ML20087L463

From kanterella
Jump to navigation Jump to search
Amends 207 & 197 to Licenses DPR-77 & DPR-79,respectively, Delaying Implementation of Amends 182 & 174 Until Implementation Problems Addressed
ML20087L463
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/22/1995
From: Hebdon F
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20087L465 List:
References
NUDOCS 9508250264
Download: ML20087L463 (16)


Text

.

~

o rtog Al UNITED STATES y-NUCLEAR REGULATORY COMMISSION f

WASHINGTON, D.C. 206624 001

%...../

TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-327 SE0V0YAH NUCLEAR PLANT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 207 License No. DPR-77 1.

The Nuclear Regulatory Comission (the Commission) has found that:

A.

The application for amendment by Tennessee Valley Authority (the licensee) dated May 3, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

%s2gg$hp P

l i

l

i. 2.

Accordingly, Facility Operating Licensee DPR-77 is amended by changing the implementation date of Amendment No.182 to read as follows:

License Amendment 182 is effective as of its date of issuance and is to I

be implemented with the related plant modifications.

3.

Paragraph 2.C.(2) of Facility Operating License No. DPR-77 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 207, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

4.

This license amendment is effective as of its date of issuance, to be implemented with the related plant modifications.

FOR THE NUCLEAR REGULATORY COMMISSION

,[

Frederick J. Hebdoh, Director Project' Directorate 11-3

' Division of Reactor Projects - I/II Office of Nuclear Reactor Fegulation Date of Issuance: August 22, 1995

ATTACHMENT TO LICENSE AMENDMENT NO. 207 FACILITY OPERATING LICENSE NO. DPR-77 DOCKET NO. 50-327 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.

REMOVE INSERT 3/4 3-20 3/4 3-20 3/4 3-21 3/4 3-21 3/4 3-22 3/4 3-22 3/4 3-23 3/4 3-23 3/4 3-23a 3/4 3-23a 3/4 3-27a 3/4 3-27a 3/4 3-27b 3/4 3-27b 3/4 3-32 3/4 3-32 3/4 3-33a 3/4 3-33a 3/4 3-37 3/4 3-37 3/4 3-37a 3/4 3-37a 3/4 3-38 3/4 3-38 B3/4 7-2b B3/4 7-2b l

jy TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION E

MINIMUM c:

TOTAL NO.

CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION

-4 e.

Loss of Power Start 1.

Voltage Sensors 3/ shutdown 2/ shutdown 3/ shutdown 1, 2, 3 35 board **

board **

board **

2.

Load Shed Timer 2/ shutdown 1/ shutdown 2/ shutdown 1, 2, 3 35 board **

board **

board **

f.

Trip of Main Feedwater Pumps u,

Start Motor-Driven is Pumps and Turbine Driven Pump 1/ pump 1/ pump 1/ pump 1, 2 20*

u, E$

g.

Auxiliary Feedwater Suction Pressure-Low 3/ pump 2/ pump 3/ pump 1, 2, 3 21*

g h.

Auxiliary Feedwater Suction Transfer Time 3

R' Delays c

EL 1.

Motor-Driven Pump 1/ pump 1/ pump 1/ pump 1, 2, 3 21*

2.

Turbine-Driven Pump 2/ pump 1/ pump 2/ pump 1, 2, 3 21*

Ba E

9"

    • Unit 1 Shutdown Boards Only o

S

.. +,

w 2

El TABLE 3.3-3 (Continued) iE ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION SE MINIMUM 3E TOTAL NO.

CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION i

7. LOSS OF POWER w

a.

6.9 kv Shutdown Board

--Loss of Voltage 1.

Voltage Sensors 3/ shutdown 2/ shutdown 3/ shutdown 1, 2, 3, 4, 34 board board board 5####, 6ffff 2.

Diesel Generator 2/ shutdown 1/ shutdown 2/ shutdown 1, 2, 3, 4 34 Start and Load board board board 5ffff, 6ffff Shed Timer de b.

6.9 kv Shutdown Board Degraded Voltage w

di 1.

Voltage Sensors 3/shutdor.n 2/ shutdown 3/ shutdown 1, 2, 3, 4 34 board board board 5####, 6ffff g-2.

Diesel Generator 2/ shutdown 1/ shutdown 2/ shutdown 1, 2, 3, 4 34 m

Start and Load board board board 5ffff, 6ffff El Shed Timer R

E' 3.

SI/ Degraded 2/ shutdown 1/ shutdown 2/ shutdown 1, 2, 3, 4 34 me Voltage Logic board board board P

Enable Timer

$5 8.

