Rev 3 to Procedure C.13A, Hot Shutdown from Shutdown Panel W/Fire in Control Room
ML20155H645
Person / Time
Site: Rancho Seco, 05000000
Issue date: 11/15/1985
From:
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To:
Shared Package
ML20155H523 List:
References
RTR-NUREG-1195 C.13A, NUDOCS 8605160315
Download: ML20155H645 (43)


Text

_ _ _ _ _ - _ _ _ - . _ _ _ _ _

/2,304 /3 b EFFECTIVE DATE

\

. l l3 11-15-85 A. Rev. 3 i

'., WP2760P 0-0055P C.13A HOT SHUTOOWN FROM SHUTDOWN PANEL WITH A FIRE IN THE CONTROL ROOM i

1.0 SYMPTOMS 1

.1 1 Control Room becomes untenable due to a fire in the Control Room.

) .2 Off-Site power may or may not be available.

i l

1 2.0 RESPONSE NOTE:

The methodology used in this procedure is patterned after the Abnormal Transient Operating Guidelines

( ATOG) for a loss of of f-site power. The objective of this procedure is to prevent overcooling of the RCS, establish inventory control, and establish primary to secondary heat transfer. The major

.('

L operator actions are:

a. De-energize the EMOV PSV-21511.
b. Gain control over the AFW and HPI valves controlled from the Shutdown Panel.

.j c. Establish AFW to "B' OTSG.

d. Initially isolate AFW to "A" OTSG.

Then reestablish feed 3 to "A" OTSG.

1

e. Reestablish plant air.

! f. Assure main steam isolation.

g. Isolate and start the Diesel Generator as required.

Once these steps are performed, RC Pump Seal Injection will be established. This will assure control over the plant.

kgy, i

S C.13A-1 a

Fa D

1 .___.__,--___._,,~~-+-~-S--

- - + - ~ ~ - - - -

= -- - + - --- - - - - - -

~

k <

RESPONSE (Continued) 7 2.1 On the decision to evacuate the Control Room, perform the following:

'~

l '

L 1 .

.1 Trip the reactor / turbine (confirm all rods in).

.2 Trip both Main Feedwater Pumps P-317A and P-3178.

.3 Evacuate the Control Room.

.4 Proceed to the 4160 Volt West Switchgear Room area. -

f ,

.5 If time permits:

! .1 Verify Throttle and Governor valves closed.

.2 Close the following valves:

HV-32243 Pegging steam valve a

HV-20597 Main Steam to Reheater j HV-20598 Main Steam to Reheater i

HV-20560 Main Ste'as to Aux. Steam HV-20565 Main Steam to Aux. Steam -

.2 Shif t Supervisor
-

.1 Classify the event in accordance with AP.501, " Recognition and Classification of Emergencies." .

t

.2 Initiate the Emergency Plan.

i

.3 Alert additional personnel necessary to restrict damage due to casualty.

l .4 Direct security to fall open all security doors.

j .5 Refer to section 2.8 of this procedure for additional considerations.

.6 Advise operators in change out area of further instructions once they have reported Enclosures 4.5 and 4.6 complete. -

M-9 Rev. 3 C.13A-2 ~

4 m -

f

,. r * ,

I RESPONSE (Continued) l p 2.3 Senior Control Room Operator, (SCRO):

NOTE: -

The Senior Control Room Operator directs shutdown of the plant from the Shutdown Panel (H250) and serves .

as the central point for communications with all operators.

( .1 Direct an operator to the 480 Volt West Switchgear Room to perform Enclosure 4.4. He will act as the Control Operator. -

.2 Proceed to the 4160 Volt West Switchgear Room.

i.

i .3 Perform Enclosure 4.3, Senior Control Room operator Supplementary Actions.

j .4 Direct the shutdown of the plant from the Shutdown Panel, i

.5 Commence Enclosure 4.8, Senior Control Room Operator Sign-Off Sheet.

.4 Control Room Operator:

NOTE:

The Control Operator deenergizes the EMOV, CRO, and I -

4160 Volt equipment necessary to achieve hot l7g~ ~

shutdown and deenergizes the unnecessary 4160 Volt equipment.

, .1 Evacuate the Control Room.

.2 Proceed to the 480 Volt West Switchgear Room.

.3 Complete Enclosure 4.4, Control Operator Supplementary Actions.

.5 Operator No. 1:

s NOTE:

, Operator #1 deenergizes 480 Volt equipment, lines up RCP seal injection, and establishes the Alternate Recirculation path.

l '

.1 Obtain a walkie-talkie from the Emergency Communications Storage

{ Locker (H7T262) in the 4160 Volt West Switchgear Room.

i 1

?  !

l 2 Rev. 3

} C.13A-3

}

l -

l -

.. I

n.-w - -

4 l -

/

. /

4 RESPONSE (Continued) j t 2.5 .2 Proceed to the 480 Volt West Switchgear Room. ., ,

l .3 Complete Enclosure 4.5, Operator No. 1 Supplementary Actions.

H

.6 Operator No. 2:

1 NOTE:

Operator #2 reestablishes plant air, positions AFW '

n valves, trips the AFW pump (P-318) turbine, and 1 positions Make-Up valves on the (-)20' level of the I

}

Auxiliary Building.

.1 Obtain a walkie-talkie from the EArgency Communications Storage q Locker (H77262) in the 4160 Volt West Switchgear Room.

.2 Complete Enclosure 4.6, Operator No. 2 Supplementary Actions.

.7 Operator No. 3:

1

' _N.QH:

Operator #3 isolates the "A" Diesel Generator, verifies the Main Feed Pump Turbines tripped, deenergizes the "4E" bus, and positions main steam valves.

.1 Obtain a walkie-talkie from the Emergency Communications Storage '

Locker (H7T262) in the 4160 Volt West Switchgear Room. .

.2 Complete Enclosure 4.7, Operator No. 3 Supplementary Actions.

.8 Shift Supervisor information:

$ This section is intended to provide the Shift Supervisor with additional J information and reminders and does not contain any mandatory actions for j shutdown of the plant.

j .1 HPI Cooling 1

j This procedure is based on cooling the plant through natural circulation cooling. If high pressure injection cooling were 1 needed or if the "A" HPI pump fails, the Makeup Pump can be f

transferred to the "A" power train a'id operated from the shutdown panel. An operator would need to be sent to the Makeup Pump area

, to position the selector switch and line up cooling water in i accordance with A.15 " Makeup, Purification, and Letdown System.".

f.

I 1

Rev. 3
C.13A-4 1

O a

. . , . . . - . , - - , - . - - . - , - - - - - - + - , - - - , , - . , . - - - , . - - , - . . - - - , . - - - - . - , - - - . , - - , . , - - . _ _ _ _ -

$ RESPONSE (Continued)' l

' r, i

2.8 .2 Loss of 8WST

$ If the BWST is lost for any reason, assure a suction supply is

available to the HPI/MU pump prior to restarting of a second pump.

.3 Tripping of Buses 4 The 4160 Volt Buses have had the supply breakers tripped and the control power de-energized. Before attempting to re-energize a bus, it is suggested the bus be checked for shorts and that each panel be re-energized one at a time.

.4 Operators in Radiation Control Areas

]

l Operators No. I and No.2 enter Radiation Control Areas and must be assumed contaminated.

). 3.0 RESTORATION i

i .1 Restoration shall be as directed by the Emergency Coordinator.

.2 The Shutdown Panel-will be used to control the plant until the Control

Room is available.

4 f' .3 Go to C.138, "Cooldown from Hot Shutdown to Cold Shutdown with a Fire in

( the Control Room," to place the plant in a Cold Shutdown condition.

i l 4.0 ENCLOSURES

.1 RCS Pressure Limits vs. RCS Temperature j .2 Pressurizer Level Correction of Temperature Compensation

.3 Senior Control Room Operator Supplementary Actions i

.4 Control Operator Supplementary Actions

.5 Operator No.1 Supplementary Actions

-1

] .6 Operator No. 2 Supplementary Actions

.7 Operator No. 3 Supplementary Actions

.8 Senior Control Room Operator Sign-Off Sheet

.9 Flow Chart and Time Line f Rev. 3

C.13A-5 Li d

i 1

H L _ _ . _

~ - - a a .= - . .= - . . . a.: w . . =. = = _ .. - . ~. - _ _ c 4

f

-y . . . . .

