Trip Rept of 850930-1004 Observation of INPO Accreditation Team Evaluation of Plant Training Programs,Including Licensed Reactor Operator,Nonlicensed Operator & Shift Technical Adviser.Inpo Evaluation Team Member List EnclML20147E043 |
Person / Time |
---|
Site: |
05000000, Vermont Yankee |
---|
Issue date: |
01/10/1985 |
---|
From: |
Goodman C NRC |
---|
To: |
Booher H NRC |
---|
Shared Package |
---|
ML082310270 |
List: |
---|
References |
---|
FOIA-87-787 NUDOCS 8801200463 |
Download: ML20147E043 (4) |
|
|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20196K2781999-01-0404 January 1999 Summary of 981217 Meeting with Util to Discuss Plans & Activities Re Spent Fuel Storage at Plant.List of Attendees & Handouts Encl ML20236F7861998-06-30030 June 1998 Summary of 980623 Meeting W/Vynp Re Plans & Activities Related to long-term Spent Fuel Storage Plans.List of Attendees & Copies of Handouts Distributed at Meeting Encl ML20216H5751998-04-16016 April 1998 Summary of 980407 Meeting W/Vynp Re Plans & Activities Re Assurance of Adequate Net Positive Head for Certain safety- Related Pumps.List of Meeting Attendees & Copies of Meeting Handouts Encl ML20217J9111998-03-31031 March 1998 Summary of 980324 Meeting W/Representative of Vynpc Re Torus Strainer Installation,Post Installation Torus Testing & Containment Analysis Methodology.List of Attendees & Handouts Distributed at Meeting ML20198Q5211997-11-0505 November 1997 Summary of 971103 Meeting W/Vynpc in Rockville,Md on Plans & Activities Re Submittal & Implementation of Improved TS at Plant.List of Attendees,Handout of Plant Presentation & W Beckners Comments Encl ML20211P4991997-10-0909 October 1997 Summary of 970917 Meeting W/Vynp in Rockville,Maryland Re ASME Code Case N560.List of Meeting Attendees,Meeting Agenda & Meeting Handouts Encl ML20137X1131997-04-0303 April 1997 Summary of 970326 Meeting W/Vynp in Rockville,Md to Discuss Licensee Engineering,Improved Ts,Correction Actions & Plant Goals for 1997.List of Attendees & Presentation Matls Encl ML20133M4341997-01-16016 January 1997 Summary of 961223 Meeting W/Vynp Re Licensee Request to Be Briefed on Vynp Plan for Analysis in Preparation for Vermont Yankee Fuel Cycle 20 Reload.List of Attendees & Handouts Encl ML20059L8351993-11-0909 November 1993 Summary of 931025 Meeting W/Util in Bolton,Ma Re Status of Open Licensing Issues Involving Plant.Attendees Listed in Encl 1 ML20058M1861993-09-22022 September 1993 Summary of Operating Reactors Events Meeting 93-35 on 930915 ML20036C1991993-06-0808 June 1993 Summary of 930526 Meeting W/Util in Rockville,Md Re Licensee Program to Address MOV Issues for Plant.List of Attendees & Licensee Handouts Encl ML20044H0251993-05-26026 May 1993 Summary of 930521 Meeting W/Util in Bolton,Ma Re Licensing Issues Re Plant ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20035A7641993-03-24024 March 1993 Summary of 930301 Telcon Meeting W/Util to Discuss Actions & Results Following Repeated Overloads of Plant EDGs During 1990 & Failure of Two Cylinder Liners in EDG a During May- June 1992 ML20034G4911993-03-0303 March 1993 Summary of 930223 Meeting W/Util in Rockville,Md Re Licensing Issues Related to Plant.List of Attendees Encl ML20034F1261993-02-19019 February 1993 Summary of 930127 Meeting W/Util in King of Prussia,Pa Re Status of Training Program C/A.List of Attendees & Viewgraphs Encl ML20128E7681993-02-0404 February 1993 Summary of 921216 Meeting W/Vynp in Rockville,Md Re Licensing Issues Related to Plant.List of Attendees Encl ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20011F6111990-02-28028 February 1990 Summary of Operating Reactors Events Meeting 90-05 on 900228 ML20006E7251990-02-12012 February 1990 Summary of Operating Reactors Events Meeting 90-03 on 900207.List of Attendees & Viewgraphs Encl ML20005E8421989-12-27027 December 1989 Summary of Operating Reactor Events Meeting 