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INTERLOCKS a.

Pressurizer Pressure -

3 2

2 1,2,3 22a gg;-

P-II/Not P-ll n,

b.

Deleted

!EES c.

Steam Generator 3/ loop 2/ loop 3/ loop 1, 2 22c Level P-14 any loop to S

?

z.'

TABLE 3.3-3 (Continued) l TABLE NOTATION

  1. Trip function may be bypassed in this MODE below P-11 (Pressurizer Pressure Block of Safety Injection) setpoint.
    1. Trip function automatically blocked above P-11 and may be blocked below j

P-11 when Safety Injection on Steam Line Pressure-Low is not blocked.

      1. The channel (s) associated with the protective functions derived from the 1

out of service Reactor Coolant Loop shall be placed in the tripped mode.

i

        1. When Associated Diesel Generator is required to be OPERABLE By LCO 3.8.1.2, "AC Sources-Shutdown." The Provisions of Specification 3.0.4 are not a)plicable, j
  • Tie provisions of Specification 3.0.4 are not applicable.

ACTION STATEMENTS I

ACTION 15 -

With the number of OPERABLE Channels one less than the Total Number of Channels, be in at least HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance test-ing per Specification 4.3.2.1.1 provided the other channel is OPERABLE.

j ACTION 16 -

Deleted.

1 ACTION 17 -

With the number of OPERABLE Channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following condi,tions are satisfied:

a.

The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

The Minimum Channels OPERABLE requirements is met; however, the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.1.

ACTION 18 -

With the number of OPERABLE Channels one less than the Total 4

l Number of Channels, operation may proceed provided the inoper-i able channel is placed in the bypassed condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and the Minimum Channels OPERABLE requirement is met; one addi-tional channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveil-1 lance testing per Specification 4.3.2.1.1.

i' ACTION 19 -

With less than the Minimum Channels OPERABLE, operation may l

continue provided the containment purge supply and exhaust valves are maintained closed.

ACTION 20 -

With the number of OPERABLE Channels one less than the Total l

Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

i SE()UOYAH - UNIT 1 3/4 3-22 Amendment No. 63, 141, 168, 182, 188, 202, 207 l

TABLE 3.3-3 (Continued)

ACTION 21 -

With less than the Minimum Number of Channels OPERABLE, declare the associated auxiliary feedwater pump inoperable, and comply with the ACTION requirements of Specification 3.7.1.2.

ACTION 22 -

With less than the Minimum Number of Channels OPERABLE, declare the interlock inoperable and verify that all affected channels of the functions listed below are OPERABLE or apply the appro-priate ACTION statement (s) for those functions.

Functions to be evaluated are:

a.

Safety Injection Pressurizer Pressure Steam Line Pressure Negative Steam Line Pressure Rate b.

Deleted c.

Turbine Trip Steam Generator Level High-High Feedwater Isolation Steam Generator Level High-High ACTION 23 -

With the number of OPERABLE channels one less than the Total Number of Channels, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1.1.

ACTION 24 -

With the number of OPERABLE' channels one less than the Total Number of Channels, ' restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least H0T SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

ACTION 25 -

With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoserable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or declare tie associated valve inoper-able and take the ACTION required by Specification 3.7.1.5.

ACTION 34 -

a.

With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or enter applicable Limiting Condition (s) For Operation and Action (s) for the associated diesel generator set made inoperable by the channel.

b.

With the number of OPERABLE channels less than the Total Number of Channels by more than one, restore all but one channel to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or enter applicable Limiting Condition (s) for Operation and Action (s) for the associated diesel generator set made inoperable by the channels.

SEQUOYAH - UNIT 1 3/4 3-23 Amendment No. 12, 63, 129, 141, 160, 182, 188, 207

TABLE 3.3-3 (Continued)

' ACTION 35 -

a.

With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or enter applicable Limiting Condition (s) For Operation and Action (s) for the associated auxiliary feedwater pump made inoperable by the channel.

b.

With the number of OPERABLE channels less than the Total Number of Channels by more than one, restore all but one channel to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or enter appli-cable Limiting Condition (s) For Operation and Action (s) by for the associated auxiliary feedwater pump made inoperable the channel.

ACTION 36 -

With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a.

The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

For the affected protection set, the Trip Time Delay for one affected steam generator (T ) is adjusted to match the Tri ) Time Delay for multiple affected steam generators (T,)

wit 11n 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

c.

The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Spect-fication 4.3.2.1.1.

