Ak an u EQ b([$ I AP 961 l

c EARTHQUAKE 1.0 ENTRY CONDITIQH1 If an earthquake is suspected, MD seismic recorder indicates a seismic event has taken place, JHfjj use this procedure.

2.0.. IMMEDIATE ACTIONS HQIE There are no immediate actions for this procedure.

'j i

/

Approved by HNPO Date/2 /b /f/

,q (SIGNAldRE ON FILE)

AP 961 PAGE 1 of 13 EQ 9712220125 971211 PDR ADOCK 05000302 P

PDR t.

]

O f

I d

BLANK PAGE O

T AP-961 REV 07 PAGE 2 of 13 EQ L_

e 3.0 FOLLOW.UP ACTIONS ACTIONS DETAILS-3.1-Notify personnel of plant STA conditions.

Plant Operators v

SSOD (evaluate plant conditions for potential entry into the Emergency Plan) 3.2

1f the Rx is 1101 critical.

IE W GO TO Step 3.7 in this procedure.

3.3 _ 1.E any asymmetric control rod exists,-

-lHQ trip the Rx and CONCURRENTLY PERFORN O

E0P 2. Vital System Status Verification, beginning with Step 2.1

-3.4 Verify quadrant power tilt is within limits.

See COLR.

if OJadrant power tilt is MQI within limits.

JHG trip the Rx and CONCURRENTLY PERFORN E0P-2,. Vital System Status Verification, beginning with Step 2.1 AP-961.

REV 07 PAGE 3 of 13 EQ

i b

i 1

i r

1 A

l l

1 i

3

'l BLANK PAGE O

O AP 961 REV 07 PAGE 4'of 13 EQ t

~

3.0 FOLLOW-UP ACTIONS (CONT'D) 7-g 1, ) -.

-ACTIONS DETAILS 3.5

-Verify imbalance within limits.-

See OP 103D, Withdrawal-Limit Curves.

J1 imbalance is N_0I within Q

limits, IBEN trip the Rx and CONCURRENTLY PERFORM E0P 2, Vital System Status Verification, beginning with Step 2.1 3.6 lE it is determined that e CONCURRENTLY PERFORM AP-510, Rapid vibration is NOT due to Power Reduction beginning with

-plant equipment, Step 3.1 ld[B start a controlled

(}

plant shutdown.

i i

-j l.

\\v'.

AP-961

'REV 07 PAGE 5 of 13 EQ

)

O n

BLANK PAGE O

O AP-961 REV 07 PAGE 6 of 13 EQ

f

s. g _

2

__3.0 F0LLOW-UP ACTIONS (CONT'D)-

}

ACTIONS DETAILS

-3.7 Verify RCS integrity..

  • Monitor available parameters:

RC PRESS:

PZR level-MUT level 4

RB Sump level RCS level e

Notify PPO to inspect AB Sump level.

Jf RCS integrity is lost, Itif3 CONCURRENTLY PERFORM AP-520: Loss of RCS Coolant or Pressure.

O 3.8 Verify BWST is @l in recirculation with SF cooling.

1[ the BWST is 1

Stop recirculation.

recirculation _ with SF cooling.

2 Notify PP0 to ensure SFV-13 THEN stop recirculation.

"BWST Supply Iso" is closed (119 ft AB by SFPs).

3. 9_.

Notify Chemistry to sample RCS for fuel failure, e

SF Pool-AP-961 REV 07 PAGE 7 of 13 EQ J

,r-+

a

i f

'\\v l

BLANK PAGE O

AP 961 q'EV 07 PAGE 8 of 13 EQ

350 FOLLOW-UP ACTIONS (CONT'D)

- 'H Q

ACTIONS DETAILS-

-3.10 Verify SF Pool integrity.

SF pool level e'

Notify PPO to inspect SF pool.

liner telltale drains (95 ft AB MVPcubicles).

E a rise in SF Pool leakags has occurred, JH W contact TSC for guidance.

4 3.11 E refueling canal. level is lowering.

IliG CONCURRENTLY PERFORM AP-1080, Refueling Canal

' Level Decrease beginning with Step 3.1 b

Seismic activity may result in spurious operation of the sudden pressure relays for the Off-Site Power Transformer or the BEST resulting in a loss of off-site power.

3.12.___, Verify ES 4160V buses are energized.

E either ES 4160V bus is t@I energized.

-It!G CONCURRENTLY PERFORM AP-770, Diesel Generator

-Actuation beginning with Step 3.1

_1R-x).

AP-961 REV 07 PAGE 9 of 13 EQ

4

.- ().

(J BLANK PAGE

. p, V

t

\\

I AP 961 -

REV 07 PAGE 10 of 13 EQ s

i,

-e e

3.0 FOLLOW-UP ACTIONS-(CONT'D)

ACTIONS DETAILS-stir Evaluation of plant alarms should consider spurious actuation due to seismic activity.--

3.13 ___ Perform a physical review

-e Review the following:

of entire plant.-

Sump levels, radiation monitors and tank levels for possible leaks System status relative to alarms,-lockouts and configuration that _may be a result of. relay chatter e Notify PPO to review the following:

Containment integrity Dhysical plant structures and equipment to determine if damage inhibits the safe' operation of plant equipment e Notify SP0 to review the following:

4 H, tank for possible -leak of explosive gas Fire Service Storage Tarks for leak (s) 1 Physical plant structures and equipment to determine if damage inhibits the safe operation of plant equipment e

i AP-961 REV 07 PAGE 11 of 13 EQ

=

O E

I BLANK PAGE O

l AP-961 REV 07 PAGE

'S of 13 EQ

l..

i

.y t

-v

'3i0 FOLLOW-UP ACTIONS (CONT'D).

.,e

~

l ACTIONS

- DETAILS-3.14 Revies current lpl' ant

-activities for any. actions

. t that.may have caused the ivibrations.

- l

=3,15 Notify MNP0_to ' determine

. subsequent actions and additional surveillance

requirements based on results of physical inspection and follow up

. action.

s 3.16 _ Notify-I&C Supervisor to perform PT-378, Functional Testing and Calibration of the Triaxial Time-History Accelographs and Triaxial Seismic Switch, Section 4.2, Action Following a Seismic' Event..

2 17 _

EXIT this procedure, f

AP-9611

~

REV 07' PAGE 13 of 13 (LASTTPAGE)