ML20195K059
| ML20195K059 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 06/15/1988 |
| From: | Heitner K Office of Nuclear Reactor Regulation |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20195K063 | List: |
| References | |
| TAC-65992, NUDOCS 8806290334 | |
| Download: ML20195K059 (4) | |
Text
- - - _ - _ _ _ _ - -
June 15,1988 Docket No. 50-267 Mr. R. O. Williams, Jr.
Vice President Nuclear Operations-l Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840
Dear Mr. Williams:
SUBJECT:
SAFETY t#LUATION REPORT ON HELILH CIRCULATOR S/N 0-2101 FAILURE AND RECOVERY (TAC h0. 65992)
The staff has reviewed the engineering report, "Report of Helium Circulator 4
-S/N C-2101 Darage and Inlet Piping S/N 2001 Repair and Modification Activities,"
submitted by the Public Service Ccrpany of Colorado (PSC) on Jar.cary 22, 1988.
The circulator was ren.oved frori service on July 31, 1987. The report revitvis
~
tt" design changes and controls to be implemented to ensure continued integrity ord cperability of the helium circu1= tors at the: Fort St. Vrain Nuclear Genera-ting Station. The staff has reviewed the PSC report end cer. curs with yccr prcpesed corrective actions. Our Safety Evaluation is enclosed.
TAC No. 65992 is considercd closed.
Sincerely,
/s/
Kenneth L. tiettner, Projec> A..-;er Project Director &te - IV Division of Reactor Projects - 111, IV, Y and Spect:,1 Projects P
Enclosure:
As stated cc w/cnclosure:
See next page DISTRIBUTION
. Docket File a,3 NPC FDR Local PDR PD4 Reading L. Rubenstein J. Calvo P. Noonan K. Heitner OGC-Rockville E. Jordan J. Partlow ACRS (10) t PD4 Plant File
}h PD4/Pfl Y H FM/0 FD4/L
,)d
$f/cc
?Ni$05
d NliIlte 8806290334 0DO615 PDR ADOCK 05000n67 P
June 15,1988 Docket No. 50-267 Mr. R. O. Williams, Jr.
Vice President, Nuclear Operations Public Service Company of Colorado Post Offlee Box 840 Denver, Colorado 80201-0840
Dear Mr. Williams:
SUBJECT:
SAFETY EVALUATION REPORT ON HELILH CIRCULATOR S/N 0-2101 FAILURE AND REC 0VERY (TAC NO. 65992)
The staff has reviewed the engineering report, "Report of Helium Circulator S/N C-2101 Darage and Inlet Piping S/N 2001 Repair and Fodification Activities,"
submitted by the Public Service Company of Coloradc (PSC) on Jar,tary 22, 1988.
The -irculator was ren.oved from service on July 31, 1987.
The report revicv;s the design charges and controls to be implemented to ensure continued integrity ar c' c rebility of the helium circulators at the Fort St. Vrain Nuclear Genera-ting Station. The staff has reviewed the PSC report end ccr. curs with ycer prcpesed corrective actions. Our Safety Evaluation is enclosed.
TAC No. 65S92 is considered cicsec.
Sincerely,
/s/
Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects f
Enclosure:
As stated cc w/ enclosure:
See next page l
DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading L. Rubenstein J. Calvo P. Noonan K. Heitner l
OGC-Rockville E. Jordan J. Partlow ACRS(10)
PD4 Plant File fu PD4/L
- d PD4/PM H H PD4/D PNoon KHeitner
- sr
/nJCalvo 06/)f/88 06/lr/88 h 06/6 /CP
SQ RfC o
UNITED STATES g
NUCLEAR REGULATORY COMMISSION g
5
- j WASHINGTON, D. C. 20555
%,....p June 15, 1988 Decket No. 50-267 Mr. R. O. Williams, Jr.
Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Cenver, Colorado 80201-0840
Dear Mr. Williams:
SUBJECT:
SAFETY EVALUATION REPORT ON HELIUM CIRCULATOR S/N 0-2101 FAILURE AND RECOVERY (TAC NO. 65992)
The staff has reviewed the engineering report, "Report of Helium Circulator S/N C-2101 Darage and Inlet Piping S/N 2001 Repair and Modification Activities,"
subritted by the Public Service Ccmpany of Colorado (PSC) cn January 22, 1088.
The circulator was removed from service on July 31, 1987. The report reviews the design changes and controls to be implemented to ensure continued integrity and operability of the helium circulators at the Fort St. Vrain Nuclear Genera-ting Station. The staff has reviewed the PSC report and concurs with your proposed corrective actions. Our Safety Evaluation is enclosed.
TAC No. 65992 is considered closed.
Sincerely,
]
Kenneth L. Heitner, Project Manager l
Project Directorate - IV I
Division of Reactor Prcjects - I!!,
IV, V and Special Projects
Enclosure:
As stated cc w/ enclosure:
See next page
Mr. R. O. Williams, Jr.
Public Service Company of Colorado Fort St. Vrain cc:
Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80?20 Denver, Colorado 80201-0840 Mr. David Alberstein, 14/159A Mr. R. O. Williams, Jr., Acting Manager GA Technologies, Inc.
Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Fr. P. F. Tomlinson, Manager Public Service Company of Colorade Qua'ity Assurance Division P. O. Box 840 Public Service Corpany of Colorado Denver, Colorado 80201-0840 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Comission Mr. R. F. Walker P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80701-0840 Kelley, Stansfield & 0'Donnell Public Service Company Building Corritment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorade Denver, Colorado 80202 24?0 W. 26th Ave. Suite 100-0 Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatcry Comission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Comissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environrental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413
.