
1[ rapid power reduction is @l required, THEN stop power...
I 3.9 1E FWV-28 is opened, 1118 ensure EFlc MFW isolation...
!U AP 510 REV 01 PAGE 6 of 19 RPR
3.0 FOLLOW-UP ACTIONS (CONT'D)-
l b
r I
ACTIONS DETAILS 3.11 11 at any time, ICS
[
transfers to tracking i
- mode, M reset
- UNIT LOAD MASTER" demand to "10" to t
resume power decrease.
4 3.12 _., 11'at any time MBVs e Select MBVs to " MAN" and "CLOSE":
[
- close, M ensure MBVs remain FWV 30 i
closed.
1 FWV 29 i
,i 3.13 Verify Aux Transformer is not supplying any bus.
\\
J1 Aux Transformer is supplying any busses, M PERFORM Enclosure 1, Shu*down Electrical Lineup.
3,14 M both OTSGs are on low 1
Select Rx Diamond to " MANUAL".
level limits.
E align ICS for 2
Select " REACTOR DEMAND" to shutdown conditions.
" HAND".
1 3
Select "SG/RX DEMAND" to " HAND"
.and lower demand to *0".
4 Select both FW Loop Demands to
" HAND" and lower demand to "0".
"STH GEN A FW DEMAND" "STM GEN B FW DEMAND" O
APsi10 REV 01 PAGE 7 of 19 RPR m-
Applicable Carry over steps:
,iG 3.7 E rapid power reduction is 11Q1 required, THEN stop power...
V 3.9 E FWV 28 is opened, J11G ensure EFIC MFW isolation...
3.11 E ICS transfers to tracking mode,1116 reset "VNIT LOAD MASTER"...
v U}-
f AP 510 REV 01 PAGE 8 of 19 RPR
.,w "T'-
3.0 FOLLOW-UP ACTIONS (CONT!D)
ACTIONS DETAllS 3.15
_ Maintain PZR level.
See OP 103A, Startup Curves. Curve 5 3.16 _, Begin RCS cooldown.
CONCURRENTLY PERFMM E0P 14, 5. E0P (emperature Log (RCS TEMP).
Begin sequential control rod group insertion.
Maintain RCS cooldown rate 5 50'F/% hr.
3.17 __ Notify SP0 to CONCURRENTLY O
PERFORM E0P 14, Enclosure 1, SP0 Post Trip Actions.
3.18 _ M 11 Rx Power is < 12%,
1 Establish manual turbine l!!B trip Main Turbine.
control.
2
_ Establish 50 MWe turbine load (45 to 55).
3 Ensure TBVs are controlling MS Hdr PRES.i.
4 Depress Main Turbine trip push button.
5 Verify TVs and GVs are closed.
O AP 510 REV 01 PAGE 9 of 19 RPR
Applicable Carry over steps:
,7^N 3.7 E rapid power reduction is @l required, THEN stop power...
3,9 E FWV 28 is opened, Di[B ensure EFIC MFW isolation...
r i
k
.s %
V AP 510 REV 01 PAGE 10 of 19 RPR
-.. -....... ~ ~ - _ -.
l 3.0 FULLOW-UP ACTIONS (CONT'D)
ACTIONS DETAILS-I 3.i9
' Ensure Main Generator i
output Bkrs are open.
Bkr 1661 Bkr 1662 i
i 1
if any output Bkr fails to 1 Select affected output Bkr to-
~
open,.
" BACKUP":
M attempt to open output Bkr using backup "BKR 1661 TRIP COIL SELECTOR trip coils.
SWITCH" "BKR 1662 TRIP C0ll SELECTOR SWITCH" 2 Open affected output Bkrs:
4 Bkr 1661 Bkr 1662 3
If output Bkrs are @l open, l
' O.
E notify Dispatcher to separate CR 3 frorp grid.
l t
3.20 _ If CR 3 is separated from Open field Bkr.
the grid.
1 E shutdown Main Select voltage regulator to Generator.
"0FF".
O AP 510:
REV'01-PAGE 11:of 19 RPR
Applicable Carry-over steps:
(~)N 3,7 E rapid power reduction is NOT required, THEN stop power...
K_
3.9 H. FWV-28 is opened, THEN ensure EFIC MFW isolation...
/
'T U
,m; Isj AP-510 REV 01 PAGE 12 of 19 RPR
. _.... - _ _ _ _ _ -.. _ _ _. - _. - - _ _. - -. _ ~ _... _.