.. c .

c 1 ENCLOSURE 4.10 - ,

1 ,

,, ~ ' Page 1 of 2 I fraunt 101 24 au%Astt w ar).ta anstat/'t'*nA. ;

j . .n .we .u. .u.= 8 N.;./*

i (au su, J=sinn.n> no

] u s m A %.mu. ..o

l. . .

' ~

- aos als 74tssult l 1

fttP. 2300 astg I o i

.num - -

,i .

r . . _

_ ._.._'._. _ . . . . . . . . ... .. . u . . . . .. . . . g gygg _

. . ...... _ a,s .to e,sarJs

.. . . .. __ . . _ . . . . . . . . . s. rats, sia.r

_ _ ..._...._..........N.

.. . .. .. .. .. .g,.r. _ . .. . ._.... . . _ . . . . _ .. .........

v- m _r ..

_ ... ..... . _ ... _... t _..

_.s ._ . _ . . .._. ._._._____..___.. .._.__._ _y.

x __ ._..

. 1 - .._._. _ . .

a Ps taigpets,sunt s' Q 'Ds vastaatt mssunu

, _TRIP e __

G

.. . aa. .. , m._ - .f. ppt.n.a..t.t.ag intp y . ....

3,

,4

= .. __. _

m. ._

. - - - A.

, ~

- , C .- - - . .

' m W RPf'kt e petssuRE

. 1s _-

TRIP tsto sete

.. . ._ twn gs smg gpggg,. .

e

_ .. . c __ . . . .. . . .

. ... rtoi. spec. esvt 3.1.z 2. -__--+ ...--- .t .

3 .... agg peqKEss sTafeano CJVC -_ s .

e 101 2. 4 7 LIMtf N. p _.... . ..... ,1, . . . .

. _ ._ . . ......,J .p w ._y . .

H. . . . . .

g__ _-_; - .

_._.._..q .. ..... . ... .s.j .. .

a.a .,_.

.f .T, .Yl.. .:

3 _ _. ..-._. _.. ......... . . . . . . .. . .. ... . . ... ..

_. CJYE 101 1b. FutL .,.

M _. ..

w .. ...... . . . . . ... . a.

.. . = .

.e. [.. . .

. gyygg$$gg ggggy$ reg

- F3CED c!aCJLAft3

_ w,

.s

._.w _. . .

. f. .

I F

u-

...I

.~ Il ;

E p_ .
: -

. i. --. ._

FCJyt 10134. FutL

'N i ! / r earenessten t:Mtis Fan r_. .__ ,,;.. -

.s ' -

./,,

4

. urJat c:ac:.urt:n jj . ._._ ..

4.

  • s . . /

,.,.,Js e

. . , ..e . .. f l

g

/

. rE3. s7tc. CJVC iI /

{

l, n --

2

- /_ ~

3.1.9.1 c:nraar. eco carvt

I  : .. . .: w . .. _
!i/ / w SAft0m 8.I'*!T s..

.. ._e..

(.y

( / .

q .. . .

., ; / ..

i l' m, .x .

'l i ,l

' / IM _.

U i necess sinc 4a0 eJve toi.~1e (ac n e cr o arten a v e m at u .

_ - - - --,,9 ,:

rt
mi sen ..tss u m 4 n os m

--",..a' .

i

=

1 CPDAft%. stt FITJE 10129 I

a wo a a, .* m_ . a ico e.w D: . '

< t.otcara ac itmnsrJs P c

Rev. 3 ,

C.13A-6 -

.

  • xeroxed f rom AP.101, Re v. 33 b _ _ - - _ - - - - - - -

l

.t q .

d 4

ENCLOSURE ' 4.10 4

g ..

Page z of 2

  • PtGuitt 1011 aLLausaLE % me m.udit/ttpoeta.
1 , . was m m w.ma

'4 '

Q. f LL W WPWIM6WN3 4

. , o wnmL . .wui wa s e.t9vt 101 10. 811!L i I l A

- Cseetssten unt s ran -

f i

.t rmCro C:ncuurta .. .. .

. .I /-

4

.. _.. .... . . . .. .... . .. . i f i

y

.- .... _ ... ...... ... . . f C W yt 101 34. PUEL -

i C394t33!3 L _

._.t maruut C:stuLATI M - - - -

_: * ~ *!!- ;

. . . _ ._.-..A r w - - . _ . -- .- ,f f .

T,..

m s s. [. .

.  ; . _ : g _.__ p n rt  !

a.os,. 0Ctss SPEC..CURvt 3.1.2 2. C - --- ..; g.

sra. 0 Cavt _ f .....!_.. .

ici.e. er umr

. ..r...-.g.

._ 1

. . . . . . t ..... . . .. , l* .

u...._.....

i

....t .. t.

. . .-_ r_=.._=.... ... .

l .I... . ..

l f.

E.

l

....._.... _.. ._:.. . . ..... I

,i e

= ._ . _ . . . ...........

s

- l. .

I -- Pe0 CESS Sta m . C W yt IL ..*:. !.,

  • g

= ..

ici.u. (aC nue man. . .- ..: .- ..- ::- . i/ F.

. ?!m ase C:sstanf!On) g g . . . . . m ..

. . .u.... .

j, g g

5 ... .

l m .. .

q.

, l Ey ~. mr.

3 e _ /

g

/

=s w

t I

9

/ I I i

- -- I

/

. Pe0Ct55 siano. CURyt 1/ I  !

w 101.Jn. (ant 3 AC 7 f ,

l Pues appartas) f , g

/

' ' ' - " " *

  • f

=

, , .,/ - t l I

j> - --- _ ..,j j L -- -

. *- . ,f rtos.$PEC. CURvt 3; S. *

, p 3.1.9.I *

-1 # ,, ColmitR. 200 m !vt ij snm =' " #,e' QPetarton LINT 7 i!

i::

m ~.- . . . - N fe0Ct33 ITame. Cunyt -

l g

.! 101 (18C Pwe

j g OPCl4 (M IN (Ace LOOP) I l P90Ct33 Stano. CURyt [ 4 u

101.Jr. (1 4C PWe at waarta rn Loop si i I n 4

- - i i i

~

m r i N

1

, V' 0 200

- ..-. _. am. - .

3co a00

.} rnorcain Ructs Casuar ineaarmt P

~

j Rev. 3 n C.13A-7

  • xeroxed f rom AP.101

, Re v. 33 e ~ . . - - ---e.e- --

s . .....e - , - , . - - - - - - . . . ,0 a,, ,-e-.--. .-.,..--------,------.---------w..-n-- - - ~ - - - - - ~ ~ ~ - - - . - . . - - - , ,

I ENCLOSURE 4.2* ,

'RCCESS S*.i?3ARD .

1 .

Figure 101-17

] y ,

j INDICATED V5 ACTUAL LEVEL WITH rz.nresCE j

IzG AT 125*F -

l 'Pzr.w]e 2103 psig (650*F)

M-- _ _ _ _

1528 psig (6CCC F)

J [

1030 psig (550*F'

~

_~

f _-

~

f 666 psig (500*F?

i i

a-I.

f!

~~ ~~

~~ ~~

j i : :-

,, - _ 232 osig (4CCCF)

  • ~

~

l e

~ _ ~ :~  :

52 -sig (200*F)

~

$ . f- , _

g z.; -

f _ - __- _--_

{ ~~~~~ ~

_~

_~ _

, 8 l g ___~_ ,_- _ --

i h'- ____-

~

gg -

(

u.

w _:__-_:

IR .~5:: .-~ :

i l!

