Amends 189 & 181 to Licenses DPR-77 & DPR-79 Respectively, Incorporating Clarifications Re Evaluation of SG Tube Defects
ML20078B639
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/20/1994
From: Hebdon F
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20078B640 List:
References
NUDOCS 9410260170
Download: ML20078B639 (12)


Text

.-

l fa arog

[

t UNITED STATES i

g g

NUCLEAR REGULATORY COMMISSION 3

1 1"

WASHINGTON, D.C. 20555-0001 o

\\...../

TENNESSEE VALLEY AUTHORITY DSCKET NO. 50-327 SE0VOYAH NUCLEAR PLANT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE 1

Amendment No. 189 License No. DPR-77 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Tennessee Valley Authority (the licensee) dated September 8, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9410260170 941020 PDR ADOCK 05000327 P

PDR l

{*

i 4 '

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-77 is hereby amended to read as follows:

(2) Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.189, are hereby incorporated in l

the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance, to be implemented prior to Unit 2 entry into Mode ?. from the Cycle 6 refueling outage.

FOR THE NUCLEAR REGULATORY COMMISSION l

l b n

Frederick J. Hebdon, Director Project Directorate 11-4 l

Division of Reactor Projects - I/II l

Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: October 20, 1994

ATTACHMENT TO LICENSE AMENDMENT N0.189 FACILITY OPERATING LICENSE NO. DPR-77 DOCKET NO. 50-327 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.

BEBQYE INSERT 3/4 4-7 3/4 4-7 3/4 4-9 3/4 4-9 B3/4 4-3 B3/4 4-3 9

REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued) 3.

A tube inspection (pursuant to Specification 4.4.5.4.a.8) shall be performed on each selected tube.

If any selected tube does not permit the passage of the eddy current probe for a tube inspection, this shall be recorded and an adjacent tube shall be selected and subjected to a tube inspection.

c.

The tubes selected as the second and third samples (if required by Table 4.4-2) during each inservice inspection may be subjected to a 4

partial tube inspection provided:

1.

The tubes selected for these samples include the tubes from those areas of the tube sheet array where tubes with imperfec-tions were previously found.

2.

The inspections include those portions of the tubes where imperfections were previously found.

NOTE:

Tube degradation identified in the portion of the tube that is not a reactor coolant pressure boundary (tube end up to the start of the tube-to-tubesheet weld) is excluded from the Result and Action Required in Table 4.4-2.

The results of each sample inspection shall be classified into one of the following three categories:

Cateaory Insoection Results C-1 Less than 5% of the total tubes inspected are degraded tubes and none of the inspected tubes are defective.

C-2 One or more tubes, but not more than 1% of the total tubes inspected are defective, or between 5% and 10%

of the total tubes inspected are degraded tubes.

C-3 More than 10% of the total tubes inspected are degraded 1

tubes or more than 1% of the inspected tubes are defective.

Note:

In all inspections, previously degraded tubes must exhibit significant (greater than 10%) further wall penetrations to be included in the above percentage calculations.

SEQU0YAH - UNIT 1 3/4 4-7 Anendnent No. 189

REACTOR COOLANT SYSTEM SURVEILLANCE RE0VIREMENTS (Continued) 4.4.5.4 Acceptance CriterLa a.

As used in this Specification:

1.

Imoerfection means an exception to the dimensions, finish or contour of a tube from that required by fabrication drawings or specifications.

Eddy-current testing indications below 20% of the nominal tube wall thickness, if detectable, may be con-sidered as imperfections.

2.

Dearadation means a service-induced cracking,

wastage, wear or general corrosion occuring or either inside or outside of a tube.

3.

Dearaded Tube means a tube containing imperfections greater than or equal to 20% of the nominal wall thickness caused by degradation.

4.

% Dearadation means the percentage of the tube wall thickness affected or removed by degradation.

5.

Defect means an imperfection of such severity that it exceeds the plugging limit. A tube containing a defect is defective.

6.

Plucaina Limit means the imperfection depth at or beyond which the tube shall be removed from service and is equal to 40% of the nominal tube wall thickness.

Plugging limit does not apply to that portion of the tube that is not within the pressure boundary of the reactor coolant system (tube end up to the start of the tube-to-tubesheet weld).

7.

Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to affect its structural integrity in the event of an Operating Basis Earthquake, a loss-of-coolant accident, or a steam line or feedwater line break as specified in 4.4.5.3.c, above.

8.

Tube Inspection means an inspection of the steam generator tube from the point of entry (hot leg side) completely around the U-bend to the top support of the cold leg.

9.

Preservice Inspection means a tube inspection of the full length of each tube in each steam generator performed by eddy current techniques prior to service establish a baseline con-dition of the tubing. This inspection shall be performed prior to initial POWER OPERATION using the equipment and techniques expected to be used during subsequent inservice inspections.