ACTION 37 -

With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided that within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, for the affected protection set, and T threshold power level for zero the Trip Time Delays (Tseconds time delay is abjuste[)to 0% RTP.

ACTION 38 -

With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided that within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, for the affected protection set, the Steam Generator Water Level - Low-Low (EAM) channels trip setpoint 't adjusted to the same value as Steam Generator Water Level - Low-Low (Adverse).

SEQUOYAH - UNIT 1 3/4 3-23a Amendment No. 141, 160, 182, 188, 207

TABLE 3.3-4 (Continued) m E:

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS g

FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES x

i 11.

RCS Loop AT Equivalent to g

Power > 50% RTP Coincident with Steam 215.0% of narrow range 214.4% of narrow

~

Generator Water Level--

instrument span range instrument span Low-Low (Adverse) and Containment Pressure (EAM) so.5 psig s0.6 psig or Steam Generator Water 210.7% of narrow range 210.1% of narrow range Level--Low-Low (EAM) instrument span instrument span d.

S.I.

See 1 above (all SI Setpoints) e.

Station Blackout 0 volts with a 5.0 second 0 volts with a 5.0 i 1.0 second time delay time delay w

f.

Trip of Main Feedwater N.A.

N.A.

Pumps g.

Auxiliary Feedwater Suction 2 3.21 psig (motor driven pump) 2 2.44 psig (motor driven pump)

Pressure-Low 2 13.9 psig (turbine driven 2 12 psig (turbine driven pump) pump) d h.

Auxiliary Feedwater Suction 4 seconds (motor driven pump) 4 seconds 10.4 seconds yg Transfer Time Delays (motor driven pump) o 0;"

5.5 seconds (turbine driven 5.5 seconds 10.55 seconds 75 pump)

(turbine driven pump) n w.

8

~

f TABLE 3.3-4 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS 8

FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES E

i 7.

LOSS OF POWER c

i a.

6.9 kv Shutdown Board Undervoltage j

Loss of Voltage

~

1.

Voltage Sensors 25520 volts 25472 volts 2.

Diesel Generator Start and Load Shed Timer 1.25 seconds 1.25 10.09 seconds b.

6.9 kv Shutdown Board-Degraded Voltage 1.

Voltage Sensors 6456 volts 26403.5 volts (dropout) s6626.5 volts (reset) b 2.

Diesel Generator Start and Load Shed Timer

$300 seconds

$321 seconds k

3.

SI/Dagraded Voltage Logic g

Enable Timer 10 seconds 10 seconds i 0.75 seconds 8.

ENGINEERED SAFETY FEATURE ACTUATION SYSTEN INTERLOCKS

,o t

a.

Pressurizer Pressure j

l.

Not P-II, Automatic Unblock s 1970 psig s 1975.2 psig of Safety Injection on Increasing Pressure

)

~

2.

P-II, Enable Manual Block of 2 1962 psig 2 1956.8 psig Safety Injection on Decreasing

_g Pressure

$~~

8

~

4 i

i

[

l i

L This Page Intentionally Deleted 1

i I

l

?

a 4

1 I

1 SEQUOYAH - UNIT 1.

3/4 3-32 Amendment No. 29. 77, 82, 168, 182, 188, 190, 207 w.

i i

)

1 i

i i

i i

a 1

This Page Intentionally Deleted 4

4 l

SEQUOYAH - UNIT 1 3/4 3-33a Amendment No. 29, 55, 77, 82, 106, 141, 182, 188, 190, 207 j

.y

1 TABLE 4.3-2 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS mE 8

CHANNEL MODES FOR WHICH 3ll CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE

=

FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED I

c c.

Main Steam Generator Water Level--Low-Low

~

~

1.

Steam Generator Water S

R Q

1, 2, 3 Level--Low-Low (Adverse) 2.

Steam Generator Water S

R Q

1, 2, 3 Level--Low-Low (EM) 3.

RCS Loop AT S

R Q

1, 2, 3 4.

Containment Pressure S

R Q

1, 2, 3 (EAM) d.

S.I.

See 1 above (all SI surveillance requirements)

[

e.

Loss of Power Start 1.

Voltage Sensors N.A.

R M

1, 2, 3 g

2.

Load Shed Timer N.A.

R N.A.

1, 2, 3 g-f.

Trip of Main Feedwater N.A.

N.A.

R 1, 2 g

Pumps e

2 g.

Auxiliary Feedwater Suction N.A.

R M

1, 2, 3

.o Pressure-Low h.

Auxiliary Feedwater Suction N.A.

