.. ._. . ._

Ak an u EQ b([$ I AP 961 l c

EARTHQUAKE 1.0 ENTRY CONDITIQH1 If an earthquake is suspected, MD seismic recorder indicates a seismic event has taken place, JHfjj use this procedure.

2.0.. IMMEDIATE ACTIONS HQIE There are no immediate actions for this procedure. 'j i

/

Approved by HNPO Date/2 /b /f/

,q (SIGNAldRE ON FILE)

AP 961 PAGE 1 of 13 EQ 9712220125 971211 PDR ADOCK 05000302 P PDR t.

l

]

  • l O

f I

d BLANK PAGE O ..

T AP-961 REV 07 PAGE 2 of 13 EQ L_

e

.. 3.0 FOLLOW.UP ACTIONS ACTIONS DETAILS-3.1- Notify personnel of plant

  • STA conditions.
  • Plant Operators v SSOD (evaluate plant conditions for potential entry into the Emergency Plan) 3.2 :1f the Rx is 1101 critical.

IE W GO TO Step 3.7 in this procedure.

3.3 _ 1.E any asymmetric control rod exists,-

-lHQ trip the Rx and CONCURRENTLY PERFORN E0P 2. Vital System Status O Verification, beginning with Step 2.1 -

-3.4 Verify quadrant power tilt is within limits.

See COLR.

, , _ , , if OJadrant power tilt is MQI within limits.

JHG trip the Rx and CONCURRENTLY PERFORN E0P-2,. Vital System Status Verification, beginning with Step 2.1 AP-961. REV 07 PAGE 3 of 13 EQ

i i

  • b 1

. i r

1 A

l l

1 i

3

'l BLANK PAGE O

O AP 961 REV 07 PAGE 4'of 13 EQ t

.- .- ~ _ . . . . . . - . . - - . . . -.. .

, 3.0 FOLLOW-UP ACTIONS (CONT'D) 7- g 1, ) -. -ACTIONS DETAILS 3.5 -Verify imbalance within limits.-

See OP 103D, Withdrawal-Limit Curves.

__ J1 imbalance is N_0I Q within limits, ',

IBEN trip the Rx and -

CONCURRENTLY PERFORM '

E0P 2, Vital System Status Verification, beginning with Step 2.1 3.6 __. lE it is determined that e CONCURRENTLY PERFORM AP-510, Rapid vibration is NOT due to Power Reduction beginning with

-plant equipment, Step 3.1 ld[B start a controlled plant shutdown.

(}

i i

-j l.

\v' .

AP-961 'REV 07 PAGE 5 of 13 EQ

)

l O

n BLANK PAGE O

O -

AP-961 REV 07 PAGE 6 of 13 EQ

f

s. g _ 2

.- __3.0 F0LLOW-UP ACTIONS (CONT'D)-

} ACTIONS DETAILS

-3.7 Verify RCS integrity. .

  • Monitor available parameters:

RC PRESS:

PZR level- ,

MUT level 4 RB Sump level  !

RCS level e Notify PPO to inspect AB Sump level.

Jf RCS integrity is lost, Itif3 CONCURRENTLY PERFORM AP-520: Loss of RCS Coolant or Pressure.

O 3.8 _ Verify BWST is @l in --

recirculation with SF cooling.

1[ the BWST is 1 Stop recirculation.

recirculation _ with SF cooling. 2 Notify PP0 to ensure SFV-13 THEN stop recirculation. "BWST Supply Iso" is closed (119 ft AB by SFPs).

3 . 9_. Notify Chemistry to sample

  • RCS for fuel failure, e SF Pool-AP-961 REV 07 PAGE 7 of 13 J EQ

,,, ,r-+ , ,- , - - . . ,

i f

'\v I

l l

BLANK PAGE O ...

AP 961 q'EV 07 PAGE 8 of 13 EQ

. 350 FOLLOW-UP ACTIONS (CONT'D)

- 'H Q ACTIONS DETAILS-

-3.10 Verify SF Pool integrity.

  • SF pool level e' Notify PPO to inspect SF pool.

liner telltale drains (95 ft AB MVPcubicles).

E a rise in SF Pool leakags has occurred, JH W contact TSC for guidance.

4 3.11 E refueling canal. level is lowering.

IliG CONCURRENTLY PERFORM AP-1080, Refueling Canal

' Level Decrease beginning ,

with Step 3.1 b

Seismic activity may result in spurious operation of the sudden pressure relays for the Off-Site Power Transformer or the BEST resulting in a loss of off-site power.

3 .12 .___, Verify ES 4160V buses are energized.

E either ES 4160V bus is t@I energized.

-It!G CONCURRENTLY PERFORM AP-770, Diesel Generator

-Actuation beginning with Step 3.1

_1R-x).

AP-961 REV 07 PAGE 9 of 13 EQ

4

.- () .

(J BLANK PAGE

. p, V ,,

t

\

I AP 961 - REV 07 PAGE 10 of 13 EQ s

i, . . . . . .

-e e 3.0 FOLLOW-UP ACTIONS-(CONT'D)

ACTIONS DETAILS-stir  !

Evaluation of plant alarms should consider spurious actuation due to seismic activity.-- ,

3.13 ___ Perform a physical review -e Review the following:

of entire plant.-

Sump levels, radiation monitors and tank levels for possible leaks System status relative to alarms,-lockouts and configuration that _may be a ,

result of. relay chatter e Notify PPO to review the following:

Containment integrity Dhysical plant structures and equipment to determine if damage inhibits the safe' operation of plant equipment 4

e Notify SP0 to review the following:

H, tank for possible -leak of explosive gas Fire Service Storage Tarks for leak (s) 1 Physical plant structures and equipment to determine if damage inhibits the safe operation of plant equipment e .

i AP-961 REV 07 PAGE 11 of 13 EQ

= ,, , _

O E

I BLANK PAGE O

AP-961 REV 07 PAGE 'S of 13 l EQ

l. . . . . . -

- - . _ --- i

.y . _ _ _ _ _ _ _ . . . _. ._-

t

-v '3i0 FOLLOW-UP ACTIONS (CONT'D).

. ,e ~

l ACTIONS

- DETAILS-3.14 Revies current lpl' ant .  !

-activities for any. actions .t that.may have caused the ivibrations.

-l

=3,15 Notify MNP0_to ' determine  !

. subsequent actions and additional surveillance

requirements based on results of physical inspection and follow up

. action.

s 3.16 _ Notify-I&C Supervisor to perform PT-378, Functional Testing and Calibration of the Triaxial Time-History

. Accelographs and Triaxial Seismic Switch, Section -

4.2, Action Following a Seismic' Event..

2 17 _

. EXIT this procedure, f

~

AP-9611 REV 07' PAGE 13 of 13 (LASTTPAGE) EQ-

.s v.#r. . . , , r - .- - p