ML20155D019

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Supporting Cycle 12 Reload
ML20155D019
Person / Time
Site: Oyster Creek
Issue date: 09/22/1988
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20155D014 List:
References
NUDOCS 8810110012
Download: ML20155D019 (8)


Text

3.10 _ CORE Lill!TS Applicability: Applies to core conditions required to meet the Final Acceptance Criteria for Emergency Core Cooling Puformance.

Objective: To assure conformance to the peak clad temperature limitations during a postulated loss-of-coolant accident as specified in 10 CFR 50.46 (January 4, 1974) and to assure conformance to the 14.5 KW/f t (for y and VB fuel and 13.4 KW/f t (for P8x8R and GE2x8EG fuel) operating limits for local linear heat generation rate.

Specification:,A. Average Planar LHGR During power operation, the average linear heat I generation rate (LHGR) of all the rods in any fuel assembly, as a function of average planar exposure, at any axial location shall not exceed:

A.1 Fuel Types V and VB The product of the maximum average planar LHGR (llAPLHGR) limit shown in Figures 3.10-1 (for 5-loop operation) and 3.10-2 (for 4-loop operation) and the axial liAPLHGR multiplier in Figure 3.10-3.

A.2 Fuel Types P8x8A and GE8x8E8 The maximum average planar LHGR (!!APLHGR) limit shown in Figure 3.10-4 and 3.10-5 for both 5-loop and 4-loop operation.

A.3 If at any time during power operatton it is determined by normal surveillance that the limiting value for APLHGR is being exceeded, action shall be initiated to restore operation to within the prescribed limits, if the APLHGR is not returned to within the prescribed limits within two (2) hours, j action shall be initiated to bring the reactor to the cold shutdown condition within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. During this l period surveillance and corresponding action shall continue until reactor operation is within the prescribed limits at which time power operation may be continued.

B. Local LHGR During power operation, the linear heat generation .

.1 rate (LHGR) of any rod in any fuel assembly, at any I axial location shall not exceed the maximum allowable LHGR:

8810110012 Geo9%

[DR ADOCK o soooh9 P Ds..

OYSTER CREEK 3.10-1 Amendment No.: 16, 24, 35, 39,

, 48, 75 7327f '

B.1 Fuel Types y and VB As calculated by the following equation; LHGR.4 LHGRd [ 1 - g max (,1) ]

P LT Where: LHGRd = Limiting LHGR (=14.5)

AP = !!aximum Power Spiking Penalty P (=0.033 and 0.039 tor fuel Types V and VB respectively)

LT = Total Core Lengtn - 144 inches L = Axial position above bottom of core B.2 Fuel Type P8x8R and GE8x8EB LHGR a6 13.4 KW/ft, 8.3 If at any time during operation it is determined by normal sarve111ance that the limiting va'uc of LHGR is being ext aeded, action shall be initiated to restore operation to within the prescribed limits. If the LHGR is not returned to within the prescribed limits within two (2) hours, action shall be initiated to bring the reactor to the cold shutdowr condition within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

During this period, surveillance and corresponding action shall continue until reactor operation is within

, the prescribed limits at which time power operation may be continued.

C. Minimum Critical Power Ratio (ItCPR)

During steady state power operation, MCPR shall be greater than or equal to the following:

1 APRf1 STATUS MCPR Limit

1. If any two (2) LPR?1 assemblies which 1.51 are input to the APRf1 system and are l l separated in distance by less than l three (3) times the control rod pitch '

contain a combination of three (3) out of i

four (4) detectors located ir. either the A and B or C and 0 levels which are fsiled or bypassed 1.e., APRi1 channel or LPRf1 input bypassed or

inoperable.

0YSTER CREEK 3.10-2 Amendment No.: 16, 24, 35 39 48, 75, lll 7327f l

A_P_Rf1 STATUS  !!CPR Limit

2. If any LPRM input to the APN1 system 1.51

, at the B, C, or 0 level is failed or bypassed or any APRf1 channel is inoperable (or bypassed).