Amendment No. 189 SEQUOYAH - UNIT 1 3/4 4-9

REACTOR COOLANT SYSTEM l

BASES

(

The plant is expected to be operated in a manner such that the secondary coolant will be maintained within those chemistry limits found to result in negligible corrosion of the steam generator tubes.

If the secondary coolant I

chemistry is not maintained within these limits, localized corrosion may likely result in stress corrosion cracking. The extent of cracking during plant operation would be limited by the limitation of steam generator tube leakage between the primary coolant system and the secondary coolant system (primary-to-secondary leakage - 500 gallons per day per steam generator).

Cracks having a primary-to-secondary leakage less than this limit during operation will have an adequate margin of safety to withstand the loads imposed during normal operation and by postulated accidents. Operating plants have demonstrated that primary-to-secondary leakage of 500 gallons per day per l

steam generator can readily be detected by radiation monitors of steam j

generator blowdown.

Leakage in excess of this limit will require plant shutdown and an unscheduled inspection, during which the leaking tubes will be located and plugged.

Wastage-type defects are unlikely with proper chemistry treatment of the secondary coolant.

However, even if a defect should develop in service, it will be found during scheduled inservice steam generator tube examinations.

Plugging will be required for all tubes with imperfections exceeding the plugging limit of 40% of the tube nominal wall thickness. The portion of the tube that the plugging limit does not apply to is the portion of the tube that is not within the RCS pressure boundary (tube end up to the start of the tube-to-tubesheet weld). The tube end to tube-to-tubesheet weld portion of the tube does not affect structural integrity of the steam generator tubes and therefore indications found in this portion of the tube will be excluded from the Result and Action Required for tube inspections.

It is expected that any indications l

that extend from this region will be detected during the scheduled tube l

inspections.

Steam generator tube inspections of operating plants have demonstrated the capability to reliably detect degradation that has penetrated 20% of the original tube wall thickness.

Whenever the results of any steam generator tubing inservice inspection fall into Category C-3, these results will be promptly reported to the i

Commission pursuant to Specification 6.6.1 prior to resumption of plant opera-tion.

Such cases will be considered by the Commission on a case-by-case basis and may result in a requirement for analysis, laboratory examinations, tests, additional eddy-current inspection, and revision of the Technical Specifications, if necessary.

l l

SEQUOYAH - UNIT 1 B 3/4 4-3 Amendment No. 36, 189 l

l

d

,p'"%t fi

?t UNITED STATES

  • kb j

NUCLEAR RF(2ULATORY COMMISSION

[jjgg j

WASHINGTON, D.C. 20555-0001

,gu j TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-328 SE000YAH NUCLEAR PLANT. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 181 License No. DPR-79 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Tennessee Valley Authority (the licensee) dated September 8, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's ules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

, 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-79 is hereby amended to read as follows:

(2) Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.181, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

l 3.

This license amendment is effective as of its date of issuance, to be implemented prior to Unit 2 entry into Mode 2 from the Cycle 6 refueling outage.

FOR THE NUCLEAR REGULATORY COMMISSION 0

r-Frederick J. Hebd6n, Director Project Directorate II-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical l

Specifications Date of Issuance: October 20, 1994 l

l l

l ATTACHMENT TO LICENSE AMENDMENT NO.181 FACILITY OPERATING LICENSE NO. DPR-79 DOCKET NO. 50-328 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.

REMOVE INSERT 3/4 4-11 3/4 4-11 3/4 4-13 3/4 4-13 B3/4 4-3 B3/4 4-3 l

l I

l l

l i

REACTOR COOLANT SYSTEM SURVEILLANCE RE0UIREMENTS (Continued) 1.

All nonplugged tubes that previously had detectable wall pene-trations (greater than 20%).

2.

Tubes in those areas where experience has indicated potential problems.

3.

A tube inspection (pursuant to Specification 4.4.5.4.a.8) shall be performed on each selected tube.

If any selected tube does not permit the passage of the eddy current probe for a tube inspection, this shall be recorded and an adjacent tube shall be selected and subjected to a tube inspection.

c.

The tubes selected as the second and third samples (if required by Table 4.4-2) during each inservice inspection may be subjected to a partial tube inspection provided:

1.

The tubes selected for these samples include the tubes from those areas of the tube sheet array where tubes with imperfections were previously found.

2.

The inspections include those portions of the tubes where imperfections were previously found.

NOTE:

Tube degradation identified in the portion of the tube that is not a reactor coolant pressure boundary (tube end up to the start of the tube-to-tubesheet weld) is excluded from the Result and Action Required in Table 4.4-2.

The results of each sample inspection shall be classified into one of the following three categories:

Cateaory Insoection Resul.11 C-1 Less than 5% of the total tubes inspected are degraded tubes and none of the inspected tubes i

are defective.

C-2 One or more tubes, but not more than 1% of the total tubes inspected are defective, or between 5% and 10% of the total tubes inspected are degraded tubes.