-i
.t 3.0- FOLLOW-UP~ ACTIONS (CONT'D)
-)
ACll0fl.E DETAILS:
3. 21._
Ensure Main-Turbine oil pumps.are running, T8P 8 TBP-2 a
3.22 __
-Ensure AH Hain Turbine drain valves.are open.-
TDV TDV-6 TDV-1 TDV-5
=TDV-3
_ TDV-7
.TDV-4 TDV-9 TDV-10 TDV-8 3.23 Jf this procedure was entered from E0P 6 Steam
-Generator Tube Rupture, lH_Qf EXIT this procedure.
.L J
-AP-510 REV 01 PAGE 13'of 19'
-RPR
Applicable Carry over steps:
~}
3.7 E rap-;d power reduction is NOT required, THEN stop power...
3.9 E FWV-28 is opened, JJiG ensure EFIC MFW isolation...
O t.)
/
g wJ AP 510 REV 01 PAGE 14 of 19 RPR
F 3.0 FOLLOW-UP ACTIONS (CONT'D)
)
ACTIONS DETAILS
(
3.24 Align CD System for low 1
Select both CDP-1A and CDP 1B flow operation.
controllers to " HAND" and reduce demand to "0".
2 Ensure only 1 CDP is running.
3 Close CD Htr outlet valves:
CDV-44.
CDV-43 4
Maintain CD system PRESS between 90 and 150 psig.
5 Throttle CDV-242 to maintain DFT level-between 8 and 11 ft.
501t
/"'
The following step will add a 125 psig bias to the TBVs.
N,-]s 3.25 ___ WHEN Rx power lowers to 5'.,
I!!fN trip Rx and GO TO E0P-2, Vital System Status Verification, beginning with step 2,1 4
AP 510 REV 01-PAGE 15 of 19 RPR
O s
e BLANK PAGE 1.
I d
AP 510 REV 01 PAGE 16 of 19 RPR I
l
5;0 ENCLOSURE l' $HUTDOWN ELECTRICAL LINEUP-()
= ACTIONS _
DETAILS-1.1-If Bkr 3101 is closed,
.l' Select " AUTO TRANSFER 3103"tto -
I 181H transfer the A 6900V
" MAN".
bus to START UP transformer.
2 Close Bkr 3103 3
Open Bkr 3101-1.2 If Bkr 3201 is closed, 1
Select " AUTO TRANSFER 3203" to 181H transfer the A unit
" MAN".
4160V bus to START UP transformer.
2' Close Bkr 3203 3
Open Bkr 3201 1,3-If Bkr 3207 is closed, 1
Select " SYNC 3211" to "0N".
6ND the_0FFSITE Os transformer is the desired 2
Close-Bkr 3211
- source, IHfB transfer the A ES
-3 Open Bkr 3207 4160V to Bus to the OFFSITE transformer.
4 Select " SYNC 3211" to "0FF".
1.4-if Bkr 3207 is closed, 1
Select " SYNC 3205" to "0N".
AtQ the BEST is the l
desired source, 2
Close-Bkr 3205 THEN transfer the A ES 4160V Bus to the BEST.
3-Open Bkr 3207 4
Select " SYNC 3205" to "0FF".
- s. -
AP-510 REV 01 PAGE 17 of 19 RPR
c.
.9 1
E 4
1 BLANK PAGE O
h t
i s
AP-510 REV 01 PAGE 18 of 19 RPR
)
\\
n
5.0 ENCLOSURE _1-5HUTDOWN ELECTRICAL LINEUP (CONT'D)
ACTIONS DETAILS 1.5,__ _ E Bkr 3102 is closed, 1
Select " AUTO TRANSFER 3104" to liiLN transfer the B 6900V
" MAN".
bus to START UP transformer.
2 Close Bkr 3104 3
Open Bkr 3102 1.6 H Bkr 3202 is closed, 1
Select " AUTO TRANSFER 3204" to IliLN transfer the B unit
" MAN".
4160V bus to the START UP transformer.
2 Close Bkr 3204 3
Open Bkr 3202 1.7 E Bkr 3208 is closed, 1
Select " SYNC 3206" to "0N".
AND the BEST is the O
desired source, 2
Close Bkr 3206 V
IllLN transfer the B ES 4160V-Bus to the BEST.
"3 Open Bkr 3208 4 _ Select " SYNC 3206" to "0FF".
1.8 H Bkr 3208 is closed, 1
Select " SYNC 3212" to "0N".
A@ the 0FFSITE transformer is the desired 2
Close Bkr 3212
- source, lHLN transfer the B ES 3 _ Open Bkr 3208 4160V to Bus to the OFFSITE transformer.
4 Select " SYNC 3212" to "0FF".
O AP-510 REV 01 PAGE 19 of 19 (LAST PAGE)
RPR
-