Letter Sequence Meeting |
---|
|
|
MONTHYEARML20204E3301980-07-0202 July 1980 Discusses Objectives & Conclusions Re Helium Circulator C-2102 Insp.Forwards Ga Co rept,GA-C15847,re Insp Results. Requests Review of Proposed Inservice Insp Program in Draft Tech Specs Submitted 800331.W/o Rept Project stage: Draft Other ML20237K2111987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 Project stage: Other ML20237G7401987-08-21021 August 1987 Notification of 870911 Meeting W/Util in Arlington,Tx to Discuss Plant Circulator Failure & Recovery Project stage: Meeting ML20235H4731987-09-11011 September 1987 Preliminary Rept of Helium Circulator S/N C-2101 Damage & Justification for Returning to Power Operation Project stage: Other 05000267/LER-1987-018, Summarizes Util Commitments to Support Continued Operation of Plant,Per 870911 Meeting W/Nrc Re Damage in Helium Circulator C-2101 (Ref LER 87-018)1987-09-21021 September 1987 Summarizes Util Commitments to Support Continued Operation of Plant,Per 870911 Meeting W/Nrc Re Damage in Helium Circulator C-2101 (Ref LER 87-018) Project stage: Meeting ML20235H4401987-09-21021 September 1987 Summary of 870911 Meeting W/Util in Arlington,Tx Re Failure of Plant Circulator S/N C-2101 & Licensee Program to Recover from Failure.Licensee Rept, Preliminary Rept of Helium Circulator S/N C-2101 Damage & Justification... Encl Project stage: Meeting ML20236U5651987-11-20020 November 1987 Forwards Interim Safety Evaluation Re Helium Circulator S/N C-2101 Damage & Util Commitments for Continued Plant Operation.Reactor Will Be Shut Down Until Corrective Actions Are Completed Project stage: Approval ML20236U5761987-11-20020 November 1987 Safety Evaluation Re Helium Circulator S/N C-2101 Damage. Util Corrective Action Program Initiated Project stage: Approval ML20237A8151987-12-0808 December 1987 Forwards List of Questions Re New Bolting Matls for Helium Circulator C2101,per 871118 Telcon.One of Key Issues Was Util Decision to Use A286 Spec Bolts to Fasten circulator- Steam Scroll to Bearing Housing Project stage: Other ML20148G8301987-12-14014 December 1987 Metallurgical Analysis of Components from Helium Circulator C-2101 Project stage: Other ML20148G7711988-01-22022 January 1988 Forwards Rept of Helium Circulator S/N C-2101 & Inlet Piping S/N 2001 Repair & Mod Activities, Per Commitment in . Insp Findings & Proposed Tech Spec Amend to Be Submitted 8 Months Following Removal of Circulator for Insp Project stage: Other ML20148G7941988-01-22022 January 1988 Rept of Helium Circulator S/N C-2101 & Inlet Piping S/N 2001 Repair & Mod Activities Project stage: Other ML20148G8511988-01-22022 January 1988 Helium Circulator Insp Schedule Project stage: Other ML20153A8551988-03-0909 March 1988 Summary of 880304 Meeting W/Util to Discuss 880122 Submittal Re Helium Circulator Failure & Recovery.Attendee List & Viewgraphs Encl Project stage: Meeting ML20151L8911988-04-14014 April 1988 Discusses Revised Helium Circulator Outage Schedule,Per NRC 880304 Meeting.Schedule for 12 Wk Outage for Refurbishment of Helium Circulators Will Start on 880705 Instead of 880502 Project stage: Meeting ML20195K0591988-06-15015 June 1988 Forwards SER Concurring W/Util Proposed Corrective Actions in Engineering Rept Entitled, Helium Circulator S/N C-2101 Damage & Inlet Piping S/N 2001 Repair & Mod Activities Project stage: Approval ML20195K0651988-06-15015 June 1988 SER Concurring W/Util Proposed Corrective Actions in Engineering Rept Entitled, Rept of Helium Circulator S/N 2101 Damage & Inlet Piping S/N 2001 Repair & Mod Activities Project stage: Other 1987-08-21
[Table View] |
