ML20100N565
| ML20100N565 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 03/04/1996 |
| From: | Hebdon F NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20100N569 | List: |
| References | |
| NUDOCS 9603060387 | |
| Download: ML20100N565 (10) | |
Text
__
sY ls p.
i n-t UNITE 3 STATES l
E B
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. EgeeH001 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-3?1 SE000VAH NUCLEAR PLANT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 220 License No. DPR-77 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Tennessee Valley Authority (the licensee) dated January 4, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regul:tions set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commis:: ion's regulations; t
D.
The issuance of this amendment will not be inimical to the commoti defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
l l
I l
9603060387 960304
~
PDR ADOCK 05000327 P
o 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-77 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.220, are hereby incorporated in the i
license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance, to be iglemented within 45 days.
FOR THE NUCLEAR REGULATORY COMMISSION
'n0m
~~
Frederick J. Heb n, Director Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications j
Date of Issuance: March 4, 1996
i 4
a ATTACHMENT TO LICENSE AMENDMENT NO. 2?O I
FACILITY OPERATING LICENSE NO. DPR-77 DOCKET NO. 50-321 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.
1 REMOVE INSERT 3/4 3-35 3/4 3-35 3/4 3-42 3/4 3-42 D
l'
'2
I&BLE 4.3-2 (Continued)-
i ENGJNEERED SAFETY FSATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIF_EMENTS CHANNEL MODES FOR WHICH CHAN'fEL CHANNEL FUNCTIONAL SURVEILLANCE IS FUNCTIONAL UNIT CHEK CALIBRATION TEST REQUIRED 1
3.
CONTAINMENT ISOLATION a.
Phase "A" Isolation
- 1) Manual N.A.
N.A.
R 1, 2, 3,
4 2)
From Safety Injection N.A.
N.A.
M(1) 1, 2,
3, 4
Automatic Actuation Logic b.
Phase "B" Isolation
[
1)
Manual N.A.
N.A.
R 1,
2, 3,
4-
- 2) Automatic Actuation Logic N.A.
N.A.
M(1) 1, 2,
3, 4 3)
Containment Pressure--
S R
Q 1,
2, 3
High-High c.
Containment Ventilation Isolation
- 1) Manual N.A.
N.A.
R 1, 2, 3, 4 R51'
- 2) Automatic Isolation Logic N.A.
N.A.
M(1) 1, 2,
3, 4
L 3)
Containment Purge Air S
R Q
1, 2,
3, 4 f
Exhaust Monitor Radio-activity-High P
f l
SEQUOYAH - UNIT 1 3/4 3-35 Amendment No.'47, 168, 220
TABLE 4.3-3 JtADIATION MONITORING INSTR 12ENTATIQBf SURVIILIANCE REQUIREMENTS CHANNEL MODES FOR WHICH lR116 CHANNEL CHANNEL FUNCTIONAL SURV3ILLANCE IS INSTRUMENT CHECK.
CALIBRATION TEST RE0UIRED 1.
AREA MONITOR lR116 a.
Fuel Storage Pool Area S
R Q
l 2.
PROCESS MONITORS lR116 a.
Containment Purge Air Exhaust S
R Q
1, 2,
3, 4 &6 l
b.
Containment i
i.
Gaseous Activity RCS Leakage Detection S
R Q
1, 2,
3,
&4
.l 11.
Particulate Activity RCS Leskage Detection S
R Q
1, 2,
3,
&4 l
c.
Control Room Isolation S
R Q
ALL MODES l
R116
- With fuel in tne storage pool or building.
SEQUOYAH - UNIT 1 3/4 3-42 Amendment No. 12, 112, 168, 220
y-.
p t
UNITED STATES 3
j NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20066-4001
\\...../
^
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-328 SE000YAH NUCLEAR PLANT. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 210 License No. DPR-79 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Tennessee Valley Authority (the licensee) dated January 4,1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to tne health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's reoulations and all applicable requirements have been satisfied.
1.
- l 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment l
and paragraph 2.C.(2) of Facility Operating License No. DPR-79 is hereby amended to read as follows:
i (2) Technical Specifications l
The Technical Specifications contained in Appendices A and B, as i
reviaed through Amendment No. 210, are hereby incorporated in the license. The licensee shall operate the facility in accordance with j
the Technical Specifications.
l 3.
This license amendment is effective as of its date of issuance, to be implemented within 45 days.
l FOR THE NUCLEAR REGULATORY COMMISSION j
,30 m
s Frederick J. Hebdo, Director l
Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical l
Specifications Date of Issuance: March 4, 1996 l
l I
- l..
ATTACHMENT TO LICENSE AMENDMENT NO. 210 FACILITY OPERATING LICENSE NO. DPR-79 DOCKET NO. 50-328 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.
REMOVE INSERT 3/4 3-35 3/4 3-35 3/4 3-43 3/4 3-43 i
i l
I i
l
TABLE 4.3-2 (Continued)
ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REOUIREMENTS CHANNEL MODES FOR NHICH CHANNEL CHANNEL FUNCTIONAL
. SURVEILLANCE IS FUNCTIONAL UNIT f* HECK CALIBRATION TEST REOUIRE_D 3.
CONTAINMENT ISOLATION a.
Phase "A"
Isolation
- 1) Manual N.A.
N.A.
R 1,
2, 3,
4 2)
From Safety Injection N.A.
N.A.
M (1) 1, 2,
3, 4
Automatic Actuation Logic b.
Phase "B" Isolation R39 1)
Manual N.A.
N.A.
R 1,
2, 3,
4
- 2) Automatic Actuation Logic N.A.
N.A.
M(1) 1, 2,
3, 4
3)
Containment Pressure--
S R
Q 1,
2, 3
High-High c.
L'ontainment Ventilation Isolation R39
- 1) Manual N.A.
N.A.
R 1,
2, 3,
4
- 2) Automatic Isolation Logic N.A.
N.A.
M(1) 1, 2,
3, 4
3)
Containment Purge Air S
R Q
1, 2,
3, 4
Exhaust Monitor Radio-activity-High SEQUOYAH - UNIT 2 3/4 3-35 Amendment Nos. 39. 158, 210
-.. - -.. - _.... - -.. ~ -,,
TABLE 4.3-3 RADIATION MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL MODES FOR WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE IS INSTRUMENT CHECK CALIBRATION TES1,
REQUIRED 1.
AREA MONITOR lR102 a.
Fuel Storage Pool Area S
R Q
l 2.
PROCESS MONI'lVRS lR102 a.
Containment Purge Air Exhaust S
R Q
1, 2, 3, 4&6 l
b.
Containment 1.
Gaseous Activity RCS Leakage Detection S
R Q
1, 2, _3, &4 g
11.
Particulate Activity RCS Leakage Detection S
R Q
1, 2, 3&4 l
c.
Control Room Isolation S
R Q
ALL MODES l
lR102
- With fuel in the storage pool or building.
SEQUOYAH - UNIT 2 3/4 3-43 Amendment Nos. 102, 158, 210
=.
..,-