R N.A.

1, 2, 3 Transfer Time Delays

~

7.

LOSS OF POWER a.

6.9 kv Shutdown Board -

Loss of Voltage

~

gg 1.

Voltage Sensors N.A.

R M

1, 2, 3, 4, 5#, 6#

.co -

2.

Diesel Generator Start N.A.

R N.A.

1, 2, 3, 4, 5#, 6#

and Load Shed Timer n

S

TABLE 4.3-2 (Continued)

N ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION y

SURVEILLANCE REQUIREMENTS h

CHANNEL MODES FOR WHICH i

CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED e5 b.

6.9 kv Shutdown Board -

Degraded Voltage

~

1.

Voltage sensors N.A.

R M

1, 2, 3, 4, 5f, 6#

2.

Diesel Generators N.A.

R N.A.

1,2,3,4,5#,6#

Start and Load Shed Timer 3.

SI/ Degraded Voltage N.A.

R N.A.

1, 2, 3, 4 Logic Enable Timer 8.

ENGINEERED SAFETY FEATURE

[

ACTUATION SYSTEM INTERLOCKS

~

a.

Pressurizer Pressure, N.A.

R(2)

N.A.

1, 2, 3 P-ll/Not P-11 b.

Deleted o.

R c.

Steam Generator N.A.

R(2)

N.A.

1, 2 5

Level, P-14 z

?

9.

AUTOMATIC SWITCHOVER TO CONTAINMENT SUMP a.

RSWT Level - Low S

R Q

1, 2, 3, 4 COINCIDENT WITH w

Containment Sump Level - High S

R Q

1, 2, 3, 4

-m AND

,E

  • Safety Injection (See I above for all Safety Injection Surveillance Requirements)

-g*

b.

Automatic Actuation Logic N.A.

N.A.

M(1) 1, 2, 3, 4 I$

TABLE 4.3-2 (Continued)

TABLE NOTATION When associated diesel generator is required to be OPERABLE by LCO 3.8.1.2, "AC Sources - Shutdown."

(1)

Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS.

(2) The total interlock function shall be demonstrated OPERABLE during CHANNEL CALIBRATION testing of each channel affected by interlock operation.

l SEQUOYAH - UNIT 1 3/4 3-38 Amendment No. 47, 182, 188, 207 l

- =

PLANT SYSTEMS BASES

]

which are designated as Train A, receive A-train air, and provide flow to the l

same steam generators that are supplied by the B-train motor-driven auxiliary feedwater pump.

The remaining two LCVs are designated as Train 8, receive B-train air, and provide flow to the same steam generators that are supplied by the A-train motor-driven pump. This design provides the required redundancy to ensure that at least two steam generators rer e the necessary flow assuming any single failure.

It can be seen from th cription provided above that the loss of a single train of air (A or B) not prevent the auxiliary feed-water system from performing its intended sa.ety function and is no more severe than the loss of a single auxiliary feedwater pump. Therefore, the loss of a single train of auxiliary air only affects the capability of a single motor-driven auxiliary feedwater pump because the turbine-driven pump is still casable of providing flow to two steam generators that are separate from the ot1er motor-driven pump.

Two redundant steam sources are required to be operable to ensure that at least one source is available for the steam-driven auxiliary feedwater (AFW) pump operation following a feedwater or main steam line break. This require-ment ensures that the plant remains within its design basis (i.e., AFW to two intact steam generators) given the event of a loss of the No. I steam generator because of a main steam line or feedwater line break and a single failure of the B-train motor driven AFW pump. The two redundant sources must be aligned such that No. I steam generator source is open and operable and the No. 4 steam generator source is closed and operable.

For instances where one train of emergency raw cooling water (ERCW) is declared inoperable in accordance with technical specifications, the AFW turbine-driven pump is considered operable since it is supplied by both trains of ERCW. Similarly, the AFW turbine-driven pump is considered operable when one train of the AFW loss of power start function is declared inoperable in accordance with technical specifications because both 6.9 kilovolt shutdown board logic trains supply this function.

This position is consistent with American National Standards Institute /ANS 58.9 requirements (i.e., postulation 4

of the failure of the opposite train is not required while relying on the TS limiting condition for operation).

3/4.7.1.3 CONDENSATE STORAGE TANK The OPERABILITY of the condensate storage tank with the minimum water i

volume ensures that sufficient water is available to maintain the RCS at HOT STANDBY conditions for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> with steam discharge to the atmosphere concur-rent with total loss of off-site power. The contained water volume limit includes an allowance for water not useable because of tank discharge line location or other physical characteristics.

