W Northern States Power Company 1717 Wakonade Dr. E.
Welch, MN 55089 Telephone 651-388-1121 September 15,1998 10 (2 :R Part 50 Section 50.90 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 Licenso Nos. DPR-42 50-306 DPR-60 1
Supplement 15 to License Amendment Request Dated January 29,1997 Amendment of Cooling Water System Emergency intake Design Bases This letter is submitted to suppement the subject license amendment request with additional information. Attachments 1 through 28 provide information on Prairie 1
Island programs (AWis) which provide direction to all Prairie Island site personnel to
/
successfully perform a design change at the plant. As noted in the telephone call with the NRC Staff on September 14,1998, the AWis apply to all Design Changes at the Prairie Island Nuclear Generating Plant. Therefore, the scope of the AWis would include the intake canal structure. Attachments 29 and 30 provide quality assessments of the organizations which performed the intake canal analyses.
g/
Independent consuliant's reviews of the seismic analysis performed by STS Consultants were previously submitted to the NRC as Appendices R and S in Supplement 9, dated June 30,1997, to the subject license amendment.
These attachments are submitted only to assist the NRC Staff review of the subject license amendment request. NSP is not requesting ieview or approval of these
, documents by the NRC.
9909220165 9909$5 F
PDR ADOCK 05000282 P
(
.m
,t.
9/15/98 ~
n' '
Pcgs 2 of 3 NORTHERN STATES POWER COMPANY i
p
[
A revised Safety Evaluation, Significant Hazards Determination and Environmental Assessment have not been submitted since these evaluations, as presented in the
- original January 29,1997 submittal and Supplement 5 dated March 11,1997, p
. continue to bound the proposed license amendment as supplemented by this letter.
If you have any questions related to this supplement to the subject license amendment request, please contact myself or Dale Vincent at 612-388-1121.
Joel P. Sorensen Plant Manager r
Prairie Island Nuclear Generating Plant Attachments:
1.
' ACDM 1998-0015 2.
- 5AWI 6.1.0, Rev. 2, Design Change General 3.
5AWI 6.1.1, Rev. O, Design inputs 4.
' ACDM 1998-0016 15.
5AWI 6.1.2,' Rev. O, Design Outputs, Review & Verification 6.
5AWI 6.1.3, Rev. O, Design Change Package, Logs and Records 7.
5AWI 6.1.4, Rev. O, Design Change Description / Safety Assessment 8.
5AWI 6.1.5, Rev. O, Design Change implementation Plans 9.
' ACDM 1997-0018 10.
5AWI 6.1.0, Rev. O, Design Change Review and Approval
.11.
ACDM 1997-0028 12.
- 5AWI 6.1.7, Rev. O, Design Change Work Orders 13.
SAWI 6.1.9, Rev. O, Design Change Tumover for Operation 14.
5AWI 6.1.10, Rev. O, Design Change Close-out 15.
PINGP.1210, Rev. O Design Change Package Index
?16.
PINGP 1211, Rev. O, Solution Team Report
[.
17.
PINGP 1212, Rev. O, Design Change Team Members
~ 18.
. PINGP 1213, Rev. O, Design Applicability Checklist L
19.
PINGP 1214, Rev. 0, Project Description / Safety Assessment
- 20.
PINGP 1215, Rev. O, Design Change implementation Plan i
i
~
l
,e 9/15/98-i.'
.P g> 3 of_3 l NORTHERN STATES POWER COMPANY I
21.
PINGP 1216, Rev. O, Plant Specific Review & Approval Form _
22.
PINGP_1217, Rev. 0, Record Log
' 23; PINGP 1218, Rev. O, Tumover Checklist 24.
PINGP 1219, Rev. O, Closeout Checklist-
. 25.
PINGP 1268, Rev.1, Training Request 1
'26.
Engineering Manual, Section 2.1.10 cover page and pages 1,1 of 10 and 2 of -
10-27.
Maintenance Rule System Basis Document, Volume 1C-Structures Monitoring Program, Pages 2,7,10,11,12,13,14,15,16,17,20, and.21 of 22-28.
PM 3586-10, Periodic Structures Inspections, Page 9 of 12 29.
Letter dated March 18,1996 to Mr. Tony Keifer from Thomas W. Iseman 30.
Letter dated June 2.1997 to Dr. Gonzalo Castro from Thomas W. Iseman Copies Regional Administrator-lil, NRC
. NRR Project Manager, NRC Senior Resident inspector,' NRC l
c State of Minnesota Attn: Kris Sanda J E Silberg 4-i 1
i-1
-