MONTHYEARML20212C1121999-09-16016 September 1999 Criticality Safety Analysis of W Spent Fuel Storage Racks in Pool B of Crystal River Unit 3 ML20212C0961999-09-16016 September 1999 Proposed ITS & Bases Changes Strikeout & Shadowed Text & Revision Bar Format,Increasing Licensed Capacity for Spent Fuel Assembly Storage in SFP & Revising Configuration for Storage of Fresh Fuel ML20211L1011999-09-0202 September 1999 Proposed Tech Specs Re Once Though SG Tube Surveillance Program,Alternate Repair Criteria (ARC) for Axial Tube End Crack (Tec) Indications ML20212C0991999-08-31031 August 1999 Criticality Safety Analysis of Crystal River Unit 3 Pool a for Storage of 5% Enriched Mark B-11 Fuel in Checkerboard Arrangement with Water Holes ML20209D2971999-07-0808 July 1999 Proposed Tech Specs,Changing ITS for CREVS & VFTP & Correcting Typo in ITS Section 5.6.2.12 ML20195B8091999-05-26026 May 1999 Proposed Tech Specs,Revising ITS Bases That Will Update NRC Copies of ITS ML20195B7081999-05-17017 May 1999 Proposed ITS Section 3.3.8, EDG Lops, SR 3.3.8.1,revising Note for Surveillance & Deleting Note for Frequency ML20206S7691999-05-12012 May 1999 Proposed Improved Tech Specs Pages 3.4-21 Through 3.4-21D ML20206N1401999-05-10010 May 1999 Proposed ITS Administrative Controls Section 5.8, High Radiation Area ML20206M0961999-05-0707 May 1999 Proposed Tech Specs,Revising Wording for SR 3.5.2.5 to Be More Consistent with NUREG-1430,Rev 1 & Clarifying Process of Valve Position Verification ML20206H6541999-05-0505 May 1999 Proposed Tech Specs,Proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of CR-3 OTSGs ML20204D9211999-03-18018 March 1999 Proposed Tech Specs Re OTSG Tubes Surveillance Program,Tube Repair Roll Process ML20205A7651999-03-18018 March 1999 Rev 29 to AR-305, Es E Annunciator Response ML20205A7961999-03-15015 March 1999 Rev 22 to AR-301, ESA Annunciator Response ML20205A8051999-03-15015 March 1999 Rev 33 to AR-303, ESC Annunciator Response ML20205A8211999-03-15015 March 1999 Rev 35 to AR-403, PSA H Annunciator Response ML20205A3441999-03-12012 March 1999 Rev 25 to AR-402, PSA G Annunciator Response ML20204D5781999-03-0909 March 1999 Rev 10 to AP-513, Toxic Gas ML20204D5821999-03-0808 March 1999 Rev 22 to AR-603, Tgf O Annunciator Response ML20207H7741999-03-0303 March 1999 Rev 15 to AR-602, Tgf N Annunciator Response ML20207J6591999-03-0202 March 1999 Rev 18 to AR-504, ICS L Annunciator Response ML20207J6461999-03-0202 March 1999 Rev 21 to AR-301, ESA Annunciator Response ML20206S7561999-02-28028 February 1999 Rev 2 to Pressure/Temp Limits Rept, Dtd Feb 1999 ML20203C7461999-02-0303 February 1999 Rev 2 to AR-801, FSA Annunciator Response ML20202E6551999-01-27027 January 1999 Proposed Tech Specs Re OTSG Tubes Surveillance Program,Insp Interval Extension ML20202B1411999-01-22022 January 1999 Rev 22 to AR-401, PSA F Annunciator Response ML20199G5201999-01-15015 January 1999 Rev 11 to AP-961, Earthquake ML20199G5581999-01-12012 January 1999 Rev 4 to AP-404, Loss of Decay Heat Removal ML20199G5691999-01-12012 January 1999 Rev 4 to AP-604, Waterbox Tube Failure ML20198T2411999-01-0606 January 1999 Rev 19 to AR-701, Ssf P Annunciator Response ML20196G6771998-12-0101 December 1998 Rev 17 to Annunciator Response AR-702, Ssf Q Annunciator Response ML20196D6761998-11-30030 November 1998 Proposed Tech Specs LCO 3.9.3,allowing Both Doors in Personnel Air Locks & Single Door in Oeh to Be Open During Refueling Operations ML20196G5851998-11-25025 November 1998 Rev 32 to AR-303, ESC Annunciator Response ML20196G3371998-11-25025 November 1998 Reissued Rev 15 to AR-702, Ssf Q Annunciator Response