I i

4 i

SEQUOYAH - UNIT 1 B 3/4 7-2b Amendment No. 115, 155, 182, 188, 196,207

pnuco ye

-14 UNITED STATES j

j NUCLEAR REGULATORY COMMISSION WASHINGTON D.C. 20665-0001 o

49 * * *,.,o TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-328 SE000YAH NUCLEAR PLANT. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.197 License No. DPR-79 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Tennessee Valley Authority (the licensee) dated May 3, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the j

provisions of the Act, and the rules and regulations of the i

Commission; C.

There is reasonable assur,ance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

)

I

l.

l 2.

Accordingly, Facility Operating Licensee DPR-79 is amended by changing the implementation date of Amendment No.174 to read as follows:

License Amendment 174 is effective as of its date of issuance and is to be implemented with the related plant modifications.

3.

Paragraph 2.C.(2) of Facility Operating License No. DPR-79 is hereby amended to read as follows:

(2) Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.197, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

4.

This license amendment is effective as of its date of issuance, to be implemented with the related plant modifications.

FOR THE NUCLEAR REGULATORY COMMISSION 1

Frederick J. Hebd n, Director l

Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Date of Issuance:

August 22, 1995

ATTACHMENT TO LICENSE AMENDMENT NO. 197 FACILITY OPERATING LICENSE NO. DPR-79 DOCKET NO. 50-328 i

Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.

REMOVE INSERT 3/4 3-20 3/4 3-20 2

3/4 3-21 3/4 3-21 3/4 3-22 3/4 3-22 l

3/4 3-23 3/4 3-23 3/4 3-23a 3/4 3-23a

)

3/4 3-27a 3/4 3-27a 1

3/4 3-27b 3/4 3-27b 3/4 3-32 3/4 3-32 3/4 3-33a 3/4 3-33a 3/4 3-37 3/4 3-37 3/4 3-38 3/4 3-38 3/4 3-39 3/4 3-39 B3/4 7-2b B3/4 1-2b

TABLE 3.3-3 (Continued) u, E

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION 8

EE MINIMUM TOTAL NO.

CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION E

3 e.

Loss of Power Start m

1.

Voltage Sensors 3/ shutdown 2/ shutdown 3/ shutdown 1, 2, 3 35 board **

board **

board **

2.

Load Shed Timer 2/ shutdown 1/ shutdown 2/ shutdown 1, 2, 3 35 board **

board **

board **

f.

Trip of Main Feedwater Pumps Start Motor-Driven 4"

Pumps and Turbine Driven Pump 1/ pump 1/ pump 1/ pump 1, 2 20*

Y E!

g.

Auxiliary Feedwater Suction Pressure-Low 3/ pump 2/ pump 3/ pump 1, 2, 3 21*

Br h.

Auxiliary Feedwater Suction Transfer j[

Time Delays

=

c' 1.

Motor-Driven jf Pump 1/ pump 1/ pump 1/ pump 1, 2, 3 21=

Ql 2.

Turbine-Driven Pump 2/ pump 1/ pump 2/ pump 1, 2, 3 21*

.E ll l

E o

G

    • Unit 2 Shutdown Boards Only

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION y,

E8 MINIMUM TOTAL NO.

CHANNELS CHANNELS APPLICABLE f

FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION E

7. LOSS OF POWER R

a.

6.9 kv Shutdown Board m

--Loss of Voltage 1.

Voltage Sensors 3/ shutdown 2/ shutdown 3/ shutdown 1, 2, 3, 4, 34 board board board 5f###, 6ffff 2.

Diesel Generator 2/ shutdown 1/ shutdown 2/ shutdown 1, 2, 3, 4 34 Start and Load board board board 5f#ff, 6ffff Shed Timer R

b.

6.9 kv Shutdown Board Degraded Voltage YZ l.

Voltage Sensors 3/ shutdown 2/ shutdown 3/ shutdown 1, 2, 3, 4 34 board board board Si###, 6####

2.

Diesel Generator 2/ shutdown 1/ shutdown 2/ shutdown 1, 2, 3, 4 34 Start and Load board board board 5ffff, 6ffff g

Shed Timer Eo-3.