s f

it! _.

~~~~~~~

~ ~-

~

_~~

~

a y c a _:

w f

an; luu _ _5

~-

~

24  : : ~_-

ag _--

=s u

164 _-

i X -

93 _f si ~

. _ ~_b _-

~

~~ ' i 0 --------~ ~ .._.___. .. . ._

= 0 50 100 150 200 250,/

i ..

INMCATED LEVEL (UNCt*PBSATED), inches b

  • Rev. 3
  • xaroxed f rom AP.101, Rev. 33 C.13A-8

ENCLOSURE 4.3 SENIOR CONTROL ROOM OPERATOR SUPPLEMENTARY ACTIONS i STEP 1. Location: Outside Control Room i Instruct the Control Room Operator to proceed to the 480 Volt West Switchgear Room and perform Enclosure 4.4 of this procedure.

,, STEP 2. Location: 4160 West Switchgear Room (See Enclosures 4.8 and 4.9) a

< Oevice Name of Device Action

] Control Room Page Override

1 HS-PAI Place switch in isolate.

Plant Paging Plant Paging System Announce

. System

l

.1 " Reactor Trip" l

!! .2 " Fire in Control Room, Control Room evacuation."

ir .3 "All operators

.f, assemble at the 4160 j Volt West Switchgear Room.'

a  :

'l .4 If applicable " Loss of Off- Site Power."

j H2SO Shutdown Panel A0Ys and Place both switches ij Turbine Bypass Isolation in the close position. i

.l Switches i l

l1: S6A02, S6A03 RC Pump Circuit Breakers Trip breakers and

j S6802, S6803 de-energize control power.

.i

_NQIT{:

All instrumentation on Shutdown (H2SD) Panel fails

" low."

LI-20503B or PZR Level Indication Verify Operating i LI-215030

[ PI-21051 RC Pressure', Indication Verify Operating l'

(. _

'; V Rev. 3 .

C.13A-9 i l

l

- - , ~ ~ - --- ~ z : _- ,,;..-_.  :~,  :: z:  :- , : :' -- , - . _ L__. . - ~:

= = .a.:.. w .~. w a ENCLOSURE 4.3 (Continued)

.) SENIOR CONTROL ROOM OPERATOR' SUPPLEMENTARY ACTIONS A j .../

3 STEP 2 (Continued) l1 Device Name of Device ' Action l TI-21031C and T Hot Indication Verify Operating  ;

TI-21032C l

l a TI-21024C and T Cold Indication Verify Operating  !

TI-21025E LI-23502C MU Tank Level Indication Verify Operating  !

_~

LI-20501A and 0756 Levels Verify Operating  ;

LI-20502A J

PI-20543C and OTSG Pressure Verify Operating PI-205430

!i  !

CAUTION *  !

.l i

If evaluation of plant parameters indicates the plant is going into an overcooling event, trip the )

l AFW pump (P-319) breaker at 4A06.

, Phones Off-site phones Verify Operating - 05-113 Sound-powered telephone Turn switch to off in Terminal Box H7T240

,05-114 Sound-powered telephone Turn switch to off n in Terminal Box H7T240 n

05-115 Sound-powered telephone Turn switch to off in Terminal Box H77240 4

i'!05-209 Sound-powered telephone Turn switch to off p

in Terminal Box H7T240 it"05-210 Sound-powered telephone Turn switch to off il in Terminal Box H7T240 i,

e STEP 3. Instruct operators to line up 'A' HP Injection Pump 3r Make Up Pump powered 'from "A" (as appropriate), carry walkie-talkies, and

,. proceed on assigned tasks.

J l

4 Rev. 3 4

C.13A-10

!I

'I h

a ,

ENCLOSURE 4.3 (Continued) g SENIOR CONTROL ROOM OPERATOR SUPPLEMENTARY ACTIONS STEP 4. Device Name of Device Action 1

4A06 AFW pump (P-319) .1 Place isolation Switchgear switch in isolate.

.2 Open test disconnect switch.

l .3 If an overcooling I

event has occurred j then go to Step 5 and U, start AFW pump (P-319) when plant conditions h permit.

.4 Reset breaker with pistol grip switch, i

.5 Start AFW pump (P-319).

STEP 5. 'After Control Operator isolates those valves controlled at the Shutdown Panel, position the following valves at the Shutdown p Panel:

Device Name of Device Action

\

SFV-23811 HP Injection Valve Position as needed SFV-23508 MU Tank Outlet Valve Verify Fully Open SFV-25003 BWST Isolation Valve Verify Fully Open HV-31827 AFW Cross Connect Valve Verify Closed SFV-20578 AFW Bypass Valve Open as necessary to f feed "B" OTSG i STEP 6. Following valve positioning, if HPI Pump P-238A Is Not Under Clearance:

1 Device Name of Device Action l1 4

4A04 HPI Pump (P-238A) .1 Place isolation

} Switchgear switch in the isolate

position.

I s ,-,

d Rev. 3 C.13A-11 1

1 J -

- u: -~' -

=..u.:... = :: == = = : =n

, *, ' , , i 1

ENCLOSURE 4.3 (Continued)

SENIOR CONTROL ROOM OPERATOR SUPPLEMENTARY ACTIONS '

A

O 1

1 STEP 6. (Continued)

Device Name of Device Action

.2 Open test disconnect switch.

j

.3 Start at switchg' ear

\ 4A04.

4A02 MU Pump (P-236) .1 Place isolation Switchgear switch in the isolate position.

.2 Open test disconnect l switch.

If HPI Pump P-238A Is Under Clearance:

Device Name of Device Action 4A02 MU Pump (P-236) .1 Place isolation i

Switchgear switch in the isolate position. .

.2 Open test disconnect j

switch.

.3 Start at switchgear 4A02.

STEP 7. Establish RCS natural circulation on the '8" OTSG as follows:

4 l

a. Raise OTSG level to approximately 242".

,i

[, b. RCS delta T (That - Teold), approximately 50-60 degrees F.

c. Tc approximately T (sat) for the 0T56.

l CAUTION:

Do not throttle Make Up Flow until a recirculation path has been established. If Make Up is not i required, secure the Make Up pump to prevent damage.

l

[, STEP 8. Restore Pressurizer level to the normal post-trip level of 100 inches compensated (See Enclosure 4.2).

Rev. 3 C.13A-12 J .

u .

ENCLOSURE 4.3 (Continued) p, SENIOR CONTROL ROOM OPERATOR SUPPLEMENTARY ACTIONS STEP 9. Notify the Control Operator that the "A" HPI pump or Nake-Up pump is operating. This allows the Control Operator to de-energize the "48" bus.

NQT[,:

! Do not use Auxiliary Pressurizer Spray. There is no

control over the emergency pressurizer heaters, the HPI isolation valve HV-23801, or the auxiliary spray isolation valve HV-23802.

STEP 10. When operator No. 2 reports from the AFW pump area, instruct the operator to hold until the Control Operator confirms AFW cross-connect is de-energized.

l STEP 11. When the Control Operator confirms that the AFW cross-connect is

de-energized, instruct Operator No. 2 to proceed with Enclosure i 4.6.

I 1 STEP 12. Using HV-31827 raise the "A" 0TSG to 242' commensurate with plant

, conditions. Establish natural circulation cooling on both OTSGs.

f~

t STEP 13. Await notification from Operator No. I and Control Operator that all equipment required to be positioned is now de-energized.

STEP 14. When Operator No.1 reports that the RC Pump seal injection has been restored:

i Device Name of Device Action SFV-23811 HPI Valve Control pressurizer level from the Shutdown Panel at or above 100" compensated a using SFV-23811. (See i

Enclosure 4.2.) l E

n j

  • r' 3 lO l Rev. 3 i C.13A-13

{

O .

e __

,., _, __ , . , , _ , , , _ _ _ _ _ m-_.__.,_,..,,..m

_ _L .

- =: 1 w.,= ..x:= x = :.:.== + -.= - -u= uu A

n .