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20212G5351999-09-27027 September 1999 Forwards Signed Original Confirmatory Order (Effective Immediately)(Morrison Knudsen Corp,Cleveland,Oh) for Transmittal to Ofc of Fr for Publication.Without Encl ML20236W8131998-08-0404 August 1998 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed RM Entitled Miscellaneous Changes to Licensing Requirements for Independent Storage of Spent Nuclear Fuel & HLW Which Amended 10CFR72 ML20202D5011997-11-28028 November 1997 Forwards Table Summarizing Contractor Costs,Staff Hours & FTEs Expended in Removing Sites from Site Decommissioning Mgt Plan & Fsv & Shoreham Nuclear Power Facilities,In Response to C Paperiello 970605 Memorandum ML20141C8691997-05-0505 May 1997 Forwards Notice for Transmittal to Ofc of Fr Re Issuance of License Amend for Psc,Fort St Vrain Nuclear Generating Station Re Redesignated Approved Decommissioning Plan, & Approved Final Radiation Survey Plan ML20136D6041997-03-0404 March 1997 Forwards Signed Original of FRN for Transmittal to Ofc of Federal Register for Publication ML20134G2511996-11-0505 November 1996 Forwards Notice of Forthcoming Meeting W/Psc on Decommissioning & License Termination of Fsv ML20134F8951996-11-0505 November 1996 Notification of 961203 Meeting W/Public Service Co of Co in Rockville,Md to Discuss Decommissioning & License Termination of Fort St Vrain ML20236X0011996-09-12012 September 1996 Provides follow-up to Meeting Re Use of Natural or Depleted U in Storage Casks/Use of Neutron Absorbing Matls,In Order to Improve Basis & Shed Light on Direct Final Possibility ML20137H1331995-12-29029 December 1995 Responds to Request of 951108 for Investigative Assistance in Interviewing R Sawyer & K Zarht Re Alleged Discrimination & Wrongful Termination of Contractor Radiation Protection Technicians at Fort St Vrain,Oi Case A4-95-064 ML20137H2951995-11-21021 November 1995 Forwards Copies of Transcripts of R Sawyer & K Zarht Re Alleged Discrimination & Wrongful Termination of Contractor Radiation Protection Technicians Case A4-95-064.W/o Encls ML20136B2301995-11-17017 November 1995 Forwards Repy to NOV ML20136B1831995-08-31031 August 1995 Discusses Proposed Meeting Re OI 4-95-015 ML20136B1711995-08-31031 August 1995 Agrees W/Office of Enforcement Regional Approach ML20136B2121995-08-30030 August 1995 Confirms 950911 for OI Meeting Re OI 4-95-015 ML20136B1901995-08-30030 August 1995 Ack Receipt of Mail ML20137H2651995-08-25025 August 1995 Forwards Copy of OI Rept Where Investigation Did Substantiate That Seg Technician Deliberately Failed to Perform Response Checks in Accordance W/Procedures.W/O Encl ML20136B1661995-08-17017 August 1995 Forwards OI Rept of Investigation Re Alleged Falsification of Records.W/O Encl ML20136B2191995-08-0707 August 1995 Informs That Enforcement Action Will Be Required Re OI 4-95-015 Concerning Failure to Perform Response Checks ML20136B1581995-06-20020 June 1995 Requests That General Counsel Anlayze Rept & Determine Whether Sufficient Evidence Exists to Take EA Re Falsification of Records ML20137H2551995-06-0303 June 1995 Forwards Copy of OI Rept,Reviewing Licensee Investigation Rept & Confirmed Licensee Conclusions That Radiation Survey Records & Radiation Work Permits Falsified.W/O Encl ML20136B1471995-05-26026 May 1995 Forwards OI Rept of Investigation Re Alleged Falsification of Radiation Survey Records ML20137K0111995-04-20020 April 1995 Discusses Verbal DOJ Declination of Prosecution Re Public Svc Co of Colorado,For Plant ML20137K0781995-04-12012 April 1995 Documents Events Surrounding Segs Placement of Problematic Radiation Protection Technician on Administrative Leave ML20137K0611995-04-12012 April 1995 Documents Events Surrounding Discovery of Barrels Being Shipped from Plant to Richland Disposal Facility W/Different Radiation Exposure Readings than Were Listed on Shipping Manifest NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20137J8251994-04-14014 April 1994 Discusses Chronology of Events Since Preliminary Notification of Event or Unusual Occurrence Case 4-94-010 