Text
I
.
.
U. S. NUCLEAR REGULATORY COMMISSION
REGION III
Report Nos. 50-461/85043(DRSS); 70-2947/85001(DRSS)
Docket Nos. 50-461 and 70-2947 Licenses No. CPPR-137 and SNM 1886 Licensee:
Illinois Power Company 500 South 27th Street Decatur, IL 62525 Inspection At:
Clinton, IL Inspection Conducted:
August 26-29 and September 3-6, 1985 onsite September 10, 1985 at the Region III Office Type of Inspection:
Announced, Preoperational Physical Protection and SNM Control and Accountability Date of Previous Physical Protection Inspection:
June 6-14, 1985
/O!/ 8
. Inspectors:
6. L. Pirtle Date ysical Security Inspector h
l0 l 85 M. Christoffer Date ysical Security Inspector Nblth l0N8f ypDrouin Date Physical Security Inspector Approved By:
b[
/0 [8f
. R. Creed, Chief Date afeguards Section Inspection Summary Inspection on August 26 through September 10, 1985 (Report No. 50-461/85043(DRSS); 70-2947/85001(DRSS))
Areas Inspected:
Included a review of the licensee's actions and progress for implementation of the security program.
Specifically, the following areas were reviewed:
Security Plan and Implementing Procedures; Management Effectiveness-Security Program; Security Program Audit; Security Organization; Locks, Keys, and Combinations; Access Control - Personnel; Access Control - Vehicles; Access Control - Packages; Security Protection of SNM of Low Strategic Significance; Enclosure c e fns 0510080432 851002 SAFEGUARDS IN N N PDR ADOCK 05000461 Upon saparation this G
PDR j Rcetro M *ad L
_
.
_ _ _.
_ _.. _ _ _ _ _ _ _ _ _ _ _ -. _
s
.
J SNM Control and Accountability; Security Force Training and Qualification Plan; and Licensee's Actions on Previous Inspection Findings.
The inspection involved 103 inspector-hours by three NRC inspectors. The onsite inspection
,
!
began during the day shift.
'
Results: The licensee's progress for implementation of the security program appeared adequate, except for the Personnel Screening Program.
Failure to complete this program could have an adverse impact on a safeguards recommend-ation for license issuance.
This program continues to warrant senior management support and oversight.
Physical security protection and control and accountability of Special Nuclear Material appeared adequate.
The security force requires re evaluation and recertification in accordance with criteria
,
'
in the Security Force Training and Qualification Plan.
Total implementation of the security plan is currently scheduled for mid-November 1985.
Security project completion remains demanding but achievable if sufficient resources are devoted to the implementation effort.
!
(Details:
UNCLASSIFIED )
'
,
Enclosure contains SAFErmuAR05 INFORMATION then separation this page in Decontrolled 2