e i ENCLOSURE 4.3 (Continued) j SENIOR CONTROL ROOM OPERATOR SUPPLEMENTARY ACTIONS p fj 4

STEP 15. Verify the plant is in natural circulation. Refer to B.4, " Plant Shutdown and Cooldown," Section 6.0.

' !!0K:

If seal injection needs to be shut off before establishing the Alternate Recirculation Path, operation of the HPI/MU pump must be minimized to prevent damage due to low flow. Restrict use of .-

. HPI/MU pump to that required to meet limits of 1 Enclosure 4.1.

i '

STEP 16. Walt for the report from Operator No. I that the Alternate Recirculation Path has been established before continuously operating the HPI/MU Pump.

6 STEP 17. Close Make Up Tank Outlet Valve SFV-23508 from 5hutdown Panel.

STEP 18. When Operator No. 3 reports from the Turbine Area that all valves have now been positioned, the Secondary Plant is now isolated with the Main Steam Code Safety Va'Ives removing Steam Generator $;at to the atmosphere.

~

1 STEP 19. If the plant is to be placed in a cold shutdown condition, go to j C.138, "Cooldown from Hot Shutdown to Cold Shutdown with a Fire in j the Control Room."

l .

l 4

-]

ii v

I Rev. 3 j' C.13A-14 L

1

/

I: ....---.-.----..-i...,,---,---,---,----~,--------.--,---------

p .

m jx 3

ENCLOSURE 4.4 CONTROL OPERATOR SUPPLEMENTARY ACTIONS

}

CAUTION:

Control power may not be available to trip buses.

Manual operation of breakers may be necessary.

, STEP 1. Location: 480 Volt West Switchgear Room Oevice Name of Device Action 1 0. S. 6-3 in EMOV (PSV-21511) Open Switch 3 H3CRR Panel Disconnect Switch q 52-3C35 CR0 Breaker Trip Breaker 4 .

STEP 2. Proceed to the 2A183 compartment on the 2Al panel, i.

Device Name of Device Action 1:

2A183 2Al Equipment Place isolation Isolation Compartment switches in isolate

);. ,

for:

' /

SFV-23508 .

SFV-25003 1 .

HV-31827 SFV-20578 nt STEP 3. If thit "A" HPI pump P-238A Is Not Under Clearance:

! Device Name of Device Action 2A102 "A" HPI LOP (P-238A-P1) Place isolation Breaker switch in isolate position and start  !

pump.

I l STEP 4. If the 'A' HPI pump P-238A Is Under Clearance

J Device Name of Device Action

} 2AI0I NU Pump LOP (P-236-P1) Verify breaker is

]l "A" Breaker closed. Start the 4

l . pump.

,i -

,
m, ,

( Rev. 3 C.13A-16 l

4
  • a+~-'=~w;.~, ~ ~

. _, _ _ . . , . _ _ - , , . +. ,, __,,__,n

= - - - w: _.i.. .= :. .aa= =: .u . . . - . . . w: ~ ..-.... - = t ,: ~ - ~ .

-- ~

u. -

it j ENCLOSURE 4.4 (Continued) '.

CONTROL OPERATOR SUPPLEMENTARY ACTIONS '

i STEP 5. Location: West Inverter / Battery Charger Room Device Name of Device Action

, 72-A08 '4A' Control Breaker Verify closed y 72-A04 O/G Control Breaker Verify closed

l y- 72-C03 Control Breaker for Trip SFV-23604 1 72-C05 Control Breaker for Trip j SFV-23aos n

j M7I SFV-23811 HPI SFV-23811 Isolation Place in isolate

'l Switch position q STEP 6. Location
480 Volt East Switchgear Room Device Name of Device Action i

52-3813 CR0 Breaker Trip 28159 AFW Cross Connect HV-31826' Trip d:

d Brea.ker I 28143 SFV-23616 Breaker Trip ,

28166 S,FV-23508 '8' Power Breaker Trip STEP 7. Communicate to Shutdown Panel that the ENOV. CR0s. and AFW cross connect are de-energized. Proceed to 4160 Volt East Switchgear

Room.

l h

fj STEP 8. Location: 4160 Volt East Switchgear Room Device Ngg_gf Device Action 4810 AFW Pump (P-318) Trip and de-energize j Switchgear control power.

3 .

.a s?' . ,

Rev. 3 C.13A-16 I

~

1 l

ENCLOSURE 4.4'(Continued)

J /s CONTROL OPERATOR SUPPLEMENTARY ACTIONS STEP 9. Location: 4160 West Switchgear Room Device -

Name of Device Action -

4A01 4A Bus Supply .1 If 4A01 is closed:

a. De-energize control power.
b. Open test disconnect j switch.

ei c. Go to step 10.

il

.; .2 If 4A01 is open then:

a. Trip and de-energize control power for 4A01.
b. Verify D/G 'A' breaker, 4A08, is closed.
c. Restart the following

-j loads:

. (.. .

! -- .1 AFW Pump (P-319)

.2 NSRW Pump (P-472A)

.3 HPI Pump (P-238A) or MU Pump (P-236)

,; The following loads are located in the 480 Volt West Switchgear Room:

.4 HPI Pump LOP (P-238A-P1) or MU Pump LOP (P-236-P1)

.5 Emergency Pump Room il

o Coolers (A-500A and C)

.6 NSCW Pump (P-482A)

.7 Emergency Pump Room Fans (A-529A, 8, and 0) l

.- .8 O/G "A" Supply and Exhaust Fans (A-544A and 8)

Rev. 3

, C.13A-17 e

I

.i-I

/

I e o _.

i} .

3 ,

li -

i ENCLOSURE 4.4 (Continued)

CONTROL OPERATOR SUPPLEMENTARY ACTIONS  ; g" --

q g .'

i STEP 10. Device Name of Device Action i

4A10 4A Bus Alternate Trip and de-energize Supply Breaker. power.

STEP 11. Device Name of Device Action i

i 4A08 O/G "A" Breaker .1 If 4A01 was open in step i 9, abcVe.

1 a. Place isolation switch t

in the isolate position.

I -

b. Open test dis- connect
- switch.

t 1

c. Go to Step 12.

I

.2 If 4A01 was verified closed in step 9, above,-

then
q i
a. Place isolation switch

. in the isolate position.

b. Open test dis- connect switr.n.
c. h rify 4A08 is ogen.

STEP 12. Device Name of Device Action 4A07 NSRW Pump (P-472A) .1 Place isolation Switchgear switch in the isolate 4

position.

,?, .

4

.2 Open test disconnect 6

switch.

$ .3 Start NSRW Pump (P-472A).

L Rev. 3 C.13A-18 8

e 0 0 J-

< a- -

~

5 .

ENCLOSURE 4.4 (Continued) fr . CONTROL OPERATOR SUPPLEMENTARY ACTIONS STEP 13. Device Name of Device Action

, 4A09 Load Center Supply .1 Place isolation 1 Breaker switch in the isolate I position. l

.2 Open test disconnect ,

switch. '

I q .3 Verify 4A09 is closed.

i

! STEP 14. Device Name of Device Action 1

4A05 OH Pump (P-261A) .1 Place isolation j Switchgear switch in the isolate position.

.2 Open test disconnect

  • switch.

.3 Verify OH Pump (P-061A) is

, off.

f .

1

(-

STEP 15. Device Name of Device Action

l 4C10 Bus Supply Breaker Trip and de-energize Unit Auxiliary control power.

Transformer No. 2

4C01 Start-up Transformer Trip and de-energize
No. 2 control power.

CAUTIONi Failure to confirm the "4E" bus is de-energized before securing the "40" bus will result in damage to the Main Circulating Pumps due to a loss of component cooling water.

O STEP 16. Confirm the "4E" bus is de-energized with the Shutdown Panel.

1 t

e kms/ Rev. 3 C.13A-19

-s N ,

e

, ENCLOSURE 4.4 (Continued)

j. CONTROL OPERATOR SUPPLENENTARY ACTIONS  ;@

e

' G) i STEP 17. Location: 4160 Volt East Switchgear Room Device Name of Device Action i

4001 Start-up Transformer No. 2 Trip and de-energize control power.

4010 Unit Auxiliary Transformer Trip and No. 2 de-energize control power.

STEP 18. Establish communications with the Shutdown Panel and verify that