89-045 on 891227.List of Attendees & Significant Elements Discussed Encl ML20005D8121989-12-18018 December 1989 Summary of Operating Reactors Events Meeting 89-044 on 891213.List of Attendees & Viewgraphs Encl ML19332G0601989-12-0707 December 1989 Summary of Operating Reactors Events Meeting 89-43 on 891206.On 891128,high Cycle Fatigue Failure of Master Connecting Rod Assembly Occurred at South Texas,Unit 2.RHR Leakage Noted on 891201 at Braidwood,Unit 1 ML20005D6871989-12-0101 December 1989 Summary of Operating Reactors Events Meeting 89-042 on 891129.List of Attendees & Viewgraphs Encl ML19332D2821989-11-16016 November 1989 Summary of Operating Reactors Events Meeting 89-040 on 891115 ML19327C0541989-11-0202 November 1989 Summary of 891019 Meeting W/Sys Energy Resources,Inc, Louisiana Power & Light & Arkansas Power & Light Re Antitrust Concerns W/Consolidation of Operations Under Entergy Operations,Inc.List of Attendees & Viewgraphs Encl ML19325E8981989-11-0101 November 1989 Summary of Operating Reactors Events Meeting 89-38 on 891101 to Brief Senior Managers from Nrr,Aeod,Res,Region Ofc & Commission on Selected Events That Occurred Since 891018 Meeting.List of Attendees Encl ML19325E1761989-10-24024 October 1989 Summary of Operating Reactors Events Meeting 89-37 on 891018.List of Attendees & Events Briefing Encl ML19325D9211989-10-19019 October 1989 Summary of 891012 Meeting W/Sys Energy Resources,Inc, Arkansas Power & Light,Inc & Louisiana Power & Light,Inc at NRC Headquarters to Discuss Consolidation of Operations Under Entergy Operations,Inc.List of Attendees Encl ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML18153B7971989-07-0606 July 1989 Summary of 890612 Meeting W/Util in Rockville,Md Re Plant Configuration Mgt Program.Informs That Goal of Program Is to Confirm That as-built Plants in Conformance W/Licensing Design Basis as Described in FSAR ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 1999-01-04
[Table view] Category:TRIP REPORTS
MONTHYEARML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20154L1661988-05-10010 May 1988 Trip Rept of 880412-15 Mgt Team Visit to Plant Sites,Two Matls Licensees & Region I Ofcs.List of Team Members & Summary of Observations & Perceptions from Visit Encl.Info Deleted ML20196F9951988-02-24024 February 1988 Partially Withheld Trip Rept of 880209-11 Mgt Team Visit to Region V & San Onofre & Trojan Sites Re Integrated Assessment of Mgt Effectiveness Associated W/Regionalized NRR & NMSS Programs ML20151W0041987-03-12012 March 1987 Submits After Trip Rept ML20147E8911986-08-20020 August 1986 Trip Rept of 860721-25 Visit to Plant to Observe INPO Accreditation Team Evaluation of Six Training Programs, Including Instrumentation & Control Technician,Mechanical Maint & Electrical Maint.List of Team Members Encl ML20213F8661986-07-31031 July 1986 Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl IA-86-778, Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl1986-07-31031 July 1986 Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl ML20206J6561986-06-23023 June 1986 Trip Rept of 860612 Training Session in Lacey,Wa Re Federal Radiological Emergency Response Plans & Meeting W/Utils & State of Wa Concerning Potential Emergency Preparedness Issues.Attendees Listed & Training Agenda Encl ML20244D8391986-05-0707 May 1986 Trip Rept of 860415 Site Visit Re Demonstration for Ultrasonic Exam Procedure of Statically Cast Stainless Steel Primary Loop Welds.Issue of Preservice Ultrasonic Exam of Welds Resolved.Trip Repts by Inel & Bnwl Encl ML20244D8401986-04-22022 April 1986 Trip Rept of 860415 Site Visit Re Demonstration of Ultrasonic Exams Performed on Cast Stainless Steel Primary Piping Welds.Exam Procedure Appears to Meet or Exceed ASME Code Requirements.Written Procedure Not Available ML20154L9181986-03-0606 March 1986 Trip Rept of 851021-24 Site Visits Re Wrong Unit/Wrong Train Events to