ML20137S2081994-03-28028 March 1994 Discusses 940325 Telcon from Listed Licensee & Contractor Personnel Re Rept of Falsified Survey Records IA-97-311, Submits Physical Security Info for Export of Unirradiated Fort St Vrain Fuel Containing high-enriched U Mixed W/Th to France for recovery,down-blending & Subsequent Use as Fuel in Research & Test Reactors.Supporting Documentation Encl1993-11-18018 November 1993 Submits Physical Security Info for Export of Unirradiated Fort St Vrain Fuel Containing high-enriched U Mixed W/Th to France for recovery,down-blending & Subsequent Use as Fuel in Research & Test Reactors.Supporting Documentation Encl ML20198H5751993-11-18018 November 1993 Submits Physical Security Info for Export of Unirradiated Fort St Vrain Fuel Containing high-enriched U Mixed W/Th to France for recovery,down-blending & Subsequent Use as Fuel in Research & Test Reactors.Supporting Documentation Encl ML20058B1681993-11-18018 November 1993 Notification of 931109 Meeting W/Psc in Rockville,Md to Discuss Fort St Vrain Decommissioning Status ML20059C2741993-10-25025 October 1993 Notification of Significant Licensee Meeting W/Util on 931116 to Discuss Decommissioning Status of Plant ML20058N9831993-10-0606 October 1993 Notification of 931109 Meeting W/Util in Rockville,Md for Briefing on Status of Plant Decommissioning ML20127D3281993-01-12012 January 1993 Notification of 930128 Meeting W/Util in Rockville,Md to Brief NRC on Plant Decommissioning Status ML20126A3141992-11-27027 November 1992 Forwards Insp Plan for Fsv,Developed for Current Fiscal Yr Ending 930930.Plan Based on Mc 2560,Decommissioning Insp Program ML20127L8411992-11-27027 November 1992 Forwards Insp Plan for Facility Which P Michaud Developed for Current Fy Ending on 930930.Plan Based on Mc 2560, Decommissioning Insp Program ML20059P0831990-10-12012 October 1990 Notification of 901017 Meeting W/Nrc in Rockville,Md to Discuss Decommissioning of Facilities ML20055F7381990-07-16016 July 1990 Notification of 900725 Meeting W/Util in Rockville,Md to Discuss Plant Status & Plans for Final Defueling & Decommissioning ML20248E8301989-09-26026 September 1989 Notification of 891013 Meeting W/Util in Rockville,Md to Discuss Plant Spent Fuel Storage.Agenda Encl ML20247J6831989-09-18018 September 1989 Forwards Comments on Facility Preliminary Decommissioning Plan,Per 890803 & 21 Memos Re Transfer of Regulatory Authority for Reactor Decommissioning ML20246F1871989-08-24024 August 1989 Summary of 890803 Meeting W/Util in Rockville,Md Re Preliminary Decommissioning Plan of 890630 for Plant.Related Info,Including List of Attendees & Util Info Re Use of Tax Deduction in Calculation of Funding Requirements Encl ML20245G5541989-08-0808 August 1989 Requests Support in Conducting Review of Plant Preliminary Decommissioning Plan.Areas to Be Reviewed,Requested Reviewers & Tentative Review Schedule Encl ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247K6271989-07-24024 July 1989 Forwards Revised Filing Instructions for Rev 7 to Updated FSAR ML20246L7971989-07-17017 July 1989 Submits Daily Highlight.Notifies of of 890718 Meeting W/Util in Rockville,Md to Discuss Defueling of Plant & Tech Spec Upgrade Program ML20246L3741989-07-12012 July 1989 Notification of 890803 Meeting W/Util & State of Co in Rockville,Md to Discuss Preliminary Decommissioning Plan ML20247H6041989-05-29029 May 1989 Requests Encl Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Power Reactors, Task CE 025-4 Be Forwarded to Util for Use in Preparing Preliminary Decommissioning Plan for Plant ML20247D7421989-03-27027 March 1989 Forwards FEMA 890313 Memo Transmitting FEMA Region Viii Update Rept of 870805 Exercise.Rept Includes Results of Remedial Drill Conducted on 880830 & Status of Areas Requiring Corrective Action ML20236B9461989-03-13013 March 1989 Notification of Significant Licensee