the 'A' HPI pump or the Nake Up pump is operating.

CAUTION:

'f The Operator at the Shutdown Panel must verify that

the "A" HPI pump or the Nake Up pump is operating before proceeding.

l STEP 19. Device Name of Device Action

!' 4811 D/G '88reaker Trip and de-energize control power.

I 4801 Start-up Transformer

' Trip and de-energize No 2 control power.

! 4804 Nuclear Services Supply Trip and de-energ,1ze i

Transformer control pow 3r.

STEP 20. Establish communications with Shutdown Panel a'd report that all equipment required to be positioned has been de-energized.

l STEP 21. Location: MSEB 4160 Volt West Switchgear Room Device Name of Device Action l 4A207 NSS Transforne'r X74 Trip and de-energize control power.

4A203 Start-up Transformer Trip and de-energize No. 2 control power.

Rev. 3 l:4 C.13A-20 i

e b.

~1 .

?

ENCLOSURE 4.4 (Continued) j p CONTROL OPERATOR SUPPLEMENTARY ACTIONS STEP 22. Location: NSEB 4160 Volt East Switchgear Room Device Name of Device Action 48207 NSS Transformer XN Trip and de-energize

. control power.

48203 Start-up Transfonier Trip and de-energize No. 2 control power.

)

STEP 23. . Return to 4160 Volt West Switchgear Room i

,4

\

t P

e 1

.r 1

,Y O Re. 3 C.13A-21 6

6 e

. . . . n

g _ _ _ _ _ _ _ . u _..._...u _ _ _ a .. .t . __. _ a _ _ m 1 -

t .

ENCLOSURE 4.5

'3 OPERATOR NO. I SUPPLEMENTARY ACTIOKS J

] -

CAUTION:

Control power may not be available to trip buses.

Manual operation of breakers may be necessary.

STEP 1. Location: 480 Volt West Switchgear Room Device Name of Device Action j 3A05 3A Bus Supply Breaker .1 Place isolation switch J

in the isolate t.

pos1 tion.

I .2 Verify 3A05 closed.

3A09 R8 Spray Pump Trip I.

(P-291A) Breaker 3A10 R8 Emerg. Cooler Start unit and trip

] (A-500A) Switchgear 125 Volt DC control power.

3A13 0/G 'A' Vent Fan Start fan. 3 3A14 R8 Emerg. Cooler Start unit and trip (A-500C) Switchgear 125 Volt DC control power.

3A17 0/G "A" Supply Fan Start fan.

3A18 NSCW (P-482A) Start unit and trip Switchgear 125 Volt DC control power.

2A116 Emergency Pump RM Fan Close the breaker.

Breaker l

'i 2A121 i SFV-23645 Breaker Trip 2A124 Emergency Pump RM Fan -_ Close the breaker.

i Breaker 2A118 Emergency Pump R4 Fan Close the breaker.

Breaker II -

}

1 '

n, Rev. 3 C.13A-22 t

r -

l i

l

l .,

i ENCLOSURE 4.5 (Continued)

"A OPERATOR NO. 1 SUPPLEMENTARY ACTIONS l N. l STEP 1. (Continued)

Device Name of Device Action 2A172 MU Tank Outlet Valve Close "A" Breaker 2A164 HV-26046 Breaker Trip

{

j 2A160 HV-20560 8reaker Trip 2A162 HV-20597 Breaker Trip 2A150 SFV-50011 Breaker Trip i

2A149 SFV-50009 Breaker Trip 2A148 SFV-50007 Breaker Trip 2A147 . SFV-50005 Breaker Trip 2A144 SFV-29107 Breaker Trip d (~ .

2A142 HV-26105 Breaker Trip 2A140 SFV-26017 Breaker Trip 2A141 SFV-26019 Breaker Trip 2A138 SFV-26005 Breaker Trip

~$ STEP 2. Location: East Inverter / Battery Charger Room Device Name of Device Action 72-003 SFV-23810 Control Breaker Trip on S00 Panel J'72-005 SFV-23812 Control Breaker Trip

?

on S00 Panel q

72-801 "B" SF8 Solenoids Trip -

t 72-804 '8' Diesel Control Power Trip 72-807 '8' 01esel Control Power Trip V -

Rev. 3 C.13A-23 l .

i '

-~ - '

-._.2 2.: :-.;- G :. -.:-.

.-l 1

ENCLOSURE 4.5 (Continued) ,

, OPERATOR NO. 1 SUPPLEMENTARY ACTIONS qi i -

. vl i I

} STEP 3. Establish communications with Shutdown Panel and notify the l Operator at the Shutdown Panel that all equipment required to be positioned is de-energized.

M_T[:

Keys are required to enter the DH Cooler Room. They i are kept at the Shutdown Panel (H2SD).

}

  • j STEP 4. Proceed to the (-)20 foot level of the Auxiliary Building in the 1

Containment Penetration Area.

i q STEP 5. Location: Containment Penetration Valve Area (-)20 foot Auxiliary  !

i Building

\

d Establish communications with the Shutdown Panel and confirm the i Control Operator has de-energized ali equipment required to be '

, positioned.

l l

CAUTION:

Do not proceed until the Operator at the Shutdown j Panel ir.31 cates that the Control Operator has

{i

  • completed de-energizing equipment reqaired to be -Q positioned. .

../

Device Name of Device Action I

"1 SFV-23616 Seal Injection Isolation Verify Open valve

] PV-23606 Seal Injection Flow .1 Isolate air supply, i

j

.2 Bleed off air at tottom of regulator, i .

.3 Open the valve using the handwheel to

obtain 12.0 gpm j total flow (use local flow f indicator, i

FI-23606A),

e

.4 Establish flow q slowly over a five minute period.

O Rev. 3 d C.13A-24 s

't i

e

g.

q .

1

.t ENCLOSURE 4.5 (Continued) {

A UPERATOR NO. 1 SUPPLEMENTARY ACTIONS f }' 's- .

l STEP 6. Notify the Operator at the Shttdown Panel that RC. Pump Seal Injection has been re-established. Verify with the Shutdown Panel Operator that the Control Operator has completed de-energizing the equipment required to be positioned.

STEP 7. Position the following equipment in order to establish the Alternate Recirculation Path.

H ggyjig, Name of Oevice Action PLS-049 MU/0H Cross Connect Valve Verify Open

.j SFV-26040 OH Cooler Outlet Valve Verify Open HV-26038 OH Cooler Bypass Valve Verify Closed '

HV-26047 Cross Tie to 8WST Valve Verify Open HV-26046 Cross Tie to 8WST Valve Verify closed DNS-033 Common Cross Tie to 8WST Verify Open

- ~

Valve

  • HV-26008 LPI to HPI Valve Verify Closed SFV-29108 R8 Spray Isolation Valve Verify closed SFV-29107 R8 Spray Isolation Valve Verify closed STEP 8. Location: Grade Level Auxiliary Building near the Roll Up Door
Device Name of Devici Action HV-23004 Letdown 3-Way Valve Position to Flash Tank PLS-044 MU Tank Inlet Valve verify closed

', STEP 9. Establish communications with the Shutdown Panel. Report that the j Alternate Recirculation Path is established.

l STEP 10. Location: Change Out Area <

Call the Shift Supervisor. Report that Enclosure 4.5 is coaglete and ask for further instructions.

l Rev. 3 t

C.13A-25 e

.t.

1 .. .--. . . - .

t ..

[ EdLOSURE4.6 4

l m

OPERATOR Na. 2 SUPPLEMENTARY ACTIONS d I

k CAUTION:

' .The Emergency Diesel Air Compressor has only five hours of fuel available in the local tanks.

) STEP 1. Location: North Side of the Turbine Building at Grade Level 1

Device Name of Device Action i Emergency Emergency Olesel Air .1 Start the Diesel.

Diesel Air Compressor Compressor a. Yalve into Service Air System.

)

b. Go to step 3.

{ .2 If Diesel does not

start immediately, perform step 2.

2 STEP 2. Device Name of Device Action j Nitrogen Emergency Nitrogen Supply' Open Isolation Valves.