Determine Whether Simple,Low Cost Improvements Can Be Identified & Implemented ML20237C9681986-02-19019 February 1986 Trip Rept of Attendance at State of Il 860213 Meeting Re Training Session on NRC Incident Response Program & NRC Participation in 860408 Plant Emergency Exercise.List of Attendees & Partial Agenda Encl ML20137D4761986-01-10010 January 1986 Trip Rept of Observation of INPO Accreditation Team Visit During Wk of 850930-1004 of Util Power Plant Training Programs.List of INPO Evaluation Team Members Encl ML20141H8551986-01-10010 January 1986 Trip Rept of 851112-15 Site Visits Re Wrong Unit/Wrong Train Events.Visit Conducted as Part of short-term Effort to Determine If Low Cost Improvements Can Be Identified & Implemented to Reduce Frequency of Events ML20138A1201985-09-23023 September 1985 Trip Rept of 850617-20 Site Visits Re Reduction of Wrong Unit/Wrong Train Events at Facilities ML20147E2301985-06-0303 June 1985 Trip Rept of 850420-22 Visit to Port Gibson,Ms,To Participate in Field Test of Draft Training Review Criteria & Procedures at Plant.Nrc Teams Observed Licensed Operator & Nonlicensed Operator Training ML20133B8781985-03-15015 March 1985 Trip Rept of 850315 Site Visit Re Presentation of Licenses to Senior Reactor Operators & Reactor Operators.Subjs Discussed During Visit Stated ML20133B8521985-02-26026 February 1985 Trip Rept of 850207-08 Site Visit Re Status of Licensee Performance Enhancement Program & Status of Action Plan Being Used to Improve Overall Training Effort ML20136F6871985-02-0505 February 1985 Trip Rept of 841203-07 Visit to Bechtel in Norwalk,Ca Re Structural Engineering Design Audit Based on Util 841031 Submittal of Design Rept.List of Attendees,Agenda & Addl Info Required for Satisfactory Question Response Encl ML20199G3181985-01-15015 January 1985 Trip Rept of 841114-16 Site Visit Re Meetings W/Qa/Qc Inspectors to Emphasize That All Safety Issues Must Be Resolved Before Units Can Be Licensed ML20147E0431985-01-10010 January 1985 Trip Rept of 850930-1004 Observation of INPO Accreditation Team Evaluation of Plant Training Programs,Including Licensed Reactor Operator,Nonlicensed Operator & Shift Technical Adviser.Inpo Evaluation Team Member List Encl ML20237D0071985-01-10010 January 1985 Trip Rept of 871112-15 Visit to Sites to Determine Whether Simple,Low Cost Improvements Can Be Identified & Implemented to Reduce Frequency of Wrong Unit/Wrong Train Events ML20209D3321984-09-21021 September 1984 Trip Rept of 840816-22 Visits to Lasl & Plant Re DHR & Unresolved Safety Issue A-45 ML20136F1681984-08-31031 August 1984 Trip Rept of 840621-22 Site Visits to Examine Clastic Dikes of Coastal Plain ML20136F1281984-08-0707 August 1984 Trip Rept of 840724 Site Visit Re Radiation Protection Facilities.Attendee List Encl ML20133B9461984-07-0505 July 1984 Trip Rept of 840703 Site Visit Re Training Organization & Programs.Program Not Implemented Due to Lack of Senior Mgt Support ML20127B5101984-04-13013 April 1984 Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed IA-85-160, Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed1984-04-13013 April 1984 Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed ML20149B6101984-03-28028 March 1984 Trip Rept of 840323 Visit to INPO to Respond to INPO Concerns Re Training & Qualifications Rulemaking Package (SECY-84-76).Accreditation Team Rept on McGuire Station Read & Questions Answered ML20115A0941984-02-0909 February 1984 Trip Rept of 830124-25 Site Visit Re Control Room Habitability.Hvac Sys Generic General Concerns & Overall Perspective Addressed ML20138M9741983-12-20020 December 1983 Trip Rept of 831129-30 Site Visit Statistical Analysis of Backfit Insp Program ML20132B6931983-11-21021 November 1983 Trip Rept of 831104-05 Site Visit & Meeting to Formulate Final Objectives,Guidance & Schedule for Initial full-scale Exercise ML20080D2631983-10-31031 October 