C-3 More than 10% of the total tubes inspected are degraded tubes or more than 1% of the inspected tubes are defective.

Note:

In all inspections, previously degraded tubes must exhibit significant (greater than 10%) further wall penetrations to be included in the above percentage calculations.

SEQUOYAH - UNIT 2 3/4 4-11 Araendment No.181

REACTOR COOLANT SYSTEM SURVEILLANCE RE0VIREMENTS (Continued) 4.4.5.4 Acceptance Criteria 1

a.

As used in this Specification:

1.

Imoerfection means an exception to the dimensions, finish or contour of a tube from that required by fabrication drawings or specifications.

Eddy-current testing indications below 20% of the nominal tube wall thickness, if detectable, may be con-sidered as imperfections.

2.

Dearadation means a service-induced cracking,

wastage, wear or general corrosion occurring on either inside or outside of a tube.

3.

Dearaded Tube means a tube containing imperfections greater than or equal to 20% of the nominal wall thickness caused by degradation.

4.

% Dearadation means the percentage of the tube wall thickness j

affected or removed by degradation.

l 5.

Defect means an imperfection of such severity that it exceeds the plugging limit. A tube containing a defect is defective.

6.

Pluaaina Limit means the imperfection depth at or beyond which l

the tube shall be removed from service and is equal to 40%

i of the nominal tube wall thickness.

Plugging limit does not apply to that portion of the tube that is not within the pressure boundary of the reactor coolant system (tube end up to i

the start of the tube-to-tubesheet weld).

l 7.

Unserviceable describes the condition of a tube if it leaks or contains a Jefect large enough to affect its structural integ-rity in the event of an Operating Basis Earthquake, a loss-of-coolant accident, or a steam line or feedwater line break as specified in 4.4.5.3.c, above.

I 8.

Tube Inspection means an inspection of the steam generator tube from the point of entry (hot leg side) completely around the U-bend to the top support of the cold leg.

SEQUOYAH - UNIT 2 3/4 4-13 Amendment No. 181

REACTOR COOLANT SYSTEM BASES 3/4.4.5 STEAM GENERATORS The Surveillance Requirements for inspection of the steam generator tubes ensure that the structural integrity of this portion of the RCS will be main-tained. The program for inservice inspection of steam generator tubes is based on a modification of Regulatory Guide 1.83, Revision 1.

Inservice inspection of steam generator tubing is essential in order to maintain surveillance of the conditions of the tubes in the event that there is evidence of mechanical damage or progressive degradation due to design, manufacturing errors, or inservice conditions that lead to corrosion.

Inservice inspection of steam generator tubing also provides a means of characterizing the nature and cause of any tube degradation so that corrective measures can be taken.

The plant is expected to be operated in a manner such that the secondary coolant will be maintained within those chemistry limits found to result in negligible corrosion of the steam generator tubes.

If the secondary coolant chemistry is not maintained within these limits, localized corrosion may likely result in stress corrosion cracking. The extent of cracking during plant operation would be limited by the limitation of steam generator tube leakage between the primary coolant system and the secondary coolant system (primary-to-secondary leakage - 500 gallons per day per steam generator).

Cracks having a primary-to-secondary leakage less than this limit during operation will have an adequate margin of safety to withstand the loads imposed during normal operation and by postulated accidents. Operating plants have demonstrated that primary-to-secondary leakage of 500 gallons per day per steam generator can readily be detected by radiation monitors of steam generator blowdown.

Leakage in excess of this limit will require plant shutdown and an unscheduled inspection, during which the leaking tubes will be located and plugged.

Wastage-type defects are unlikely with proper chemistry treatment of the secondary coolant. However, even if a defect should develop in service, it will be found during scheduled inservice steam generator tube examinations.

Plugging will be required for all tubes with imperfections exceeding the plugging limit of 40% of the tube nominal wall thickness. The portion of the tube that the plugging limit does not apply to is the portion of the tube that is not within the RCS pressure boundary (tube end up to the start of the tube-to-tubesheet weld). The tube end to tube-to-tubesheet weld portion of the tube does not affect structural integrity of the steam generator tubes and therefore indications found in this portion of the tube will be excluded from the Result and Action Required for tube inspections.

It is expected that any indications that extend from this region will be detected during the scheduled tube inspections.

Steam generator tube inspections of operating plants have demonstrated the capability to reliably detect degradation that has penetrated 20% of the original tube wall thickness.

Whenever the results of any steam generator tubing inservice inspection fall into Category C-3, these results will be promptly reported to the Commis-sion pursuant to Specification 6.9.1 prior to resumption of plant operation.

Such cases will be considered by the Commission on a case-by-case basis and may result in a requirement for analysis, laboratory examinations, tests, addition-al eddy-current inspection, and revision of the Technical Specifications, if necessary.

SEQUOYAH - UNIT 2 B 3/4 4-3 Anendment No. 181

. -.