4 ~

Isolation Valve STEP 3. Location: AFW Pump Area Device Name of Device Action n P-318 AFW Pump Trip turbine at pump.

1 a

r 1

1 4

t . - .o 1

Rev. 3 D

, C.13A-26 l

j-

'l t

s >

I ENCLOSURE 4.6 (Continued)

) p OPERATOR No. 2 SUPPLENENTARY ACTIONS 1

STEP 4. Location: '8" OTSG Auxiliary Feedwater Valve Complex Oevice Name of Device Action FV-20528 AFW Control Valve .1 If valve is closed:

j

'a. Gag FV-20528 closed.

} .

j ~ b. Isolate air to 1

.o FV-20528.

I

c. 81eed off air i pressure from

! bottom of j regulator.

.2 If valve is open
a. Isolate air to FV-20528.

3

b. 81eed off air from I/ the bottom of i( regulator.
c. Gag FY-20528

.I closed.

NOTIFY $2 9, lA E SHUT 00WN PA!tR WHEN FV-20528 I}, CLOSED - .

STEP 5. Location: "A" 0TSG Auxiliary Feedwater Valve Complex

! Go through the gate behind the CST to reach FV-20527. Disregard

) RWP requirements.

3 Device Name of Device Action s

i FV-20527 AFW Control Valve .1 If valve is open:

. I, I

a. Gag open FV-20527.

1

.j b. Isolate air to FV-20527.

c. 81eed off air pressure from

>t bottom of regulator.

IO .

Rev. 3 f C.13A-27 1

^-

_.  : . 2:..

c--=.- . - -

ENCLOSURE 4.6 (Continued)

OPERATOR NO. 2 SUPPLEMENTARY ACTIONS

( )'

STEP 5. (Continued)

, Oevice Name of Device Action

.2 If valve is

. closed:

I

a. Isolate air to  ;

FV-20527.

j b. Bleed off air from the bottom of the regulator.

~

c. Gag open FV-20527.

i STEP 6. Location: AFW Pump Area 1

l Communicate with Shutdown Panel and confirm whether the Control

Operator has de-energized the AFW cross-connect. Report the time i the Emergency Olesel Air Compressor was started. When the Shutdown i

Panel Operator confirms the AFW cross-connect is de-energized

! Device Name of Device Action

HV-31826 AFW Cross-connect Valve Verify open J

T

!!971:

f Keys are required to enter Decay Heat Cooler Room.

They are kept at the Shutdown Panel H2SD.

t' STEP 7. Location: Containment Penetration Valve Area (-)20 foot Auxiliary g Building Communicate with the Shutdown Panel and verify all equipment l required to be positioned is de-energized.

i I

i -

. l Rev. 3 b

C.13A-28 5

- ,/

A

-l ,. ,

ENCLOSURE 4.6 (Continued) p C?ERATOR NO. 2 SUPPLEMENTARY ACTIONS

( (,

11.

STEP 7. (Continued)

Device Name of Device Action SFV-23645 MU/HPI Pump Recire. Valve Verify Open SFV-23646 MU/HPI Pump Recirc. Valve Verify Open .

i

.i H8SFV-23508 SFV-23508 Hand Selector a Normal power supply Junction 80x Switch ON SFV-23810 HPI '8" Injection Valve Verify Closed 1

1 SFV-23812 HPI '8" Injection Valve Verify Closed SFV-26017 OH Cooler Isolation Yalve Verify Open J

SFV-260'49 OH Cooler Isolation Valve Verify Open SFV-23604 MU Line Isolation Valve Verify Closed .

SFV-23809 HPI "A" Injection Valve Verify Closed p -

SFV-50005 R.8. Cooler Isolation Verify Open t, , valve SFV-50007 R.8. Cooler Isolation Verify Open j valve SFV-50009 R.8. Cooler Isolation Verify Open Valve t i SFV-50011 R.8. Cooler Isolation Verify Open .

I l Valve i

HV-20611 S/G Drain Isolation Valve Verify Closed i

i STEP 8. Location: Change Out Area i

d dalltheShiftSupervisor. Report that Enclosure 4.6 is complete

] and ask for further instructions.

I i

i i .

li(,/

i Rev. 3 C.13A-29 l -

l l

........:-- - .~:L - : - --- -

  • =* ~ ~~~~ ' *~ '~~~~ ~ ^ '

/

~

I l a ENCLOSURE 4.7 J

OPERATOR NO. 3 SUPPLEMENTARY ACTIONS , l 1

i i STEP 1. Location: Diesel Generator "A" Room I Device Name of Device Action

'A' Olesel Diesel Generator Generator

. 1 Place the 3 isolation switches on panel and and H20GA in the isolate 3+ P-888A/8 Fuel Oil Transfer position.

+ Pumps

}

' . 2 If a loss of off-site power has occurred, I

verify D/G 'A' has il started. ,

. 3 If not started, start the diesel in accordance with A.31, .

] ' Diesel Generator  !

System."

i i

H7J272 D/G Fuel 011 Transfer Place in " Auto."

3* Switches .

'l STEP 2. Location: Main Feed Pump Control Panel Device Name of Device Action h Main Feed i

Main Feed Pump . 1 Verify turbine tripped Pumps "A" Turbines light is on. .

and '8"

. 2 Check turbine rps indicator. '

i s

. 3 Trip turbine, if necessary.

STEP 3. Location: Transformer Area at Grade Level Eggjig, Name of Device Action 4E13 Start-up Transformer No. 2 Trip and de-energize

! control power l,

4 4E07 Unit Auxiliary Transformer Trip and de-energize j No. 2 control power e

Rev. 3 C.13A-30 ww e- mv7-em- W Wy e -wwsweW-w'+p-wrh-v-g--++=94--+*ese--G-*-* ex-- --wy-w eg1- - = -ewyv---e-ye--=-'-em---- - -w*Wr'-'---9-----+- -- * -'s -e

] .

~

ENCLOSURE 4.7 (Continued)

(S OPERATOR N0. 3 SUPPLEMENTARY ACTIONS s

i STEP 3. (Continued)

I Device Name of Device Action

  • i I

4E06 Start-up Transformer No. 2 Trip and de-energize control power 4E01 "4E' Bus Normal Supply Trip and de-energize f q control power )

, STEP 4. Notify the Shutdown Panel the '4E" bus is de-energized.  !

d '

1

[ STEP 5. Location: Turbine Area Establish communications with the Shutdown Panel and remain in place until the Shutdown Panel Operator confirms the Control Operator and Operator No. I have de-energized all equipment required to be positioned.

Device Name of Device Action Lt

(

(_.

HV-32243 Pegging Steam Valve Close Manually HV-20597 Main Steam to Reheater Close Manually

! Valve n

MV-20598 Main Steam to Reheater Close Manually Valve j HV-20560 Main Steam to Aux. Steam close Manually Valve HV-20565 Main Steam to Aux. Steam Close Manually Valve i

j STEP 6. Communicate to the Shutdown Panel that all valves have been Di positioned.

I.

ll

]

l STEP 7. Return to the 4160 Volt West Switchgear Room.

1 f "> , I D Rev. 3 C.13A-31 1

l l*

L ils..--

.o _: -

i s

] ENCLOSURE 4.8 I I

I SENIOR CONTROL ROOM OPERATOR SIGN-OFF SHEET Time / Initials

1. Control Room evacuation. /
2. Of f-site power available. YES / NO (circle one)

I

3. Assign Operator to complete Control Operator "

supplementary actions (Enclosure 4.4). /

4. Isolate telephone system and announce conditions over PA. /

i 5. Operators 1, 2 and 3 instructed and assigned to tasks. /

6. Identify if Make Up Pump or "A" HPI Pump Make Up Pump /HPI Pump is to be used. (circle one) l 7. Time AFW pump (P-319) started. /
8. Time electrical isolation of all HPI/MU system equipment completed by SCRO. -

/

9. Operator No. 3 reports Main Feed Pump -

l Turbines 'A' and "B" tripped. /

j

10. Verify valves are fully open from Shu'tdown Panel:

j SFV-23811 - HPI Injection Valve /  ;

SFV-23508 - MU Tank Outlet Valve /

}  ;

3 SFV-25003 - BWST Outlet Valve /  !

j HV-31827 - AFW Cross Connect Valve / l