1983 Draft Trip Rept of Caseload Forecast Panel 830222-24 Site Visits Re Const Progress Review & Estimating Resource Needs for Licensing Activities ML20080D2771983-10-31031 October 1983 Trip Rept of 830622-24 Caseload Forecast Panel Site Visit Re Plant Status Review.Projected Fuel Load Date Comparisons Listed ML20209C3391983-08-0808 August 1983 Trip Rept of Attendance at 830727 Meeting in San Francisco, CA Between Idvp & Util Re Status of Closure Efforts on Open Items in Idvp Final Rept.Projected Date for Issuance of Idvp Final Rept Suppl Is mid-Sept 1983 ML20080D2971983-07-27027 July 1983 Summary of 830622-24 Caseload Forecast Panel Site Visit Re Plant Status Review ML20151H8231983-07-26026 July 1983 Trip Rept of 830712 & 15 Site Visit Re Fire Protection Site Audit.List of Agreements & Concerns Discussed Encl ML20209C3101983-07-25025 July 1983 Trip Rept of 830607 Visit to San Francisco,Ca to Observe Test Program Developed by Util & Bechtel.Program Was to Determine Statistically Spot Weld Capacity of Superstrut Matl Installed at Plant ML20209C2311983-06-30030 June 1983 Trip Rept of Attendance at 830512 Technical Interchange Meeting W/Util & Independent Verification Program Staff Re Containment & Turbine Bldgs & Control Room.Attendee List Encl ML20209C1171983-04-29029 April 1983 Trip Rept of 830425 Visit to Bechtel in Gaithersburg,Md to Review Grand Gulf Cable Tray Support Calculations for Use in Resolution of Allegation Concerning Superstrut Spot Welds at Diablo Canyon ML20080D2551983-03-18018 March 1983 Marked-up Draft Summary of Trip Rept of Caseload Forecast Panel 830222-24 Meetings Re Const Progress Review & Mgt Decision on Allocation of Staff Resources During Licensing Review ML20205T5371983-02-15015 February 1983 Trip Rept of 830126 Meeting in Bethesda to Discuss Question of Corrective Actions to Be Required of Util Re Finding of Uncertified QC Inspectors at Site ML20209B9941983-02-14014 February 1983 Trip Rept of 830126 Meeting W/Rl Cloud & Assoc in Berkeley, CA to Clarify Items Re Interim Technical Rept (Itr) 12, Independent Design Verification Program (Idvp) - Piping & Itr 17, Idvp - Piping,Addl Samples ML20209B8411983-01-10010 January 1983 Trip Rept of 821202 Meeting W/Teledyne Engineering Svcs, Bechtel,Bnwl,Norton,Burke,Berry & French,Util,State of CA, Hhb & Urs/Blume to Discuss Listed Portions of Independent Design Verification Program ML20070V1351982-12-20020 December 1982 Trip Rept of 820913-17 Visit to Facility to Review Seismic & Dynamic Qualification Methods,Procedures & Results for safety-related Mechanical & Electrical Equipment & Observe Field Installation of Equipment ML20209B7941982-11-30030 November 1982 Trip Rept for 821112 Info Exchange Meeting Between Teledyne Engineering Svcs & Util in Waltham,Ma to Review Corrective Action Plans for Annulus Structure ML20209B7801982-10-28028 October 1982 Trip Rept of 820920-23 Visit to Site & Escondido,Ca Re NRC & Us Coastal Engineering Research Hydrologic Engineering Review Comments on Breakwater/Intake Structure Repts for Jul 1982 ML20134B4611982-09-16016 September 1982 Trip Rept of 820830-31 Visit to Bechtel,Norwalk,Ca to Observe Region IV Insp Concerning Effectiveness of Util/ Bechtel Processing of Field Change Notices for Facility Const.Supporting Documentation Encl ML20083L8031982-09-0202 September 1982 Trip Rept of 820813 Site Visit Re Replacement of Recirculation Sys Piping ML20069D1861982-08-30030 August 1982 Trip Rept of 820915-18 Seismic Qualification Review Team Site Visit Re Performance of Plant Site Review for Selected safety-related,mechanical & Electrical Equipment.Revision to Site Visit Rept Encl.W/O Encl 1989-08-24
[Table view] |
See also: IR 05000930/2010004
Text
.-
.v .:.:- ww:OL%M.w v. ~.u.~.- . -. -- -
.-..
- -.
.
- -e.-.
~ -
C .z + 3
7
d
1
C DISTRIBUTION:
f-
j ' *
Central Files
j
Y
MTB R/F
CGoodman
I_/
JPersensky
i
ABlumer
j
JAN 101985
JBuzy.
1
JKoontz
!
