ML20137S558

From kanterella
Jump to navigation Jump to search

Forwards Comments & Concerns Re Util Requalification Training Program Submitted in 850924 & 1217 Ltrs.Simulator Evaluations Should Only Be Allowed to Be Postponed Until Simulator Available
ML20137S558
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/07/1986
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stolz J
Office of Nuclear Reactor Regulation
References
TAC-59751, TAC-59752, NUDOCS 8602180075
Download: ML20137S558 (3)


Text

m P

i- .,

'f February 7, 1986

. MEMORANDUM FOR: _ John F. Stolz, Chief Operating Reactor Branch #4 Division of Licensing FROM: Caudie A. Julian, Chief Operations Branch

  • Division of Reactor Safety '

SUBJECT:

E. I. HATCH REQUALIFICATION TRAINING PROGRAM We have reviewed the Hat 'h Requalification Program submittid by Georgia Power Company in letters dated statember 24 and December 17, 1985.

~ Enclosed are our commente and concerns with respect to the program. We have provided recommendations !.o assist you in your review; hopefully,.they will be of help in defining Hatch's final program If you need any further information or assistance,~ please contact Mr. Ken E'ockman (FTS/242-2694) of this office.

(Original signed by C.A.Julian)

Caudie A. Julian

Enclosure:

As stated

.bec: w/ encl: .

J. Buzy, NRR Senior Resident Inspector Project Manager, NRR sDocument Control Desk B602180075 860207 PDR ADOCK 0 321 RI( RII RII g

KEBrockman (W

B M ison

(, \

CATul an 2/A/86 2/Q/86 2/g/86

/4

. _t_

L I

. )

ENCLOSURE 1 SPECIFIC COMMENTS

' Paragraph 0.0 The utility NOTE ~ requires all vendor instructors to be enrolled in an approved vendor requalification program. Has NRR approved the vendor requalification programs?- If not, this should be revised to an " appropriate vendor requalification program."

Paragraph 0.1 Reword the paragraph to:

"All individuals who maintain operator or senior operator licenses for the purpose of providing backup capability to the operating staff shall participate in the program."

The paragraph on waivers addresses the criteria for exempting personnel; the caveats of paragraph 0.1 are irrelevant.

Paragraph 0.1.1 Add the additional criteria that only one segment per year per individual may be waived for preparing / grading an exam. (Bullet #2)

The waiver criteria for segment performance evaluations- (Bullet #3) appears. to conflict with paragraph 3.1. Can half, or all, of the reactivity manipulations be credited by evaluating others' performance? Either criteria is acceptable, but~ consistency is necessary.

Paragraph 3.1 See 0.1.1, above Paragraph 3.2.2.2 Remediation for an unsatisfactory result on the evaluation should necessitate formal testing (written or oral) as appropriate for the weakness. This would assist the Manager-0perations, et al, in ascertaining that the operator has adequate knowledge.

2

f:-

n Paragraph 4.1 and 4.2 The concept presented here ~1s aggressive and idealistically, has merit. NRR must assure itself that the philosophy espoused does not violate 10 CFR 55, Appendix A.4.a and b. As . written, if all individuals scored between 60% and 70% on the diagnostic exam, which is the only composite annual exam given, there would be no requirement for the utility to take any actions concerning the immediate operating competency of their. personnel.

The implications of this approval with respect to I&E Inspections is tremendous.

As a minimum, we see that the approval should emphasize the requirement that the annual exam be of a difficulty level such that failing scores can be justified as reflecting diagnostic trends and not reflect less then minimal competence -in the operating staff. The utility is still responsible to initiate remedial action Lfor those personnel who demonstrate their knowledge to be less than the minimal requirements. The approval letter must emphasize this' point.

Paragraph 4.3 Simulator evaluations should only be allowed to be " postponed" until such time as the simulator is again available.

,