Meeting W/Util on 890322 in Region IV Ofc to Review OL Requirements ML20155A2481988-09-28028 September 1988 Notification of 881013 & 14 Meetings W/Util in Platteville, Co to Discuss Potential Decommissioning & Conversion of Facility.Meeting Agenda Encl ML20155B4111988-09-27027 September 1988 Notification of Significant Licensee Meeting W/Util on 881003 to Discuss Items in Insp Repts 50-267/88-15 & 50-267/88-23,control of Special Processes,Welding Program & NDE Program 1999-09-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20212G5351999-09-27027 September 1999 Forwards Signed Original Confirmatory Order (Effective Immediately)(Morrison Knudsen Corp,Cleveland,Oh) for Transmittal to Ofc of Fr for Publication.Without Encl ML20236W8131998-08-0404 August 1998 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed RM Entitled Miscellaneous Changes to Licensing Requirements for Independent Storage of Spent Nuclear Fuel & HLW Which Amended 10CFR72 ML20202D5011997-11-28028 November 1997 Forwards Table Summarizing Contractor Costs,Staff Hours & FTEs Expended in Removing Sites from Site Decommissioning Mgt Plan & Fsv & Shoreham Nuclear Power Facilities,In Response to C Paperiello 970605 Memorandum ML20149H4801997-07-24024 July 1997 Staff Requirements Memo Re SECY-97-138, Termination of Fort St Vrain Nuclear Generating Station Ol ML20141C8691997-05-0505 May 1997 Forwards Notice for Transmittal to Ofc of Fr Re Issuance of License Amend for Psc,Fort St Vrain Nuclear Generating Station Re Redesignated Approved Decommissioning Plan, & Approved Final Radiation Survey Plan ML20136D6041997-03-0404 March 1997 Forwards Signed Original of FRN for Transmittal to Ofc of Federal Register for Publication ML20134F8951996-11-0505 November 1996 Notification of 961203 Meeting W/Public Service Co of Co in Rockville,Md to Discuss Decommissioning & License Termination of Fort St Vrain ML20134G2511996-11-0505 November 1996 Forwards Notice of Forthcoming Meeting W/Psc on Decommissioning & License Termination of Fsv ML20236X0011996-09-12012 September 1996 Provides follow-up to Meeting Re Use of Natural or Depleted U in Storage Casks/Use of Neutron Absorbing Matls,In Order to Improve Basis & Shed Light on Direct Final Possibility ML20137H1331995-12-29029 December 1995 Responds to Request of 951108 for Investigative Assistance in Interviewing R Sawyer & K Zarht Re Alleged Discrimination & Wrongful Termination of Contractor Radiation Protection Technicians at Fort St Vrain,Oi Case A4-95-064 ML20137H2951995-11-21021 November 1995 Forwards Copies of Transcripts of R Sawyer & K Zarht Re Alleged Discrimination & Wrongful Termination of Contractor Radiation Protection Technicians Case A4-95-064.W/o Encls ML20136B2301995-11-17017 November 1995 Forwards Repy to NOV ML20136B1711995-08-31031 August 1995 Agrees W/Office of Enforcement Regional Approach ML20136B1831995-08-31031 August 1995 Discusses Proposed Meeting Re OI 4-95-015 ML20136B2121995-08-30030 August 1995 Confirms 950911 for OI Meeting Re OI 4-95-015 ML20136B1901995-08-30030 August 1995 Ack Receipt of Mail ML20137H2651995-08-25025 August 1995 Forwards Copy of OI Rept Where Investigation Did Substantiate That Seg Technician Deliberately Failed to Perform Response Checks in Accordance W/Procedures.W/O Encl ML20136B1661995-08-17017 August 1995 Forwards OI Rept of Investigation Re Alleged Falsification of Records.W/O Encl ML20136B2191995-08-0707 August 1995 Informs That Enforcement Action Will Be Required Re OI 4-95-015 Concerning Failure to Perform Response Checks ML20136B1581995-06-20020 June 1995 Requests That General Counsel Anlayze Rept & Determine Whether Sufficient Evidence Exists to Take EA Re Falsification of Records ML20137H2551995-06-0303 June 1995 Forwards Copy of OI Rept,Reviewing Licensee Investigation Rept & Confirmed Licensee Conclusions That Radiation Survey Records & Radiation