| | | Reporting criterion |
|---|
| 05000362/LER-1996-001, :on 960304,voltage Signal Actuation Loss Due to Inadvertent Relay Trip.Enhanced Turbine Startup Sequence by Slowing (from 2.5 Seconds to 8 Seconds) Operation of Trip/ Throttle Valve |
- on 960304,voltage Signal Actuation Loss Due to Inadvertent Relay Trip.Enhanced Turbine Startup Sequence by Slowing (from 2.5 Seconds to 8 Seconds) Operation of Trip/ Throttle Valve
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(1) |
| 05000361/LER-1996-001-02, :on 960205,waste Gas Sys H Monitor Was Declared Inoperable.Caused by Blown Fuse.Replaced Blown Fused & Performed Channel Calibr |
- on 960205,waste Gas Sys H Monitor Was Declared Inoperable.Caused by Blown Fuse.Replaced Blown Fused & Performed Channel Calibr
| |
| 05000362/LER-1996-001-01, Forwards Supplemental LER 96-001-01,providing Addl Info on Safety Significance of Occurrence Involving Inadvertent ESFs Actuation | Forwards Supplemental LER 96-001-01,providing Addl Info on Safety Significance of Occurrence Involving Inadvertent ESFs Actuation | |
| 05000361/LER-1996-002, :on 960209,potential Decalibration of Logarithmic Power Level Instrumentation Discovered.Caused by Calibr Error.Reanalysis Underway Considering All Factors Effecting Calibr |
- on 960209,potential Decalibration of Logarithmic Power Level Instrumentation Discovered.Caused by Calibr Error.Reanalysis Underway Considering All Factors Effecting Calibr
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) |
| 05000362/LER-1996-002-02, :on 960514,pressurizer Safety Valves Found to Be Above Tech Spec Setpoint.Caused by Setpoint Drift.Valves Disassembled,Inspected,Reassembled & Reset to Proper Setpoint |
- on 960514,pressurizer Safety Valves Found to Be Above Tech Spec Setpoint.Caused by Setpoint Drift.Valves Disassembled,Inspected,Reassembled & Reset to Proper Setpoint
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(1) 10 CFR 50.73(c)(2)(viii)(A) |
| 05000361/LER-1996-003, :on 960212,identified Computer Data Error. Caused by Inattention to Detail.C/A:Colss Computer Restarted W/Correct Date |
- on 960212,identified Computer Data Error. Caused by Inattention to Detail.C/A:Colss Computer Restarted W/Correct Date
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(1) |
| 05000362/LER-1996-003-02, :on 960803,delinquent I Sample Analysis Noted Following 15% Power Change in 1 H Period.Caused by Lack of Direct CR Indication to Confirm Compliance W/Ts Requirement. RCS Sample I Analysis Completed |
- on 960803,delinquent I Sample Analysis Noted Following 15% Power Change in 1 H Period.Caused by Lack of Direct CR Indication to Confirm Compliance W/Ts Requirement. RCS Sample I Analysis Completed
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(1) |
| 05000362/LER-1996-004-01, :on 960919,RCS Pressure Boundary Leakage Occurred.Caused by Thermowell Broken Off Inside RCS Pipe. Util Restored Broken Thermowell for Design Configuration |
- on 960919,RCS Pressure Boundary Leakage Occurred.Caused by Thermowell Broken Off Inside RCS Pipe. Util Restored Broken Thermowell for Design Configuration
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(1) |
| 05000361/LER-1996-004, :on 960411,AF Sys Turbine Drive Pump Relatch Occurred.Caused by EFAS Signal Present.Appropriate Procedures Revised |
- on 960411,AF Sys Turbine Drive Pump Relatch Occurred.Caused by EFAS Signal Present.Appropriate Procedures Revised
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(e)(2) |
| 05000361/LER-1996-005-01, Forwards Revised LER 96-005-01 Which Discusses Occurrence Involving Environmental Qualification of Containment High Range Radiation Monitors | Forwards Revised LER 96-005-01 Which Discusses Occurrence Involving Environmental Qualification of Containment High Range Radiation Monitors | |