DMorisseau
l
MEMORANDUM FOR: Harold R. Pooher, Chief
MRO'
i
Maintenance and Training Branch
PDR
-
j
Division of Human Factors Technology
i
THRU:
J. J. Persensky, Section Leader
1
Personnel Training Section
i
Maintenanca and Training Branch
Division of Human Factors Technology
'
!
i l
FROM:
Clare Goodman
Facilities Operations Branch
.
-
Division of Boiling Water Reactor Licensing
4
.
1
SUBJECT:
OBSERVATION OF INPO ACCREDITATION TEM VISIT AT YERMONT
-
'
YANKEE NUCLEAA POWER PLANT
.
Introc'uction
During the week of September 30 - October 4,1985, I observed the INPO
'
Accreditation Team evaluation of the follcwing Yermont Yankee Nuclear Power
{
Plant training programs:
4
I
Lice.1 sed R0 and SRO Training Procraa
Nonlicersed Operator Training Program
,
STA(SE)TrainingProgram
l--
This evaluation was conducted according to INP0 85-002 "Criteria for the
Accreditation of Training in the Nuclear Power Industry " dated January 1985.
-A listing of the INPO Evaluation Team Members is enclosed with this report.
Phil McCullough served as the overall Team Manager. The INP0 Evaluation Team
Members w're divided into two teams to address Process and Content, each with
a separata Team Leader.
'
The Accreditation Process
!
On Monday morning, a training session was conducted by the Team Manager and
the Team Leaders for the peer evaluators from INP0 member utilities.
-
1
Otherwise, the accreditation process was essentially the same as in prior team
(
visits as obEerved by NRC staff members (see memorandum dated August 7, 1985,
from Morisseau to Booher).
'
8801200463 880112
Observations
PDR
FOIA
DOLEYB7-787
PDR
FC# - 6>7 - 7f7
-
I used the Accreditation Team Observation Protocol during this INP0 Team
visit. The answer to all the questions on the checklist was "yes."
Some
f4
,
itms from the Observation Protocol were enmoleted in considerable det'il
,
while*othe r items were :,n l... y briefly addressed by the INPO team.
l
omc: >
. . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . .
.. . . . - - . - . .
. . . .
. - ~
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . .
= = =t>
. . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . ~ . . .
- ~ . - ~ . . . - ~ .
047t )
on.m.n...........
. . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . ,
. . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . .
n .n .aaa aooa
mm".
a aaa" a
,
6WJMLGEUV WJ3JKCW61CW6M46EM/
me o-moa
,
,
. _ .
_
_
w
- . , s.. u- .m.._ _ .; ..-_.24
ua
..c_ a_ e. m... . .
..
. ,.
_,t
.
. . ,
. , , , , ,
...,
.
.
~
i.i.
-
=] .
,
I~
- /
'I
J
Enclosure 1
t
)
INP0 EVALUATION TEAM MEMBERS
.
4
i
Team Manager
1,
"
4
Phil McCullough
!
i
4
l1.
Team Leader Process: Larry Durham
Team Leader Content: Jerry Olson
'
,
i
I
'
-
Team Assignments for Evaluatiot
_
Objectives for
'
.
',
Orjanization & StA ff
Evaluation
,
RichStickney(WNP)
1, 3
ChipFenton(GPU)
1,' 2
'
NLO Program
(
SamNewton(INPO)
3, 4-10 Content Criteria
l
(
'
John Price (Callaway)
4-10 Process Criteria
l
i
l : . ..
RO/SRO Program
'
-
JohnWyrick(WNP)
3, 4-10 Content Criteria
l
BillNevins(INPO)
3, 4-10 Content Criteria
'
.
.
STA Program
Ken Norris (Comonwealth Edison)
3, 4-10 Content criterie
,
Bill Nevins (INPO)
4-10 Process Criteria
t
.
'
'
Evaluation
-
,
l
Steve Volmer (Rancho Seco)
1-12
,-
(
.
-
w-
y
---
e
+rw
e
-
-
-
-
-
- - - -
.__
p g .< s..w .,._..~.m
._ _.a. m .-
- am.m.
. .._. c
. . . .
._ - -..
...
.
~ .
. . . .. ,
1
-
i
.
-
-
- l
l .-
Harold R. Booher
-2-
JAN 101985
,
1
4
.
i
.
l
I attended numerous meetings and interviews during my 5 day observation,
'
i
Monday afternoon. I attended a general introduction and overview of the INPO
Accreditation Team Visit process with the Plant Manager. Tuesday through
Friday, I attended morning briefings between INP0 and utility staff. These
'
meetings reviewed the INP0 concerns resulting from their findings of the
previous day.