, SFV-20578 - AFW Bypass Valve /

h HPI or MU Pump Started /

l h 11. Operator No. 3 reports '4E" bus tripped /

1 l

i

? 12. Verify RCS is in natural circulation /

i OTSG "A" Level

\ OTSG '8" Level

13. Restore pressurized level to 100 or more /

) Rev. 3 1

C.13A-32 l

1 ,

l f( _ i

l .

4 . .-

l i .

I ENCLOSURE 4.8 (Continued) f} SENIOR CONTROL ROON OPERATOR SIGN-OFF SHEET

[ Time / Initials

14. Instruct Operator No. 2 to remain in position until CO and Operator No. 1 confirm all equipment is de-energized. /
15. Release Operator No. 2 when CO and i

Operator No. I have stated ALL

  • equipment is de-energized.

/

[ 16. Operator No. 1 reports RCP seal injection restored. /

l I 17. Operator No.1 confirms alternate i recire path is lined up. /

I l 18. Operator No. 3 confirms all valves have been positioned. /

'i 19. Time Cooldown Procedure C.138 was initiated. /

l t

t L l

)

l i

1 l

l

\

/~ :

U.. Rev. 3 C.13A-33.

i

p.ma- - _ w. _% -s.

  • y j y Q g q ?j:-'- - ^ ^ -

> Pcg3 Y of.10- ~

1 FLOW CHART AND TIME LINE ,

k

+ :1 4 .*'

g -s j i

1 SENIOR CONTROL ROOM OPERATOR 4

J TIME Ft.0W CHART COMMENTS TIME CCMPt.ETE -

1 L ACTOR b i 14 TatP g.OO - - - - - - - ---- <

4 A - I---------------------

RCEISg7 M q TR1{RE l

t=01 - - - - - TRI - - - M* * - - . - - - - - - - - - - - - -

k vas

...cu T.

  • g.02 -- CONTRCL --- _ -_-----_- e b

i g.g3 _ _. _ _.._ _ __ -_ ----____._-

annou.ca -

a p1at g g,.c4 _. - . - - _ ._- -___-_

}

4

.. 't=OS - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

1 I

TRIP MEACTOR

  • j e g T. . .

.O. _ _ _ - _____ _ _ _ _ _ _ _ _ _ _ _._ _ - _ _ _ _ _

g ---.umM-._m----e.i_-e-4-m-_____ p I

L g.cg - - - - . -- --- - ----- -

1' O

q

(

g.Qg --- --,_ --- _- ---- - _ -

tI i

  • l1 q - so T.

g.gg ___

ms ___--_____-__---__-__-

,. n ___ m r., __yg ,m TED

g _ _ _ _ _ _ _.

vtB t=12 -----p---------------------------

POSITICDs Mu 6 ame vat.vES e

ELTART f'U OR *A* O t=13 -~~ ---------------------

l s.i. _ _ _ . - _ _ _ .__________________________

'l 1*

l.
  • t 6

4 M.,

.: ^ \

.W LI 4

1 Rev. 3 I C.13A-34 st .

' . ENCLOSURE 4.9 (@cntinued)

Pcg3 2 of 10 e

FLOW CHART AND TIME LINE

.i

' O SENIOR CONTROL ROOM OPERATOR 5

TIME Ft.ou CHAR 7 COMMENTS TIME COMPT.ETE

,..iS _ . _ _ _ _ _ .________________._____.____

TIME SHIFT s.t. - _ _ _ _ _ . .__________________________

?

s.it _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4

,. . u -_____. _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ . -

^

,. 27 _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

l TIME SHIFT I \

"** ~ g

, .z,1 so -- -

-- Ec5$" 2 EJ E '".. -

i E

t..as - _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

)

~ INsfnuCT ope as 70 P#CCEED WITM ENCL 4.7 2 3a _.

_________._____________J

}

4

] t,.31

.--.___.__._____.________-_-_.m f TIME SHIFT NOTIFY C.O. *A* Mpf

, I ..u s

.x - . _ _ _ _ _ .

TIME SHIFT '

ta40 - - - - - ._ _ - _ _ _ - - _ _ . , _ l i i i

NOTIFY OPS s2 ALL

t. 45 - - - EcutenENT IS _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _

g.43 _

OEENERGt2ED NOTIFY Op# st ALL\

Eou t paiENT ts vEstFv NATURAL

  • C t
  • cut.A 7 t CN ef.m

( pSO - CEEName12E0 \ __

op S.+ F4C. s.o _ _ _ , , _

TIME SHIFT

, g.70 - - - - - - - - - - - - - - - ~ ~ - - - - - - - - - - - - - . - -

I

t. 90 -- --- - - - - - . - - - - - . . - -
CLoSE *
SFv-23 SOS e
t. 100
t. 310 - ._ y__ _ _ _ _ _ _ _____________

CONTACT ALL ygg e

NQ GO TO

'i OPERATORS ANC T SMUTOOWN ,

ASSESS STATUS W C.138 t=130 - - - - - - - - - - - - - - - - ' - - - - - - - - - - - - - - - - - - .

Rev. 3' C.13A-35 t- . - . .* . . . . . _, , , -o

.__ ---l

=. , _ - _ . . . .. . . - . ..

3 ENCLOSURE 4.9 (continu:d) .

FLOW CHART AND TIME LINE 4

.e

)

i CONTROL OPERATOR  ;

1 l

TIME Ft.OW CHART COMMENTS TIME COMPT.ETE l

ACTOn s une14 TRIP g.co _ _.._ _ _ _ _ _ _ _ . .

TRIP Ru f equ2Sg g NO f t=01 ---- Tat ____nL_______________

TES J

F *

-$ Evacuate 6

amms seO T

I SWIT AA t.=C 4 ---

y e

OPEm.0.S.S
.

t.c4:30 - - -

e s.og - - - - _ _ . ______ __ _ _________- _

l i J l 8

g.og - - - - _ _ . ----__ __

I 4 3GL.A TR i 80' '"""'"7 i

  • l i t=06:30 -

e 8 au au want g INv'*A7 ' cum l

~l 8 sq __

i s

g teos ------- -------------------------

4, -

1 t=OS ------< -------------------------

t j tSOLATE

, seI vAs.vtS e _

g.go ___ _______________

}

I 1

aansvt 400 EA T SWIT AA

[ s gg ___ ______________________

l 4

INFORM SDP ISOLATION s AFW

  • r.COMPLET COMee OE 44GtZED --------------------

t = 12 . --

6 i AARivt 4180 AST ll, Set CMGEAR ----------------------

, t=13 ---

g i *

  • P80CEED 4180 4

( P-3 t S S Set 4810 NEST SWITCMOEAA t=14 --

i 1

0 l

l' u

([

it a,

Rev. 3 C.13A-36

~

~

WTdfeMonL4 0.0 (@cntinued) l g' '

Pcg3 4 of 10 FLOW CHART AND TIME LINE i 1

?

1 h

s n

Ds -

j . CONTROL OPERATOR I TINE Ft.OW CHART COMMENTS T!ft COMM.ETE a

k 1

t=15 ---

g7eg, g.

- - - - ~ ~ - ------- o --

TIME SHIFT sus e __

t.is --- -_______--

j .ONF.!

peQ WAt? FQm .

q

J or m a** *0a VT S

4 t=21 4

t=22 EAmatvs Asv sW I g l - - - - - - - - - - - - - - - - - - - - -

,,.!.,.- ---um----um----u----------------------

s t=24 ---

WAIT FOR WP e

'I

  • ga27 e e _ -..-e-----e- - --

1 TIME SHIFT Mc t=29 ------<-u------m------ ------------

} outs g

ge23 -__ .DNF A* e I.e 3 8e0 yTOgSTAR p.Tg -.um.--.--

FROM SOP 788 YES t=30 ,

4 STRIP "S* i gyg START Mu gm31 -_- -______I '** E I --------

T!!( SHIFT I

- IDFORM SEP 34 ___

NI _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _

1 l

't j STWIP

  • sees *

. WEST 4100

  • t=35 --- ----------------------

TIME SHIFT I STalp asas k EAST 4160 t ,, m 4o --- ----------------------

I k AETumN TO 4150

!' <ST .

sWITCMGEAR t=45 - emm - ---------------------

l,

'e t

j t.=50 ------------u-------------------

t TIME SHIFT g.7o _ __________-_______e______---

4 .

h5 esquuD e a _ _ enum emum em uuuum dunum emuuuP duuuum muim eem _ em _ eum e.um .imuD emmD miD emmB GEmuD m m emm e.um eum ammin e. ump - WWW l

i

. sett0 -------------------------------

i

,..,3o _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

,e.

4 1

h  !

l l

Rev. 3 ,

C.13A-37 Lk

- -~ -

', ENCLOSURE 4.9 (Continued) ..

Pcg3 5 of 10 i .

I FLOW CHART AND TIME LINE i

a

?

5 ri

.*  % .s i OPERATOR NO.1 TIME Ft.0W CHART COMENTS TIME COMPT.ETE 4

TWim t.QQ - = . - - - - - <- - - - - - = = = = - - - - - = = - - _ - - - = - = - - - =

t j ,,.o g _ _ _ _ _ _ ._________________________

. ,..aa - _ - - - - - _ . - - _ - - - - - - - - - - - - _ - - - - - - - - - - -