| 05000362/LER-1996-005-01, :on 960928,reactor Head Vent Valve Discovered Mispostioned.Caused by Incorrect Completion of RCS post-fill Valve Alignment Procedure.Util Confirmed Review of Records That Head Vent Valve Closed |
- on 960928,reactor Head Vent Valve Discovered Mispostioned.Caused by Incorrect Completion of RCS post-fill Valve Alignment Procedure.Util Confirmed Review of Records That Head Vent Valve Closed
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(x) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(1) |
| 05000361/LER-1996-006, :on 960826,NRC Inspector Observed Local Voltage Meter for Vital Bus Inverter Y003 Indicating 122.5 Volt Ac. Caused by Util Not Providing Quantitative Operability Info. Occurrence Will Be Reviewed |
- on 960826,NRC Inspector Observed Local Voltage Meter for Vital Bus Inverter Y003 Indicating 122.5 Volt Ac. Caused by Util Not Providing Quantitative Operability Info. Occurrence Will Be Reviewed
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(1) |
| 05000362/LER-1996-006-01, :on 961025,CPIS Actuated W/Unit 3 in Mode 1 at Full Power.Caused by Radiation Increase Inside Due to Small Pressurizer Vapor Space Leak.Tsip Revising Cpis Actuation Setpoint Installed on 961101 |
- on 961025,CPIS Actuated W/Unit 3 in Mode 1 at Full Power.Caused by Radiation Increase Inside Due to Small Pressurizer Vapor Space Leak.Tsip Revising Cpis Actuation Setpoint Installed on 961101
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(1) |
| 05000361/LER-1996-008, :on 960926,RCP Lube Oil Collection Sys Sightglass & Mounting Extended Slightly Beyond Lateral Limits of Oil Collection Sys Drain Pan,Resulting in Leaking Oil Outside Sys.Cause Under Investigation |
- on 960926,RCP Lube Oil Collection Sys Sightglass & Mounting Extended Slightly Beyond Lateral Limits of Oil Collection Sys Drain Pan,Resulting in Leaking Oil Outside Sys.Cause Under Investigation
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(1) |
| 05000361/LER-1996-009, :on 961216,surveillance Testing of EDG non-critical Trip Bypasses Occurred.Caused by Inadequate Nov 1983 Test Procedure.Procedure Will Be Revised |
- on 961216,surveillance Testing of EDG non-critical Trip Bypasses Occurred.Caused by Inadequate Nov 1983 Test Procedure.Procedure Will Be Revised
| 10 CFR 50.73(a)(2)(i) |
| 05000361/LER-1996-010, :on 961210,containment Escape Hatch Not Closed While Performing Core Alterations.Caused by Failure to Recognize That Opening Emergency Escape Hatch Doors Would Cause Pevs to Be Open.Event Reviewed W/Staff |
- on 961210,containment Escape Hatch Not Closed While Performing Core Alterations.Caused by Failure to Recognize That Opening Emergency Escape Hatch Doors Would Cause Pevs to Be Open.Event Reviewed W/Staff
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(1) |
| 05000361/LER-1996-011, :on 961216,air Operated Containment Isolation Valve Declared Inoperable.Caused by Two Separate Errors Could Have Caused Valve 2HVO513 to Have Insufficient Closing Force.Edison Will Reset & Retest Valve 2HV0513 |
- on 961216,air Operated Containment Isolation Valve Declared Inoperable.Caused by Two Separate Errors Could Have Caused Valve 2HVO513 to Have Insufficient Closing Force.Edison Will Reset & Retest Valve 2HV0513
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(1) |
| 05000361/LER-1996-012, :on 960229,discovered That CST Was Outside Design Basis.Cause Under Investigation.Compensatory Measures Were Put in Place to Administratively Increase Tanks Water Volume & to Procedularize Operator Actions |
- on 960229,discovered That CST Was Outside Design Basis.Cause Under Investigation.Compensatory Measures Were Put in Place to Administratively Increase Tanks Water Volume & to Procedularize Operator Actions
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) 10 CFR 50.73(a)(2)(1) |