3. All B, C, and 0 LPRii inputs to the i.51 APRi1 system are operating and no APRfi channels are inoperable or by passed.

When APRl1 status changes due to instrunent failure (APRii or LPRf1 input failure), the fiCPR requirement for the degraded condition shall be met within a time interval of eight (8) hours, provided that the control rod block is placed in operation during this interval.

For core flows other than rated, the nominal value for flCPR shall be increased by a f actor of kf , where kr is as shown in Figure 3.10-6.

If at any time during power operation it is determined by normal surveillance that the limiting value for flCPR is being exceeded for reasotis other than instrument f ailure, action shall be initiated to restore operation to within the prescribed limits. If the steady state llCPR is not returned to within the prescribed limits within two 2]

hours, action shall be initiated to bring the reactor to the cold shutdown condition within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. During this period, surveillance and corresponding action shall continue until reactor operation is within the prescribed limit at which time power Operation may be continued.

.Basy :

The Specification for average planar LHGR assures that the peak cladding temperature following the postulated design basis loss-of-coolant accident will not exceed the 2200'F limit specified in 10 CFR 50.46 (January 4, 1974) considering the postulated effects of fuel pellet densification.

The peak cladding temperature following a postulated loss-of-coolant accident it prinarily a function of the average heat generation rate of all the rods of a fuel assembly st any axial location and is only j dependent secondarily on the rod to rod power distributica within an assembly. Since expected location variations in power distribution within a fuel assembly affect the calculated peak clad temperature by l less than + 20*F relative to the peak temperature for a typical fuel design, the limit on the average linear heat generation rate is sufficient to assure that calculated temperatures are below the limits specified in 10 CFR 50.46 (January 4, 1974).

0YSTER CREEK 3.10-3 Anendment No.: 75 7327f  ;

t .

The maximum average planar LHGR limits of fuel types V and VB are snown in ,

Figure 3.10-1 for five loop operation and in Figure 3.10-2 for four loop j operation, and are the result of LOCA analyses perfomed by Exxon Nuclear  !

J Company utilizing an evaluation model developed by Exxon Nuclear Company in 1

compliance with Appendix K to 10 CFR 50 (1). Operation is pemitted with the i four-loop limits of Figure 3.10-2 provided the fif th loop has its discharge l valve closed and its bypass and suction valves open. In addition, the maximum  !

avera2e planar LHGR limits shown in Figures 3.10-1 and 3.10-2 for Type V and  !

VB fuel were analyzed with 100% of the spray cooling coefficients specified in

^

j Appendix K to 10 CFR Part 50 for 7 x 7 fuel. These spray heat transfer  :

] coefficients were justified in the ENC Spray Cooling Heat Transfer Test j Program (2).

The maximum average planar LHGR limits of fuel types P8x8R and GE8x8EB are  !

a shown in Figure 3.10-4 and Figure 3.10-5, for both 5-loop and 4-Ioop i

operation, and are based on calculations employing the models described in j

) Reference 4. Power operation with LHGR's at or below those shown in Figures i 3.10-4 and 3.10-5 assures that the peak cladding temperature following a l postulated loss-of-coolant accident will not exceed the 22000F limit.  !

