MONTHYEARML20132F0231985-07-19019 July 1985 Forwards Safety Evaluation Re Environ Qualification of Electric Equipment Important to Safety & Authorizes Interim Operation in dry-out Mode at Max 15% of Rated Power,Based on Listed Conditions,Until Technical Review Completed Project stage: Approval ML20132E6081985-07-19019 July 1985 Supplemental Safety Evaluation Supporting Licensee CRD Mechanisms & Associated Position Instrumentation,Per 850712 Safety Evaluation & Licensee 850710 & 18 Submittals.Control Rod Program Acceptable for Plant Restart Project stage: Request ML20132F0721985-07-19019 July 1985 Safety Evaluation Documenting Deficiencies in Licensee Program for Environ Qualification of Electric Equipment Important to Safety.Licensee Response to Generic Ltr 84-24 Inadequate.However,Operation at 15% Power Authorized Project stage: Approval ML20134M0161985-08-20020 August 1985 Submits Discussion of Technical Issues Re Environ Qualification Program Raised During Meetings W/Nrc.Aging & Operability Time Program Operator Response Time,Temp Profiles & Shutdown Cooling Paths & Equipment Evaluated Project stage: Meeting IR 05000267/19850211985-08-30030 August 1985 Insp Rept 50-267/85-21 on 850721-31.No Violation or Deviation Noted.Major Areas Inspected:Operational Safety Verification Project stage: Request ML20137X1411985-09-30030 September 1985 Safety Evaluation Supporting Util 850830,0910,11 & 23 Requests for Authorization to Operate at Max 8% Power,For Up to 45 Days,To Remove Moisture from RCS Project stage: Approval ML20137X1241985-09-30030 September 1985 Forwards Safety Evaluation Based on Util 850830,0910,11 & 23 Requests for Authorization to Operate at Max 8% Power,For Up to 45 Days,To Remove Moisture from Rcs.Authorization Granted,Subj to Listed Commitments Project stage: Approval ML20138E3921985-10-11011 October 1985 Forwards Request for Addl Info on 850924 Request for Special Consideration & Schedule Extension to Equipment Qualification rule,10CFR50.49.Info Requested within 7 Days of Ltr Receipt Project stage: RAI ML20138C8111985-10-21021 October 1985 Forwards Response to 851011 Request for Addl Info Re 850924 Request for Schedule Extension for Environ Qualification Program Under 10CFR50.49 from 851130 to 860331 Project stage: Request ML20138R7331985-10-31031 October 1985 Summary of 851029 Meeting W/Util & ORNL Re Schedule Extension to Equipment Qualification Rule.List of Attendees, Agenda & Matls Presented by Util Encl Project stage: Meeting ML20209J0821985-11-0505 November 1985 Forwards Request for Addl Info Re Equipment Qualification Program & Request for Extension of Deadline for Compliance W/Equipment Qualification Rule,Per 851029 Meeting Project stage: RAI ML20136F6991985-11-19019 November 1985 Modifies Scheduled Commitment for Submittal of Final Draft Proposal of Upgraded Tech Specs for NRC Comment,Per 851008 Request.Revised Submittal Date of 851130 Approved.Revised Tabulation of Commitments Encl Project stage: Draft Other ML20136J1831985-11-21021 November 1985 Staff Requirements Memo Re Commission 851119 Meeting in Washington,Dc on Licensee Environ Qualification Exemption Request.Recommendation on Extension Request Should Be Provided by 851122 Project stage: Meeting ML20136J0151985-11-22022 November 1985 Notifies of Withdrawal of 850924 Schedule Extension Request for Environ Qualification Program.Approval of Revised Schedule Extension for Implementation of Program Beyond 851130 Under Provision of 10CFR50.49 Requested Project stage: Withdrawal ML20137H3721985-11-26026 November 1985 Memorandum & Order Granting Extension of 851130 Deadline for Environ Qualification of Electrical Equipment to 860531 & Approving Proposal to Allow Operation w/35% Reactor Power Limit During Interim.Served on 851127 Project stage: Other ML20137Z3631985-12-0505 December 1985 Staff Requirements Memo Re Affirmation/Discussion & Vote on Extension of 851130 Deadline for Environ Qualification & Revised Post 851130 Environ Qualification Extension Request Project stage: Other ML20138L4071985-12-10010 December 1985 Rev B to EE-EQ-0019, Engineering Evaluation of Liner Cooling W/Fire Water Following High Energy Line Break from 35% Power Operation at Fort St Vrain Project stage: Other ML20138B5121985-12-10010 December 1985 Forwards Evaluations to Document Completion of Confirmatory Actions Required to Support 35% Power Restriction During Environ Qualification Schedule Extension Period Project stage: Other ML20137S1171985-12-23023 December 1985 Evaluation of Confirmatory Action Items to Support 35% Power Operation at Fort St Vrain, Technical Evaluation Rept Project stage: Other ML20136C8221985-12-26026 December 1985 Forwards Request for Addl Info to Complete Resolution of Confirmatory Action 6 Re Insp of High Energy Piping.Concerns Include Potential for Inservice Degradation & Exam & Insp Methods Project stage: RAI ML20137L9261985-12-31031 December 1985 Heat Stress Mgt Program for Nuclear Power Industry, Interim Rept Project stage: Other ML20141E5271986-01-0303 January 1986 Forwards Summary of Position on Confirmatory Action 6 Re Insp of Critical Areas of High Energy Piping & Responses to Six Addl Info Requests.Limited Insp Plan Will Be Completed by Middle of Jan 1986.Drawings Encl Project stage: Other ML20141H5491986-01-0808 January 1986 Issue 5 to NDE Procedure QCIM-30, Radiographic Exam Procedure Project stage: Other ML20141H5441986-01-0808 