h 2 g _ a e _ _ m.e _ a .e__e.eee--e-eseeu._amm---e-----*--'-----'-*

?,

t=O4 - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

i t.=OS - - - - - - --------------------------

I . e 5

g.Qg - - _ . - _ _ _ _

. I h t.=O7 ------- ------------------------J l

1 1

l,

, s.og - _ _ _ _ _ . -- -____ ____ _ ___ ____

i AMIVE G 4100 W ST O

  • SheI TMAA t.= 10 ---

1 aAA J 480 W 7

} Sint t AA ______________________

g gg ___

l

[

, t. 12 - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - -

P r

- g.g3 ______.-________________________

l F;

,,. g 4 ______.-________________________

b p g..

5 i

J Rev. 3 i

C.13A-38 9 .

m_ _ _ _ _ _ _ _ _

~

m- __

1 Pcg3 6 of 10 4 - -' FLOW CHART AND TIME LINE p --

OPERATOR NO.1 TIME Ft.OW CHART- CCMMENTS TIME CCMPt ETE s

i ISOLATE *3A*

ERJIPrecT e t=15 ---

, TIME SHIFT 4

j t=18 ------- --- .---------------------

I,,

j ISOLATE *2A*

  • I
EQUIPMDef , e --

ge21 - - - - - - - - - - - - - - - - - - - -

a 6 t

I'- Asu

Nv dt %AEASTa _---___.-.

y ge34 ___ _ -- _

NOTIFY SOP i

t.2. _--- l TRIP sEANEh AWiWils .

ge27 - . - - - - _ _ _ - -- - - - - _ - - - _ - - - - - -

TIME SHIFT t,) t=28' - - - - - - - -- .----------------------

t=2S - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - -

4 1

s.

4 a s.30 _ _ _ - - .________-_______________

~f s.3g ______.--_______--__________--__

TIME SHIFT AsutivE <-s ac LEVEL- e ga34 -__ --- --._ -- -

4

t. = 35 --------------------------------

i TIME SHIFT

, IEESTOM IECP i SEAL INACT t tps 4 t=40 ___ ___-----_--___--___---

i I t=45 - - - - - - - - - -

It#C#M SDP ItCP O SEAL [N XCT[ON

  1. ESTC=EO e 1

ts4G --

g.50 - - - ' - - - - - --------------------------U TIME SHIFT O

k, ESTASLISM ------- e ts90 ---

ALTEstesA rt

[wm ,

.: HEC 1RCULAT IC;, gOp e s

    • f"

{' t=100 - - -

r .

AR4[VE CHANGEOUT G t.:to --__--_____ ,,,/,#5to,ct,,t,,0,, -_____ . -

t s.g3o __________---_______-________--

+ .

f -

)

4 K,

is . ,

Rev. 3 f-E C.13A-39 , .

s .. . . . 9

. ENCLOSURE _4.9.(Contin.. ued) - _:.;:..:-

_ .a : . .-.-.. _.-

~

i

. Pcg3 7 cf 10' .'

a l -

l 1 FLOW CHART AND TIME LINE- . <

i 1 -

OPERATOR NO.2 TIME Flow CHART CCMMENTS TIME COMPT.ETE ACTOR 6

1JAGI(

TRIP tsOQ --- -.- - - - - - - - - - - . - - - - -

1, tog 1 - . - - - - -- - - - - - - - - - -

g.02 ------. ------------------------

g.C3 ------.-------------------------

t=C4 --------------------------------

.i i

t

, gmQg - - - < . ---- - - -- --- --

t

  • s.og ------.- - - - - - - - - - - - - - - - - - - - - - - - -

- .i 1

s.o, - - - - _ _ .-_____-______._____- __ __

t t

t tsOS ------. - - - - - - - - - - - - - - - - - - -

s 03 ------. ------------------------

j AARIWE e 4860 W ST swtTC W AR #

,, t=10 --- ---------------

1 A

l' (

gut 1 - - - - - - <

l STAmt EMERosmcv ug un cPEN Na e IE AIR ogg ISOLATION SSOR vALvis #

t=12 -- - TAa =

s b YES

  • tatP A I PLse t8.Pw3103 l' Tup 0tNE s.g3 -- ----------------------

i.

[

1*

t=14 --------------------------------

e

. (

, .i a. s.a-

  • g.,.7W L

Rev. 3 1 C.13A-40 * '

l

$_____--__ ^

.-A

I. .

ENCLOSURE 4.9 (Continued)

- - -- , P2g3 8 of 10 s

FLOW CHART AND TIME LINE 9

,s A.% .

i OPERATOR NO.2 TIME FLOW CHART COMMENTS TINE COMPLETE, t.15 -_-___<-______________--_--_-_-_

TIME SHIFT AmalvE AT I av-aos2e

t. 16 : 30 _ --

t .. ___ ,,I, ,, ______________________

s

t. 19:30 --

"W f

y ,,.21 ---_--<- - - - - - - - _ - - _ - - - - - - - - - _ _ _ -

AARIvs ig Pv-aos*7 s.23 --

S t=24 -_- --._--_-_---_--_-__-

,g rv.m yaos27 ,

t.=26 s 30 ---

2, _ _ _ _ _ _ ._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _

t TIME SHIFT- e I e AmaIvs sop waly pom e 9 ,. 23 --

ww-sis 2s CONSI#M co 3 veniry x-CONN ggpggy Mv-StS2s ENERGI l

4 s.28 30 -_

vts gm23 _ _ - - <_ - -___ __ -_ -_ ____

..a ______._________________________

n

! \

! g.31 - _ _ _ _ < ___ -___ - ________-

TIME SHIFT t .

t

),-

. e a

,, . 35 - _ _ _ _ - .--_ __ _____y________.

TIME SHIFT Aansvt t-sao 50' uo wAlf som o t.Evtb 'ALL CONF E MN'" T CO.& ope et e g.37 __ EPORT OEEhE ZEQ7 t.40 ---------_----s ----_--_ ---__ -

N J

, s.45 _______________________________

vtS '

j .So. _ _ _ _ _ _ ._________________________

TIME SHIFT f" .... ___ _ , vE .A _, _______________ e _

AREA C Att. O

.e pHtFT SUPERvISON q -7s --

t.so _____'____ _____________________

J g.3go _______________________________ l

\

s.

' (. . t=130 -------------_-----------___---

U i

l

?

- Rev. 3 C.13A-41 I ee .

y .- _ _

~.a...

/ 'J4 C L O S U R E 4 . 9 ( C : n t i n u e d ) .+ .

, Pcg3 9 cf 10- .- '

./ '

FLOW CHART AND TIME LINE m

.y..

OPERATOR NO.3

TIME FL.0W CHART COMMENTS TIME COMPLETE ACTOR 6 14 TRI9 g.00 --.-. -<- - - - - - - - - - . - . - - - - - -

taCl ----------------------__--------

~

t=O2 ------< - - - - - - - - - - - - - - - - - - - - - - - - - -

g.o3 _ _ _ _ _ _ .-_-______________-----___

g 04 - _ _ _ _ _ .--__________--_______----

t.Q5 - -- _<- _-- -_ - - - __-

4 g.og - - - - - - ,---__--- _ _ -_____------

. g.07 ------.________--_-__--________- ,

s.og - - _ _ _ _ < - - - - - - - - - - - - - - - - - - - - - - - -

1 i

=g.03 -<

a AARI G 4tec sf SWITOWIEAN O g.go -__ ___-----____---

e s.it ___

gig,A ,,. .A. ,,, _ _ _ - - - _ _ -- _ _ - - .

. gnagarg WI47 t=11:30 ---

. g.33 - - - _ _ - .-__---- _____ ____----_----

I N STAAT O/s .

g.g3 __ .- _ _ . - _ .- _ .. _ - _ - _ _ - . . - -

a

+

t t=14 - - - - - - --------------------------

i

  • g

.i f.

4 kw?

(kr:h Rev. 3 C.13A-42

^~

3.

Pcg3 10 of 10 FLOW CHART AND TIME LINE s-o O -

.,. .s OPERATOR NO.3 TIME , FL.0W CHART COMMENTS TIME Cotet.ETE i

't -

ARG W - *A* &

I"Ip

' 7 S* TUSSINE

  • ag TR1moto -- TURS1NES t=15 --- --

3 --------

TIME SHIFT '

YEs l

strip *et*

SUS g.gg ---

AAR  ! isAIT Fim e S- .

s ,,g-7 sus S s.a -_- A.EA I ca i.O.PAft .

1 0;

YES E

r .... ______________ ___________---____

2 gm27 - = - - - - - - ' - - = = = - - ' - - - ' - - - - - - - - - - - - - - - - - - - = =

TIME SHIFT h gs23 - _ - -- -<- - - - - - - - - - - - - - - - - * - - - - -

g 23 ------.

ga30 - - - - - - - - -. - - - - - - - - - - - . - - - - - . - - _

~' s.31 ------- - - - _ _ . - - - - - - - - - -

n TIME SHIFT g.34 ------,

gegg ---- ,- - - -

TIME SHIFT y

ga40 ----,--- -

4 ga45 - - - - - --<

TIME SHIFT =-------.----------------A f.

t=70 --------<

a t=90 --

gan,gg7g ,os!TtONIMS ~~""""~"""""~~""~"""""""""'"*"""""""""

- MAIN STEAM VALVES t=105

  • Amatvt 4180 ,

WEST Sad!TCMGEAR t=tio --

,,.g30 -

m

' -og e

a'

.i Rev. 3 END j C.13A-43