! The effect of axial power profile peak location for fuel types V and V8 is evaluated for the worst break size by performing a series of fuel heat-up calculations. A set of multipliers is devised to reduce the allowable bottom skewed axial power peaks relative to center or above center peaked profiles. l l The major f actors which lead to the lower HAPLHGR limits with bottom skewed l 4 axial power profiles are the change in canister quench time at the axial peak [

location and a deterioration in heat transfer during the extended downward j j flow period during blowdown. The HAPLriGR multiplier in Figure 3.10-3 shall l

> only be applied to MAPLHGR detemined by the evaluation model described in l

reference 1. l The possible effects of fuel pellet densification are

j j l 1) creep collapse of the cladding due to axial gap fomationi l

2) increase in the LHGR b9cause of pellet column shortening * '

I 3) power spikes due to axial gap fomation; and {

j

4) changes in stored energy due to increased radial gap size, '

4 Calculations show thot clad collapse is conservatively predicted not to occur l during the exposure lifetime of the fuel. Therefore, clad collapse is not j considered in the analyses.

i i Since axial thermal expansion of the fuel pellets is greater than axial

$ shrinkage due to densification, the analyses of peak clad temperatures do not

consider any c,hange in LHGR due to pellet column shortening. Although the 3 formation of axial gaps might produce a local power spike at one location on any one rod in a fuel assembly the increase in local density would be on the order of only 2% at the axial midplane. Since small local variations in power distribution have a small effect on peak clad temperature, e spikes were

not considered in the analysis of loss-of-coolant accidents )

l. 0YSTER CREEK 3.10-4 Amendment No.: 75 i

7327f

}

Changes in gap size affect the peak clad temperatures by their effect on pellet clad thermal conductance and fuel pellet stored energy. Treatment of this effect combined with the effects of pellet cracking, relocation and subsequent gap closure are discussed in XN-174. Pellet-clad thermal conductance for Type V and VB fuel was calculated using the GAPEX model (XN-174).

The specification for local LHGR sssures that the linear heat generation rate in any rod is less than the limiting linear heat generation rate even if fuel pellet densification is postulated. The power spike penalty for Type V and VB fuel is based on analyses presented in Facility Change Request No.6 and FDSAR Amendment No.76, respectively. The analysis assumes a linearly increasing variation in axial gaps between core botton and top, and assures with 95%

confidence that no more that, one fuel rod exceeds the design linear heat generation rate due to power spiking.

The power spike penalty for GE fuel is described in Reference 3. l The loss of coolant accident (LOCA) analyses are performed using an initial core flow that is 70% of the rated value. The ratiorale fer use of this value of flow is based on the possibility of achieving full powrr (100% rate power) at a reduced flow condition. The magnitude of the reduce! flow is limited by the flow relationship for overpower scram. The low flow condition for the LOCA analysis ensures a conservative analysis because this initial condition is associated with a higher initial quality in the core relative to higher flow-lower quality conditions at full power. The high quality-low flow condition for the steady-state core operation results in rapid voiding of the core during the blowdown period of the LOCA. The rapid degradation of the coolant conditions due to voiding results in a decreaso in the time to boiling transition and thus degradation of heat transfer with consequent higher peak cladding temperatures. Thus, analysis of the LOCA using 70% flow and 102%

power provides a conservative basis for evaluation of the peak cladding temperature and the maximum average planar linear heat generation rate (MAPLHGR) for the reactor.

1 The APRM response is used to predict when the rod block occurs in the analysis of the rod withdrawal error transient. The transient rod position at the rod block and corresponding liCPR can be determined. The MCPR has been evaluated for different APRM responses which would result from changes in the APRM st6tus as a consequence of bypassed APRM channel and/or failed / bypassed LPRf1 inputs. The steady state ftCPR required to protect the minimum transient CPR of 1.07 for the worst case APRM status condition ( APR!i Status 1) is determined in the rod withdrawal error transient analysis. The steady state ItCPR valves for APRM status conditions 1, 2, and 3 will be evaluated each cycle. l I

The time interval of eight (8) hours to adjust the steady state of MCPR to

( account for a degradation in the APR!i status is justified on the basis of i instituting a control rod block which precludes the possibility of experiencing a rod withdrawal error transient since rod withdrawal is physically prevented. This time interval is adequate to allow the operator to either increase the MCPR to the appropriate value or to upgrade the status of the APRM system while in

  • condition which prevents the possibility of this
transient occurring. l l

OYSTER CREEK 3.10-5 Amendment No.: 75,1 1 l 4

7327f i

The steady-state MCPR limit was selected to provide margin to accommodate transients and uncertainties in monitoring the core ope?atin state, manuf acturing, and in the critical power correlation itself(g).