SI/ Degraded 2/ shutdown 1/ shutdown 2/ shutdown 1, 2, 3, 4 34 Voltage Logic board board board Enable Timer E.

f

_o.O

!~

TABLE 3.3-3 (Continued)

TABLE NOTATION

  1. Trip function may be bypassed in this MODE below P-11 (Pressurizer Pressure Block of Safety Injection) setpoint.
    1. Trip function automatically blocked above P-1* nd may be blocked below P-11 when Safety Injection on Steam Line Pressure-Low is not blocked.
      1. The channel (s) associated with the protective functions derived from the out of service Reactor Coolant Loop shall be placed in the tripped mode.
        1. When Associated Diesel Generator is required to be OPERABLE By LCO 3.8.1.2, "AC Sources-Shutdown." The Provisions of Specification 3.0.4 are not applicable.
  • The provisions of Specification 3.0.4 are not applicable.

ACTION STATEMENTS ACTION 15 -

With the number of OPERABLE Channels one less than the Total Number of Channels, be in HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance tes;-

ing per Specification 4.3.2.1.1 provided the other channel is OPERABLE.

ACTION 16 -

Deleted.

ACTION 17 -

With the number of OPERABLE Channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a.

The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

The Minimum Channels OPERABLE requirements is met; however, the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.1.

ACTION 18 -

With the number of OPERABLE Channels one less than the Total Number of Channels, operation may proceed provided the inoper-able channel is placed in the bypassed condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and the Minimum Channels OPERABLE requirement is met; one addi-tional channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveil-lance testing per Specification 4.3.2.1.1.

ACTION 19 -

With less than the Minimum Channels OPERABLE, operation may continue provided the containment purge supply and exhaust valves are maintained closed.

ACTION 20 -

With the number of OPERABLE Channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SEQUOYAH - UNIT 2 3/4 3-22 Amendment No. 55, 132, 158, 174, 180, 192, 197 J

i i.

TABLE 3.3-3 (Continued)

ACTION 21 -

With less than the Minimum Number of Channels OPERABLE, declare the associated auxiliary feedwater pump inoperable, and comply j

with the ACTION requirements of Specification 3.7.1.2.

]

ACTION 22 -

With less than the Minimum Number of Channels OPERABLE, declare 3

the interlock inoperable and verify that all affected channels 4

of the functions listed below are OPERABLE or apply the appro-priate ACTION statement (s) for those functions.

Functions to be evaluated are:

a.

Safety Injection Pressurizer Pressure Steam Line Pressure i

Negative Steam Line Pressure Rate f

b.

Deleted i

i c.

Turbine Trip 4

Steam Generator Level High-High Feedwater Isolation Steam Generator Level High-High 4

ACTION 23 -

With the number of OPERABLE channels one less than the Total i

Number of Channels, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> i

and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for i

surveillance testing per Specification 4.3.2.1.1.

ACTION 24 -

With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE j

status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within i

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

l ACTION 25 -

With the number of OPERABLE channels one less than the Total l

Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or declare the associated valve inoper-l able and take the ACTION required by Specification 3.7.1.5.

i ACTION 34 -

a.

With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to 3

l OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or enter applicable Limiting Condition (s) For Operation and Action (s) for the associated diesel generator set made inoperable by the channel.

1 j

b.

With the number of OPERABLE channels less than the Total Number of Channels by more than one, restore all but one i

channel to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or enter applicable Limiting Condition (s) for Operation and Action (s) for the associated diesel generator set made inoperable by the channels.

SEQUOYAH - UNIT 2 3/4 3-23 Amendment No. 55, 116, 132, 150, i

174, 180, 197 i

--,r

l~

TABLE 3.3-3 (Continued)

ACTION 35 -

a.

With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or enter applicable Limiting i

Condition (s) For Operation and Action (s) for the associated

{

auxiliary feedwater pump made inoperable by the channel.

4 b.

With the number of OPERABLE channels less than the Total Number of Channels by more than one, restore all but one channel to OPERABLE status within I hour or enter appli-cable Limiting Condition (s) For Operation and Action (s) for j

the associated auxiliary feedwater pump made inoperable by i

the channel.

}

ACTION 36 -

With the nuniber of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed i

I provided the following conditions are satisfied:

a.

The inoperable channel is placed in the tripped condition j

within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

j b.

For the affected protection set, the Trip Time Delay for one affected steam generator (T ) is adjusted to match the t

Trip Time Delay for multiple affected steam generators (T,)

j within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

t i

c.

The Minimum Channels OPERABLE requirement is met; however, i

the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> l

for surveillance testing of other channels per Speci-fication 4.3.2.1.1.

