Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20212F460 | 23 September 1999 | Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively, Approving Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters | |
ML20207A578 | 20 May 1999 | Errata to Amend 163 to OL DPR-79 on 931126.SR 4.1.1.1.1.d Was Inadvertently Omitted from Pp 3/4 1-1 of Unit 2 TS | Shutdown Margin |
IA-97-261, Amend 220 to License DPR-77,authorizing Operation at Reactor Core Power Levels Not in Excess of 3,411 Megawatts Thermal | 4 March 1997 | Amend 220 to License DPR-77,authorizing Operation at Reactor Core Power Levels Not in Excess of 3,411 Megawatts Thermal | Condition Adverse to Quality Power change |
ML20211K563 | 4 March 1997 | Amend 220 to License DPR-77,authorizing Operation at Reactor Core Power Levels Not in Excess of 3,411 Megawatts Thermal | Condition Adverse to Quality Power change |
ML20196L515 | 24 June 1988 | Amends 73 & 65 to Licenses DPR-77 & DPR-79,respectively, Modifying Paragraph 2.E of Licenses to Require Compliance W/ Amended Physical Security Plan | |
ML20149J993 | 17 February 1988 | Amends 68 & 60 to Licenses DPR-77 & DPR-79,respectively, Revising Tech Spec Surveillance Requirements 4.7.7.e.3 to Allow Up to 1000 Cubic Ft Per Minute Intake of Air During Operation of Control Room Emergency Ventilation Sys | |
ML20147E163 | 7 January 1988 | Amends 64 & 56 to Licenses DPR-77 & DPR-79,respectively, Changing Tech Specs to Increase Diesel Generator Continuous & 2 H Ratings in Surveillance Requirements | |
ML20236F524 | 22 October 1987 | Amends 61 & 53 to Licenses DPR-77 & DPR-79,respectively, Deleting Three Categories of motor-operated Valves from Tech Spec Table 3.8-2 | Safe Shutdown Fire Barrier |