Work Permits Falsified.W/O Encl ML20136B1471995-05-26026 May 1995 Forwards OI Rept of Investigation Re Alleged Falsification of Radiation Survey Records ML20137K0111995-04-20020 April 1995 Discusses Verbal DOJ Declination of Prosecution Re Public Svc Co of Colorado,For Plant ML20137K0611995-04-12012 April 1995 Documents Events Surrounding Discovery of Barrels Being Shipped from Plant to Richland Disposal Facility W/Different Radiation Exposure Readings than Were Listed on Shipping Manifest ML20137K0781995-04-12012 April 1995 Documents Events Surrounding Segs Placement of Problematic Radiation Protection Technician on Administrative Leave NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20137J8251994-04-14014 April 1994 Discusses Chronology of Events Since Preliminary Notification of Event or Unusual Occurrence Case 4-94-010 ML20137S2081994-03-28028 March 1994 Discusses 940325 Telcon from Listed Licensee & Contractor Personnel Re Rept of Falsified Survey Records ML20059G9501994-01-19019 January 1994 Staff Requirements Memo Re SECY-93-352,Proposed Export of Fort St Vrain Unirradiated HEU Fuel Assemblies to France for Recovery & Down-Blending to LEU XSNM-2748, & SECY-93-333, Final Amend to 10CFR55 on Renewal of Licenses.. ML20198H5751993-11-18018 November 1993 Submits Physical Security Info for Export of Unirradiated Fort St Vrain Fuel Containing high-enriched U Mixed W/Th to France for recovery,down-blending & Subsequent Use as Fuel in Research & Test Reactors.Supporting Documentation Encl IA-97-311, Submits Physical Security Info for Export of Unirradiated Fort St Vrain Fuel Containing high-enriched U Mixed W/Th to France for recovery,down-blending & Subsequent Use as Fuel in Research & Test Reactors.Supporting Documentation Encl1993-11-18018 November 1993 Submits Physical Security Info for Export of Unirradiated Fort St Vrain Fuel Containing high-enriched U Mixed W/Th to France for recovery,down-blending & Subsequent Use as Fuel in Research & Test Reactors.Supporting Documentation Encl ML20058B1681993-11-18018 November 1993 Notification of 931109 Meeting W/Psc in Rockville,Md to Discuss Fort St Vrain Decommissioning Status ML20059C2741993-10-25025 October 1993 Notification of Significant Licensee Meeting W/Util on 931116 to Discuss Decommissioning Status of Plant ML20058N9831993-10-0606 October 1993 Notification of 931109 Meeting W/Util in Rockville,Md for Briefing on Status of Plant Decommissioning ML20127D3281993-01-12012 January 1993 Notification of 930128 Meeting W/Util in Rockville,Md to Brief NRC on Plant Decommissioning Status ML20127L8411992-11-27027 November 1992 Forwards Insp Plan for Facility Which P Michaud Developed for Current Fy Ending on 930930.Plan Based on Mc 2560, Decommissioning Insp Program ML20126A3141992-11-27027 November 1992 Forwards Insp Plan for Fsv,Developed for Current Fiscal Yr Ending 930930.Plan Based on Mc 2560,Decommissioning Insp Program ML20059P0831990-10-12012 October 1990 Notification of 901017 Meeting W/Nrc in Rockville,Md to Discuss Decommissioning of Facilities ML20055F7381990-07-16016 July 1990 Notification of 900725 Meeting W/Util in Rockville,Md to Discuss Plant Status & Plans for Final Defueling & Decommissioning ML20248E8301989-09-26026 September 1989 Notification of 891013 Meeting W/Util in Rockville,Md to Discuss Plant Spent Fuel Storage.Agenda Encl ML20247J6831989-09-18018 September 1989 Forwards Comments on Facility Preliminary Decommissioning Plan,Per 890803 & 21 Memos Re Transfer of Regulatory Authority for Reactor Decommissioning ML20246F1871989-08-24024 August 1989 Summary of 890803 Meeting W/Util in Rockville,Md Re Preliminary Decommissioning Plan of 890630 for Plant.Related Info,Including List of Attendees & Util Info Re Use of Tax Deduction in Calculation of Funding Requirements Encl ML20245G5541989-08-0808 August 1989 Requests Support in