3 This limit was derived by addition of the CPR for the most limiting abnormal operational transient caused by a single operatcr error or equipment malfunc+ ion to the fuel cladding integrity MCPR limit designated in Specification 2.1.

Transients analyzed each fuel cycle will be evaluated with respect to the steady-state MCPR limit specified in this specification.

The purpose of the Kf f actor is to define operating limits at other than rated flow conditions. At less than 100% flow the required MCPR is the product of the operating limit liCPR and the Kr f actor. Specifically, the j Kr f actor provides the required thermal margin to protect against a flow ,

4 increase transient. l The Kr f actor curves shown in Figure 3.10-6 were developed generically using the flow control line corresponding to rated thermal power at rated core flow and are applicable to all BWR/2, BWR/3 and BWR/4 reactors. For the manual flow control mode, the Kf factors were calculated such that at the maximum flow state (as limited by the pump scoop tut,e set point) and the corresponding core power (along the rated flow control line), the limiting bundle's relative power was adjusted until the f1CPR was slightly above the Safety Limit. Using this relative bundle power, the f1CPR's were calculated at different points

]'

along the rated flow control line corresponding to different core flows. The ratio of the ?!CPR calculated at a given point of core flow, divided by the operating limit 'iCPR determines the value of K .f l REFERENCES (1) XN-75-55-(A), XN-75-55, Supplement 1-(A), XN-75-55. Supplement 2-(A),

Revision 2. "Exxon fluclear Company WREft-Based NJP-BWR ECCS Evaluation

!!odel and Application to the Oyster Creek plant," April 1977.

(2) XN-75-36 (NP)-( A), XN-75-35 (No) Supplement 1-( A), "Spray Cooling Heat Transfer phase Test Results EttC - 8 x 8 BWR Fuel 60 and 63 Active Rods, Interim Report," October 1975.

(3) NEDE-24195; Gov ral E1nctric Reload Fuel Application for Oyster Creek.

(4) NEDE 31462P; "0YSTER CREEK N JCLEAR GENERATING STATION SAFER /COREC00L/GESTR-LOCA LOSS-OF-COOLANT ACCIDENT ANALYSIS," August 1987, j

i I

i l

0YSTER CREEK 3.10 6 Amendment No.: 7b l

! 7327f

FIGURE 3.10-4

. ----_. . g

/

. .Q

= - // "^

9mai 5 R

~ aE 8g gsl: g g4 s l x .

s 9 -

aa g llg 1

-gl x .

S e

a$$iHHssisaiiiea

( u/n ) som ayma aoyany namxyn OYSTER CREEK 3.10-10 Amendment No.: 75, 111

9 MAXIMUN ALLOWABLE AVERAGE PLANAR 3

LINEAR HEAT GENIRATION RATE c, ( FOUR AND FIVE LOOP OPERATION )

5 22o 33 3 _

m lis -

[114-N b g_11D-v a: 108- 3 M~

h y Mi4- -

s 5 m2 -

~

L 100-l Q = R11121P 5

98-ca O 98-  %

R4-  ! I g

" az- I - P8DRn2an

- ( ' '

7 88-

\ \ \_ 'N

\

11

,s l-

,g j-i90 E4-82-

\

\

PfmRR2 ASH -

x~

/

/

/

' JN N 80  :::  ::::  ! ! ! ! ;l l : : .l  :::  ::::  : ::  : : ::  :: !l l l l H-l l3 1 5 m E E E 2 5 @ E 2 5 AVERAGE PLANAR EXPOSURE (GWD/MT )

-_ .- _ _ . _ __--_ - - - - - _ - - - - - - - -