ML20195K4551998-11-24024 November 1998 Proposed Tech Specs,Installing diesel-driven EFW Pump to Remove Interim ITS & Provide Resolution to EDG Capacity Limitations ML20196F6691998-11-24024 November 1998 Rev 11 to AP-330, Loss of Nuclear Svc Cooling ML20195K0031998-11-23023 November 1998 Proposed Tech Specs Re LAR Number 241,rev 0 for High Pressure Injection Sys Mods ML20196F7721998-11-23023 November 1998 Rev 3 to EOP-12, Station Blackout ML20196F7031998-11-23023 November 1998 Rev 3 to AP-404, Loss of Decay Heat Removal ML20196F7541998-11-23023 November 1998 Rev 7 to EOP-08, LOCA Cooldown ML20196F7461998-11-23023 November 1998 Rev 6 to EOP-07, Inadequate Core Cooling ML20196F7241998-11-23023 November 1998 Rev 2 to AP-510, Rapid Power Reduction ML20196F7161998-11-23023 November 1998 Rev 9 to AP-470, Loss of Instrument Air ML20196F8711998-11-23023 November 1998 Rev 28 to AR-305, Es E Annunciator Response ML20196F9451998-11-19019 November 1998 Rev 7 to AP-1080, Refueling Canal Level Lowering ML20196F9381998-11-19019 November 1998 Rev 27 to AP-770, Emergency Diesel Generator Actuation ML20195H6581998-11-17017 November 1998 Proposed Improved Tech Specs (Its),Revising 5.7.2 by Changing Type of Structural Integrity Assessment Required from Probabilistic to Deterministic ML20196D8321998-11-13013 November 1998 Rev 1 to Crystal River Unit 3 ASME Section Xi,Isi Program Interval 3 & Ten Yr NDE Program ML20195H8761998-11-0505 November 1998 Rev 23 to AR-302, Esb Annunciator Response ML20155F4021998-10-30030 October 1998 Proposed Revised Improved Tech Specs (ITS) Section 5.6.2.19, ITS Section 3.4.11,Bases 3.4.11 & 3.4.3 Re PTLR & LTOP Limits 1999-09-02
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20205A7651999-03-18018 March 1999 Rev 29 to AR-305, Es E Annunciator Response ML20205A8051999-03-15015 March 1999 Rev 33 to AR-303, ESC Annunciator Response ML20205A7961999-03-15015 March 1999 Rev 22 to AR-301, ESA Annunciator Response ML20205A8211999-03-15015 March 1999 Rev 35 to AR-403, PSA H Annunciator Response ML20205A3441999-03-12012 March 1999 Rev 25 to AR-402, PSA G Annunciator Response ML20204D5781999-03-0909 March 1999 Rev 10 to AP-513, Toxic Gas ML20204D5821999-03-0808 March 1999 Rev 22 to AR-603, Tgf O Annunciator Response ML20207H7741999-03-0303 March 1999 Rev 15 to AR-602, Tgf N Annunciator Response ML20207J6591999-03-0202 March 1999 Rev 18 to AR-504, ICS L Annunciator Response ML20207J6461999-03-0202 March 1999 Rev 21 to AR-301, ESA Annunciator Response ML20203C7461999-02-0303 February 1999 Rev 2 to AR-801, FSA Annunciator Response ML20202B1411999-01-22022 January 1999 Rev 22 to AR-401, PSA F Annunciator Response ML20199G5201999-01-15015 January 1999 Rev 11 to AP-961, Earthquake ML20199G5581999-01-12012 January 1999 Rev 4 to AP-404, Loss of Decay Heat Removal ML20199G5691999-01-12012 January 1999 Rev 4 to AP-604, Waterbox Tube Failure ML20198T2411999-01-0606 January 1999 Rev 19 to AR-701, Ssf P Annunciator Response ML20196G6771998-12-0101 December 1998 Rev 17 to Annunciator Response AR-702, Ssf Q Annunciator Response ML20196G3371998-11-25025 November 1998 Reissued Rev 15 to AR-702, Ssf Q Annunciator Response ML20196G5851998-11-25025 November 1998 Rev 32 to AR-303, ESC Annunciator Response ML20196F6691998-11-24024 November 1998 Rev 11 to AP-330, Loss of Nuclear Svc Cooling ML20196F7161998-11-23023 November 1998 Rev 9 to AP-470, Loss of Instrument Air ML20196F7031998-11-23023 November 1998 Rev 3 to AP-404, Loss of Decay Heat Removal ML20196F8711998-11-23023 November 1998 Rev 28 to AR-305, Es E Annunciator Response ML20196F7541998-11-23023 November 1998 Rev 7 to EOP-08, LOCA Cooldown