1 1

ACTION 37 -

With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed i

provided that within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, for the affected protection set, and T threshold power level for zero the Trip Time Delays (T,djuste[)to 0% RTP.

seconds time delay is a i

ACTION 38 -

With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed i

provided that within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, for the affected protection set, the Steam Generator Water Level - Low-Low (EAM) channels trip setpoint is adjusted to the same value as Steam Generator Water i

Level - Low-Low (Adverse).

i i

i 1

4 i

SEQUOYAH - UNIT 2 3/4 3-23a Amendment No. 132, 150, 174, 180, 197

TABLE 3.3-4 (Continued) b ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS 8

g FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES

11. RCS Loop AT Equivalent to E

Power > 50% RTP 1

Q Coincident with Steam 215.0% of narrow range 214.4% of narrow m

Generator Water Level--

instrument span range instrument span Low-Low (Adverse) i and Containment Pressure (EAM) 50.5 psig so.6 psig or l

Steam Generator Water 210.7% of narrow range 210.1% of narrow range Level--Low-Low (EAM) instrument span instrument span d.

S.I.

See I above (all SI Setpoints)

^

e.

Station Blackout 0 volts with a 5.0 second 0 volts with a 5.0 i 1.0 second

[

time delay time delay f.

Trip of Main Feedwater N.A.

N.A.

Pumps g.

Auxiliary Feedwater Suction 2 3.21 psig (motor driven pump) 2 2.44 psig (motor driven pump)

Pressure-Low 2 13.9 psig (turbine driven 2 12 psig (turbine driven pump) pump)

F h.

Auxiliary Feedwater Suction 4 seconds (motor driven pump) 4 seconds 10.4 seconds Transfer Time Delays (motor driven pump)

E 5.5 seconds (turbine driven 5.5 seconds 10.55 seconds O2 pump)

(turbine driven pump)

~

g.N

l l

TABLE 3.3-4 (Continued) vs

.E ENGINEERED SAFETY FEATURE ACTUATION SYSTEN INSTRUMENTATION TRIP SETPOINTS 8

l g

FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES 7.

LOSS OF POWER EQ a.

6.9 kv Shutdown Board Undervoltage Loss of Voltage m

1.

Voltage Sensors 25520 volts 25472 volts 2.

Diesel Generator Start and Load Shed Timer 1.25 seconds 1.25 10.09 seconds b.

6.9 kv Shutdown Board-Degraded Voltage 1.

Voltage Sensors 6456 volts 26403.5 volts (dropout) s6626.5 volts (reset)

.~

2.

Diesel Generator Start and Load Shed Timer s300 seconds s321 seconds l

g 3.

SI/ Degraded Voltage Logic Enable Timer 10 seconds 10 seconds i 0.75 seconds

=

8.

ENGINEERED SAFETY FEATURE a"

ACTUATION SYSTEM INTERLOCKS E

a.

Pressurizer Pressure l.

Not P-11, Automatic Unblock

$ 1970 psig s 1975.2 psig i

D1 of Safety Injection on Increasing Pressure 5.5 2.

P-11, Enable Manual Block of 2 1962 psig 2 1956.8 psig l

Safety Injection on Decreasing g,M Pressure l

G

~

m 4

This Page Intentionally Deleted SEQUOYAH - UNIT 2 3/4 3-32 Amendment No. 18, 68, 158, 174, 180,182,197 l

u l

1 This Page Intentionally Deleted 4

SEQUOYAH - UNIT 2 3/4 3-33a Amendment No. 18,-47, 68, 73, 96, 132, 174, 180, 182, 197 i

TABLE 4.3-2 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS h

CHANNEL MODES FOR WHICH g

CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED E

c.

Main Steam Generator Water j

Level--Low-Low

[

1.

Steam Generator Water S

R Q

1, 2, 3 Level--Low-Low (Adverse) 2.

Steam Generator Water S

R Q

1, 2, 3 Level--Low-Low (EAM) 3.

RCS Loop AT S

R Q

1, 2, 3 4.

Containment Pressure S

R Q

1, 2, 3 (EAM)

}

g d.

S.I.

See 1 above (all SI surveillance requirements)-

)

l e.

Loss of Power Start I

w 1.

Voltage Sensors N.A.

R M

1, 2, 3 j

2.

Load Shed Timer N.A.

R N.A.

1, 2, 3 f.

Trip of Main Feedwater N.A.

N.A.

R 1, 2

[

Pumps

=

g g.

Auxiliary Feedwater Suction N.A.

R M

1, 2, 3 Pressure-Low s

z h.

Auxiliary Feedwater Suction N.A.

R N.A.

1, 2, 3 Transfer Time Delays 7.

LOSS OF POWER

.h a.