Conducting Review of Plant Preliminary Decommissioning Plan.Areas to Be Reviewed,Requested Reviewers & Tentative Review Schedule Encl ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247K6271989-07-24024 July 1989 Forwards Revised Filing Instructions for Rev 7 to Updated FSAR ML20246L7971989-07-17017 July 1989 Submits Daily Highlight.Notifies of of 890718 Meeting W/Util in Rockville,Md to Discuss Defueling of Plant & Tech Spec Upgrade Program ML20246L3741989-07-12012 July 1989 Notification of 890803 Meeting W/Util & State of Co in Rockville,Md to Discuss Preliminary Decommissioning Plan ML20247H6041989-05-29029 May 1989 Requests Encl Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Power Reactors, Task CE 025-4 Be Forwarded to Util for Use in Preparing Preliminary Decommissioning Plan for Plant ML20247D7421989-03-27027 March 1989 Forwards FEMA 890313 Memo Transmitting FEMA Region Viii Update Rept of 870805 Exercise.Rept Includes Results of Remedial Drill Conducted on 880830 & Status of Areas Requiring Corrective Action ML20236B9461989-03-13013 March 1989 Notification of Significant Licensee Meeting W/Util on 890322 in Region IV Ofc to Review OL Requirements 1999-09-27
[Table view] |
Text
7--. ,
' * ~
J '
Augu:t 21, 1987 i,. set No. 50-267, L
MEMORANDUM' FOR: Jose A. Calvo, Director Project Directorate - IV E
Division of Reactor Projects - III, IV., V and Special Projects FROM: Kenneth L. Heitner, Project Manager Projec' Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects
SUBJECT:
ANN 0UNCEMENT OF FORTHCOMING MEETING WITH PUBLIC SERVICE COMPANY OF COLORADO TO DISCUSS FORT ST. VRAIN CIRCULATOR FAILURE AND REC 0V....d (TAC N0. 65992)
DATE & TIME: September 11, 1987 8:30 a.m. - 12:00 noon LOCATION: USNRC, Regional Administrator Region IV Parkway Central Plaza Building 611 Ryan Plaza Drive (10th Floor)
Arlington, Texas 76011 PARTICIPANTS: NRC PSC E. Tomlinson, NRR R. O. Williams
.F. Litton, NRR L. Brey K. Heitner**, NRR D. Warembourg J. Jaudon, Region IV R. Farrell, Region IV M. Skow, Region IV
[j) (
3 Kenneth L. Heitner, Project Manager Project Directorate - IV i
Division of Reactor Projects - III, IV, V and Special Projects l cc: See next page f
k
- Meetings between NRC technical staff and applicants for licensees are open for ,
L' . interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy",
43 Federal Register 28058, 6/28/78. '
- Telephone hook-up PD4/PM N KHeitner: sr S/2)/87 g902me9B70821 p ADOCK 05000267~:'
PDR
u .,
J w-3' Mr. R.-O. Williams Public. Service Company of Colorado Fort St.'Vrain-cc: .
Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East 11",h Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201 Mr. David Alberstein, 14/159A Mr. R. O. Williams, Acting Manager GA Technologies, Inc. Nuclear Production Division Post Office Box 85608 Public Se"vice Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Plattevi1N., Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. P. F. Tonlinsen, Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado 80201 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. R. F. Walker P. 0. Box 840 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Kelley, St.ansfield & 0'Donnell Public Service Company. Building Commitment Control Program Room 900 Coordinator
-550 15th Street Public Service Cempany of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-D Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan' Plaza Drive, Suite 1000 Arlington, Texas 76011 Ch*d eman, Board of County Commissioners oi Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413 l
l
6 Ol5TRIBUT10N Docket-or Central file, NRC PDR Local PDR PD4 Reeding T. Murley/J. Sniezek F. Miraglia
- f. Schroeder D. Ceutchfield P. Noonan Project Manager OGC-Beth W. Lanning E. Jordan J. Partlow Receptionist (Phillips)
HRC Participants ACRS (10)
GPA/PA V. Wilson B. Kolostyak i
l l
l
/
/
/
J