Forwards Preoperational Physical Protection & SNM Control & Accountability Insp Repts 50-461/85-43 & 70-2947/85-01, Respectively,On 850826-0910.No Violation Noted
ML20139A297
Person / Time
Site: Clinton, 07002947  Constellation icon.png
Issue date: 10/02/1985
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20139A302 List:
References
NUDOCS 8510080425
Download: ML20139A297 (2)


See also: IR 05000461/1985043

Text

a ,

Dii g

on Jb \ h kV b

!

OCT 0 21985

Docket No. 50-461

Docket No. 70-2947

Illinois Power Compny

ATTN: Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This refers to the announced preoperational physical protection inspection

and SNM control and accountability inspection conducted by Messrs. G. Pirtle,

B. Drouin, and Ms. G. Christoffer of this office on August 26 through

September 10, 1985, of activities at Clint,n Power Station authorized by NRC

Construction Permit No. CPPR-137 and SNM License No. 1886, and to the discussion

of our findings with Mr. D. P. Hall and other members of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

exanination of procedures and representative records, observations, and

interviews with personnel.

No violations with NRC requirements were identified during the course of this

inspection. The enclosed report does contain certain findings which must be

corrected and/or resolved prior to fuel load. These findings will be reviewed

during future preoperational inspections. No written response is required

at this time.

This inspection concluded that senior management oversight of the Personnel

Screening Program continues to be warranted. Additionally, a concern

pertaining to the proposed schedule for complete implementation of the security

program has developed during this inspection. Our concerns are addressed in

Paragraph 5 of the report details.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Section 73.21(c)(2) of the NRC's " Rules of Prac-

tice," Part 73, Title 10, Code of Federal Regulations. This information must

be handled and protected in accordance with the provisions of 10 CFR 73.21.

Consequently, our report of this inspection will not be placed in the Public

Document Room. g

$0

Enclosure contains ,j

SAFEGUARDS lhf0RMATION yt

Os100h25

PDB

c6 0 0$002o0461

PDR Upon separation this

page is Decontrolled

9

f;g @-

O W

q -- n , , a m o I M r n ro n A T' lVA lNh

vh f L.O U h! \ ,J V 4 6 4 6 V i u t in I

, ,

^ ' T T.^ a

nno i rnma r n

vi'll L'O Jhuvo a sv m ni U\

Illinois Power Company 2

>

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

i

et

. A. Hind, Director

Division of Radiation Safety

and Safeguards

_

Enclosure: Inspection Report

No. 50-461/85043(DRSS);

No. 70-2947/85001(DRSS)

(UNCLASSIFIED SAFEGUARDS DISTRIBUTION) s

cc w/ enclosure:

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/DL/SSPB

ACRS

IE/DI/SMPB

NMSS FILE

NMSS/SG

cc w/ enclosures, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Gary Wright, Manager

Nuclear Facility Safety -

Richard Hubbard

Jean Foy, Prairie Alliance

Allen Samelson, Assistant

Attorney General,

Environmental Control Division

H. S. Taylor, Quality Assurance

0I*ISI "

Ecclev:ro Con ?., ins

fl er.;U.:= IPFCOnTIO;! 4

U; 0 i E.:;,c ro tica Tals

I'a ; is Jec.itrullod

RIII RIII RIII RIII RIII IT RIII

i ble/jp Q'h in

%

q/eed

RndGs

Jablonski

\- %d

fhrJstoffer 1, n Hjnd

'

28/85 ) :c/'/yr gjn .

m,m munnv0 nwuman.-'g

-

g o, , , no .,,-

nu <

u J