ML20196F7241998-11-23023 November 1998 Rev 2 to AP-510, Rapid Power Reduction ML20196F7461998-11-23023 November 1998 Rev 6 to EOP-07, Inadequate Core Cooling ML20196F7721998-11-23023 November 1998 Rev 3 to EOP-12, Station Blackout ML20196F9451998-11-19019 November 1998 Rev 7 to AP-1080, Refueling Canal Level Lowering ML20196F9381998-11-19019 November 1998 Rev 27 to AP-770, Emergency Diesel Generator Actuation ML20196D8321998-11-13013 November 1998 Rev 1 to Crystal River Unit 3 ASME Section Xi,Isi Program Interval 3 & Ten Yr NDE Program ML20195H8761998-11-0505 November 1998 Rev 23 to AR-302, Esb Annunciator Response ML20154E5161998-10-0101 October 1998 Rev 10 to AP-961, Earthquake ML20154C2691998-09-29029 September 1998 Rev 19 to AR-304, ESD Annunciator Response ML20154C2751998-09-29029 September 1998 Rev 18 to AR-701, Ssf P Annunciator Response ML20154E5361998-09-28028 September 1998 Rev 34 to AR-403, PSA H Annunciator Response ML20154F0841998-09-28028 September 1998 Rev 21 to AR-503, ICS K Annunciator Response ML20154E5271998-09-28028 September 1998 Rev 20 to AR-301, ESA Annunciator Response ML20154Q0061998-09-24024 September 1998 Rev 8-0 to Crystal River Unit 3 Security Training & Qualification Plan ML20237B4431998-08-10010 August 1998 Rev 14 to AR-703, Ssf R Annunciator Response ML20236W9711998-07-30030 July 1998 Rev 24 to AR-402, PSA G Annunciator Response ML20236P9891998-07-13013 July 1998 Rev 22 to AR-501, ICS I Annunciator Response ML20249C1531998-06-20020 June 1998 Rev 4 to EOP-14, Emergency Operating Procedure Enclosures ML20249A3341998-06-0505 June 1998 Rev 10 to AP-330, Loss of Nuclear Service Cooling ML20247E6861998-05-0606 May 1998 Rev 20 to AR-603, Tgf O Annunciator Response ML20217Q4621998-04-30030 April 1998 Rev 15 to Crystal River Unit 3 ASME Section XI Pump & Valve Program Inservice Testing Program ML20247E6621998-04-30030 April 1998 Rev 10 to AP-250, Radiation Monitor Actuation ML20216A9981998-04-24024 April 1998 Rev 30 to AR-303, ESC Annunciator Response ML20217E1481998-04-20020 April 1998 Rev 21 to AR-302, Esb Annunciator Response ML20217C1441998-04-17017 April 1998 Rev 20 to ICS K Annunciator Response ML20217C2631998-04-17017 April 1998 Rev 13 to AR-703, Ssf R Annunciator Response 1999-03-09
[Table view] |
Text
.. ._. . ._
Ak an u EQ b([$ I AP 961 l c
EARTHQUAKE 1.0 ENTRY CONDITIQH1 If an earthquake is suspected, MD seismic recorder indicates a seismic event has taken place, JHfjj use this procedure.
2.0.. IMMEDIATE ACTIONS HQIE There are no immediate actions for this procedure. 'j i
/
Approved by HNPO Date/2 /b /f/
,q (SIGNAldRE ON FILE)
AP 961 PAGE 1 of 13 EQ 9712220125 971211 PDR ADOCK 05000302 P PDR t.
l
]
f I
d BLANK PAGE O ..
T AP-961 REV 07 PAGE 2 of 13 EQ L_
e
.. 3.0 FOLLOW.UP ACTIONS ACTIONS DETAILS-3.1- Notify personnel of plant
- Plant Operators v SSOD (evaluate plant conditions for potential entry into the Emergency Plan) 3.2 :1f the Rx is 1101 critical.
IE W GO TO Step 3.7 in this procedure.
3.3 _ 1.E any asymmetric control rod exists,-
-lHQ trip the Rx and CONCURRENTLY PERFORN E0P 2. Vital System Status O Verification, beginning with Step 2.1 -
-3.4 Verify quadrant power tilt is within limits.
See COLR.
, , _ , , if OJadrant power tilt is MQI within limits.
JHG trip the Rx and CONCURRENTLY PERFORN E0P-2,. Vital System Status Verification, beginning with Step 2.1 AP-961. REV 07 PAGE 3 of 13 EQ
i i
. i r
1 A
l l
1 i
3
'l BLANK PAGE O
O AP 961 REV 07 PAGE 4'of 13 EQ t
.- .- ~ _ . . . . . . - . . - - . . . -.. .
, 3.0 FOLLOW-UP ACTIONS (CONT'D) 7- g 1, ) -. -ACTIONS DETAILS 3.5 -Verify imbalance within limits.-
See OP 103D, Withdrawal-Limit Curves.