I also observed as many interviews with both training and
..
operations personnel as I could. At the end of each day, I attended either
3
!
the Content or the Process daily evaluation wrap-up meeting, and then I
d
attended the final wrap-up meeting conducted by the overall Team Manager. At
the final wrap-up meeting, presentations were made by both the Process and
Content Team Leaders, but all Team Members were present and could add their
j
-
The Team Manager summarized the findings from the week long visit and
viewpoints. On Friday, I attended the exit briefing for the utility staff.
a
-
discussed future steps toward Accreditation. The Team Leaders then presented
-
a sunrnary of their group's findings. The Team Manager then stated that a
<
.
formal exit meeting with the Vermont Yankee findings would be held in 3 or 4 ,
weeks.
,
.
.
Results
.
The following were some of the Vermont Yankee concerns expressed by INPO
about the Vermont Yankee trsining program:
,
'
r
l
An overall training program description needs to be prepared for
Vermont Yankee.
i
e
l
'
The program description should be jointly endorsed by operations and
,
training,
t
.
..
l
Learning objectives need to be written for the nonlicensed operator
program.
.
The continuing training program for nonlicensed operators needs to be
l
documented.
I
'
!
A formal OJT program for operators needs to be developed.
1
Tasks from the JTA for SCR0s only need to be identified in the
instructor guides and the instructor guides should be based on these
tasks.
Job descriptions of operations personnel need to be updated to
include training tasks (i.e., Shif t Supervisors).
l
Qualification Standards for Operators are necessary.
-
-
"
Short Term Instructors need to be evaluated formally.
,
. . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . .
. . . . . . . ~ . . . . . . . . . .
. . . ~ . . . . . ~ . . . . . - -
~~~~-~~~
~ ~ ~ ~ - - ~ ~ .
~~ - ~~~~~~~
omes >
. . . . . . . . . . . . . .
.~
-
. . . . _ . . . . . .
. . . . . . ~ . . . . - ~ ~
~.-~~~~~~
~~~~~~ ~~~
-~~"""""~~~~
owmue p
. . . . . . . . . . . .
. . . . ~ . . . . .
_ .
. . . . . . . . . . . - . . . . . . . . .
. . . - . ~ . . - ~ ~ ~ .
- ~ ~ ~ . - - -
~ ~ ~ ~ - ~ ~ ~
" ~ ~ ~ ~ ~ ~ ~ " ~
.nep
OFFICIAL RECORD COPY
usmai-u6*
unc ronu m om new ano
}-.. - w,.,a.1a a a.;- ~:.---.a. a ~:. a e
..
..:....
,
, . - . .
,
.
1
-
.p.
.
s
r..
r.
> -
.-
,
i.
q
,
..
i,
JAN 101985
i
Harold R. Bocher
-3-
!.
-
,
The continuing training program for the Shift Engineer needs to be
formalized and documented.
.
.
A Qualification Standard for the Shift Engineer is necessary.
!
A consnitment that all future training candidates will participate in
"
an accredited training program is necessary.
!
Conclusions
Vermont Yankee
i
-
i
The INPO Evaluation Team Members did a thorough job of reviewing
,,
Vermont Yankee against the criteria for Accreditation.
'
,
The process appeared to be highly professional and labor intensive.
-
,
I noted a healthy emphasis on continuing training.
Yermont Yankee has an excellent plant-specific JTA.
General
<
-
l
It appears that while Vermont Yankee and the industry have made large
l
strides in training, the Accreditation process is moving too fast. A
slower pace may be more beneficial to all parties concerned.
'
l
l
-~
beneficial, but that more than two visits for one individual is
I found that observing one INPO Accreditation Team visit was
probably unnecessary.
-
Original Signed by
Clare Goodman
Facilities Operations Branch
-
Division of Boiling Water Reactor Licensing
Enclosure:
-
As stated
,
,
, .-
l
DW/CG6/VY ACCREDITATION
l
s
PT!/[
FOB /
-L
o,,,c , ,
. - - > Cg,o ,_, (b,r , ,,gg!m3n,s,k,y
,,,,,
, , , , ,
,,,
, , , , , ,
, , , , , , , , , , , , , , , , , , , , , , , ,
, , , , , , , , , , , , , , , , , , , , , , , ,
, , , , , , , , , , , , , , , , , , , , , , , ,
,.1L{ .La s.,,,,,,,,,Mn,zas
un,
!
-
@FJMK4VM R ECO R D CO PY
u n m ui- m m