6.9 kv Shutdown Board -

Loss of Voltage EU

,_p 1.

Voltage Sensors N.A.

R M

1, 2, 3, 4, 5#, 6#

e 2.

Diesel Generator Start N.A.

R N.A.

1, 2, 3, 4, 5#, 6#

and Load Shed Timer I

__s

t TABLE 4.3-2 (Continued) i un i

E ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION k

SURVEILLANCE REQUIREMENTS m

CHANNEL MODES FOR WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE E

FUNCTIONAL UNIT CHFCK CALIBRATION TEST REQUIRED w

N b.

6.9 kv Shutdown Board -

Degraded Voltage 1.

Voltage sensors N.A.

R M

1, 2, 3, 4, Si, 6#

2.

Diesel Generators N.A.

R N.A.

1,2,3,4,Si,6#

Start and Load Shed Timer 3.

SI/ Degraded Voltage N.A.

R N.A.

1, 2, 3, 4 Logic Enable Timer

[

8.

ENGINEERED SAFETY FEATURE

=

ACTUATION SYSTEM INTERLOCKS a.

Pressurizer Pressure, N.A.

R(2)

N.A.

1, 2, 3 k

P-11/Not P-ll

=

[

b.

Deleted i

s

[

c.

Steam Generator N.A.

R(2)

N.A.

1, 2 Level, P-14 o

5 9.

AUTOMATIC SWITCHOVER TO CONTAINMENT SUMP m

a.

RSWT Level - Low S

R Q

1, 2, 3, 4 t

COINCIDENT WITH

--y*

Containment Sump Level - High S

R Q

1, 2, 3, 4 AND y,"

Safety Injection (See 1 above for all Safety Injection Surveillance Requirements) b.

Automatic Actuation Logic N.A.

N.A.

M(1) 1, 2, 3, 4 g

m

i.

1.

b' TABLE 4.3-2 (Continued)

TABLE NOTATION When associated diesel generator is required to be OPERABLE b:/ LCO 3.8.1.2, "AC Sources - Shutdown."

(1) Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS.

(2) The total interlock function shall be demonstrated OPERABLE during CHANNF.L CALIBRATION testing of each channel affected by interlock operation.

SEQUOYAH - UNIT 2 3/4 3-39 Amendment No. 39,174,180,197 l

f PLANT SYSTEMS BASES i

j train air, and provide flow to the same steam generators that are supplied by the A-train motor-driven pump. This design provides the required redundancy to i

ensure that at least two steam generators receive the necessary flow assuming any single failure.

It can be seen from the description provided above that the loss of a single train of air (A or B) will not prevent the auxiliary feed-i water system from performing its intended safety function and is no more severe j

than the loss of a single auxiliary feedwater pump. Therefore, the loss of a single train of auxiliary air only affects the capability of a single motor-4 driven auxiliary feedwater pump because the turbine-driven pump is still capable of providing flow to two steam generators that are separate from the other motor-driven pump.

Two redundant steam sources are required to be operable to ensure that at i

least one source is available for the steam-driven auxiliary feedwater (AFW) j pump operation following a feedwater or main steam line break. This require-ment ensures that the plant remains within its design basis (i.e., AFW to two intact steam generators) given the event of a loss of the No. I steam generator l

because of a main steam line or feedwater line break and a single failure of the B-train motor driven AFW pump.

The two redundant sources must be aligned such that No.1 steam generator source is open and operable and the No. 4 steam generator source is closed and operable.

l For instances where one train of emergency raw cooling water (ERCW) is declared inoperable in accordance with technical specifications, the AFW turbine-driven pump is considered operable since it is supplied by both trains of ERCW. Similarly, the AFW turbine-driven pump is considered operable when one train of the AFW loss of power start fonction is declared inoperable in accordance with technical specifications because both 6.9 kilovolt shutdown board logic trains supply this function. This position is consistent with American National Standards Institute /ANS 58.9 requirements (i.e., postulation of the failure of the opposite train is not required while relying on the TS limiting condition for operation).

3/4.7.1.3 CONDENSATE STORAGE TANK The OPERABILITY of the condensate storage tank with the minimum water volume ensures that sufficient water is available to maintain the RCS at HOT STANDBY conditions for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> with steam discharge to the atmosphere concur-rent with total loss of off-site power. The contained water volume limit includes an allowance for water not useable because of tank discharge line location or other physical characteristics.

SEQUOYAH - UNIT 2 B 3/4 7-2b Amendment No. 105, 174, 180, l

187, 197 i

.