__ J1 imbalance is N_0I Q within limits, ',
IBEN trip the Rx and -
CONCURRENTLY PERFORM '
E0P 2, Vital System Status Verification, beginning with Step 2.1 3.6 __. lE it is determined that e CONCURRENTLY PERFORM AP-510, Rapid vibration is NOT due to Power Reduction beginning with
-plant equipment, Step 3.1 ld[B start a controlled plant shutdown.
(}
i i
-j l.
\v' .
AP-961 'REV 07 PAGE 5 of 13 EQ
)
l O
n BLANK PAGE O
O -
AP-961 REV 07 PAGE 6 of 13 EQ
f
- s. g _ 2
.- __3.0 F0LLOW-UP ACTIONS (CONT'D)-
} ACTIONS DETAILS
-3.7 Verify RCS integrity. .
- Monitor available parameters:
RC PRESS:
PZR level- ,
MUT level 4 RB Sump level !
RCS level e Notify PPO to inspect AB Sump level.
Jf RCS integrity is lost, Itif3 CONCURRENTLY PERFORM AP-520: Loss of RCS Coolant or Pressure.
O 3.8 _ Verify BWST is @l in --
recirculation with SF cooling.
1[ the BWST is 1 Stop recirculation.
recirculation _ with SF cooling. 2 Notify PP0 to ensure SFV-13 THEN stop recirculation. "BWST Supply Iso" is closed (119 ft AB by SFPs).
3 . 9_. Notify Chemistry to sample
- RCS for fuel failure, e SF Pool-AP-961 REV 07 PAGE 7 of 13 J EQ
,,, ,r-+ , ,- , - - . . ,
i f
'\v I
l l
BLANK PAGE O ...
AP 961 q'EV 07 PAGE 8 of 13 EQ
. 350 FOLLOW-UP ACTIONS (CONT'D)
- 'H Q ACTIONS DETAILS-
-3.10 Verify SF Pool integrity.
- SF pool level e' Notify PPO to inspect SF pool.
liner telltale drains (95 ft AB MVPcubicles).
E a rise in SF Pool leakags has occurred, JH W contact TSC for guidance.
4 3.11 E refueling canal. level is lowering.
IliG CONCURRENTLY PERFORM AP-1080, Refueling Canal
' Level Decrease beginning ,
with Step 3.1 b
Seismic activity may result in spurious operation of the sudden pressure relays for the Off-Site Power Transformer or the BEST resulting in a loss of off-site power.
3 .12 .___, Verify ES 4160V buses are energized.
E either ES 4160V bus is t@I energized.
-It!G CONCURRENTLY PERFORM AP-770, Diesel Generator
-Actuation beginning with Step 3.1
_1R-x).
- AP-961 REV 07 PAGE 9 of 13 EQ
4
.- () .
(J BLANK PAGE
. p, V ,,
t
\
I AP 961 - REV 07 PAGE 10 of 13 EQ s
i, . . . . . .
-e e 3.0 FOLLOW-UP ACTIONS-(CONT'D)
ACTIONS DETAILS-stir !
Evaluation of plant alarms should consider spurious actuation due to seismic activity.-- ,
3.13 ___ Perform a physical review -e Review the following:
of entire plant.-
Sump levels, radiation monitors and tank levels for possible leaks System status relative to alarms,-lockouts and configuration that _may be a ,
result of. relay chatter e Notify PPO to review the following:
Containment integrity Dhysical plant structures and equipment to determine if damage inhibits the safe' operation of plant equipment 4
e Notify SP0 to review the following:
H, tank for possible -leak of explosive gas Fire Service Storage Tarks for leak (s) 1 Physical plant structures and equipment to determine if damage inhibits the safe operation of plant equipment e .
i AP-961 REV 07 PAGE 11 of 13 EQ
= ,, , _
O E
I BLANK PAGE O
AP-961 REV 07 PAGE 'S of 13 l EQ
- l. . . . . . -
- - . _ --- i
.y . _ _ _ _ _ _ _ . . . _. ._-
t
-v '3i0 FOLLOW-UP ACTIONS (CONT'D).
. ,e ~
l ACTIONS
- DETAILS-3.14 Revies current lpl' ant . !
-activities for any. actions .t that.may have caused the ivibrations.
-l
=3,15 Notify MNP0_to ' determine !
. subsequent actions and additional surveillance
- requirements based on results of physical inspection and follow up
. action.
- s 3.16 _ Notify-I&C Supervisor to perform PT-378, Functional Testing and Calibration of the Triaxial Time-History
. Accelographs and Triaxial Seismic Switch, Section -
4.2, Action Following a Seismic' Event..
2 17 _
. EXIT this procedure, f
~
AP-9611 REV 07' PAGE 13 of 13 (LASTTPAGE) EQ-