January 1986 Issue 1 to NDE Procedure QCIM-38, Ultrasonic Exam of Class 1 & 2 Piping Welds Joining Similar & Dissimilar Matls Project stage: Other ML20141H5341986-01-0808 January 1986 Forwards NDE Procedures,Per DW Warembourg Project stage: Other ML20137M1091986-01-15015 January 1986 Forwards Addl Info to Support Util Intention to Use Ice Vests to Allow Personnel Access W/Elevated Bldg Temps. T Bernard Prof Opinion Documented in Encl Draft Heat Stress Mgt Program. Rept Available in Central Files Project stage: Draft Other ML20137L9001986-01-21021 January 1986 Forwards EPRI Interim Rept, Heat Stress Mgt Program for Nuclear Power Industry, to Replace Draft Transmitted by Walker ,To Support 35% Power Bldg Access.Rept Will Be Available in Mar as EPRI NP4453 Project stage: Draft Other ML20151R0741986-01-29029 January 1986 Informs That NRR Ltr to Licensee Summarizing Findings Re Environ Qualification Extension Sufficient to Authorize Limited Operation.No License Amend Required to Support Authorization Project stage: Other ML20137R9991986-02-0707 February 1986 Authorizes Interim Operation at 35% of Full Power,Per 851210,860103,08 & 15 Confirmatory Analyses.Forwards Supporting SER & Current Listing of Commitments Project stage: Other ML20154N1501986-03-0303 March 1986 Forwards Final Rept on Inservice Insp Program Performed on High Energy Piping.Program Inspected 35 Critical Areas of Piping Per Safety Evaluation of Confirmatory Item 6. Integrity Verified in Support of 35% Power Operation Project stage: Other 1985-12-31
[Table View] |
Text
_,.
SEP 3 01985 Docket:
50-267/ CAL 85-04 a
s Publ'ic Service Company of.C'olorado ATTN:
- 0. R. Lee, Vice President Electric Production P. O. Box 840 Denver, Colorado 80201-0840 Gentlemen:
My letter of July'19,1985, confirmed your commitments and authorized the
. restart and operation of Fort St. Vrain (FSV) at a power level no greater than 115%. Your letters of August 30, September 10, 11, and 23, 1985, requested
= authorization to operate FSV at a power level no greater than 8% for a period
'of up to 45 days,.not to extend beyond November 30, 1985.
We have reviewed and evaluated your additional submittals and we have verified. acceptable implementation of established procedures. We find it acceptable.for FSV to be operated up to 8% of Rated Thermal Power to remove moisture,from the reactor coolant system. This authorization is based on the availability and capability of the liner cooling system to be satisfactorily placed in service and operated to remove core decay heat subsequent to a postulated High Energy Line Break (HELB). Our evaluation of t
the acceptability of operating FSV in this mode is contained in the enclosed Safety Evaluation.
In authorizing the restart and operation of FSV, we understand that you have committed to the following actions:
1.
With exception of the FSV plant power level, all other commitments l
contained in the July 19, 1985 Confirmatory A: tion Letter continue to apply.
2.
Unless authorized by the NRC to proceed, PSC will restrict the FSV power level to no greater than 8% of the licensed thermal power level.
3.
Power operation of the FSV plant to remove moisture utilizing nuclear heat will be restricted to maximum of 45 days from the date of this j
letter, not to extend beyond November 30, 1985.
CERTIFIED MAIL - RETURN RECEIPT REQUESTED AI 85-510 8510040460 850930 l
PDR ADOCM 05000267 y\\
l
~
Public Service Company of Colorado
. 4.
Verification th'at the operation.of the liner cooling system can be
~
established totally by manual actions.
.5.
The required procedures have been provided for manual operation and verification of operation of the liner cooling system and the required operations personnel training in the use of the procedures for manual operation and verification of the liner-cooling system I
has been completed prior to assuming shift duties.
If your understanding of these. commitments is not the same as ours, please contact this office immediately at (817) 860-8100.
Sincerely, Iws..a hva by j
nug 3. vi. c' Robert D. Martin Regional Administrator
Enclosure:
As stated l
cc:
see next page l
L l
l l
l T..
$[-
RSB RS. C DRS&P:DIR REIreland DRHunter g \\ RPDenise Dhartin s \\
s 9/ 1/85 9/g85 9/26/85 85 7
i
?
cc:
C. K. Millen, Senior Vice President Public Service Company of Colorado
~
P. 0. Box 840.
Denver, Colorado 80201 Mr.- David Alberstein,14/159A GA Technologies, Inc.
P. O.
Box 85608 San Diego, California 92138 Kelly, Stansfield & 0'Donnell Public Service Company Building 550 - 15th Street, Room 900 Denver, Colorado 80202 Chairman, Board of County Comm.
of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental-Protection Agency 1860 Lincoln Street
-Denver, Colorado 80203 Mr. H. L. Brey, Executive Staff Assistant, Electric Production Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201 J. W. Gahm, Manager, Nuclear Production Division Fort St. Vrain Nuclear Station 16805 WCR 191 Platteville, Colorado 80651 L. Singleton, Manager, Quality Assurance Division (same address) bec distrib. by RIV:
RPB Resident Inspector R. D. Martin, RA RSB Section Chief (SP&ES)
EP&RPB P. Wagner, RSB
'R. Denise, DRS&P RIV File D. Powers, RPB1 E. Haycraft, DRSP/LA COLORADO STATE DEPT. HEALTH J. Miller, ORB 3 CPB/NRR D. Eisenhut, D/DL G. Lainas, DL K.'Heitner, ORB 3 J. Taylor, IE E. Jordan, IE Jane-Axelrad,'IE:HQ Betty Summers, IE:HQ Jo Carson, RIV IE36