ML20058G785

From kanterella
Jump to navigation Jump to search
Notification of 931210 Meeting W/Util to Discuss Submittal Re Request to Revise Hatch Unit 2 TS to Delete Main Steam Isolation Valve Leakage Control Sys & to Increase Allowable MSIV Leakage Rate.Agenda Encl
ML20058G785
Person / Time
Site: Hatch 
Issue date: 12/01/1993
From: Jabbour K
Office of Nuclear Reactor Regulation
To: Plisco L
Office of Nuclear Reactor Regulation
References
NUDOCS 9312100127
Download: ML20058G785 (5)


Text

__.

December 1, 1993 Docket No. 50-366 MEM0P,ANDUM FOR: Loren R. Plisco, Acting Director Project Directorate II-3 Division of Reactor Projects - I/II Kahtan N. Jabbour, Senior Project Manager FROM:

Project Directorate II-3 Division of Reactor Projects - I/II FORTHCOMING MEETING WITH GEORGIA POWER COMPANY AND ITS CONSULTANTS REGARDING EDWIN I. HATCH NUCLEAR PLANT, UNIT 2

SUBJECT:

DATE & TIME:

Friday, December 10, 1993 - 9:00 a.m. - 3:00 p.m.

LOCATION:

One White Flint North 11555 Rockville Pike Rockville, MD 20852 Room 1/F/5 To discuss Georgia Power Company's submittal dated October 1, 1993, regarding its request to revise Hatch Unit 2 Technical PURPOSE:

Specifications to delete the main steam isolation valve (MSIV) leakage control system and to increase the allowable MSIV leakage rate (see enclosed agenda).

GEORGIA POWER AND CONSULTANTS _

NRC J. Heidt, et al. (Georgia Power)

PARTICIPANTS *:

K. Jabbour, NRR S. Harris, et al. (EQE)

C. McCracken, NRR T. Green, et al. (General Electric)

G. Bagchi, NRR J. Norberg, NRR J. Cunningham, NRR et al.

/s/

Kahtan N. aadbour, Senior project Manager 0 8 P 37 Project Directorate 11-3 Division of Reactor Projects - I/II

Enclosure:

Agenda cc w/ enclosure:

See next page

Contact:

Kahtan N. Jabbour 504-1496

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78.

(A)D:PDII DISTRIBilTION LPLISCO41'pf PDII-3: h PDII-3:PM i

SEE NEXT PAGE LBERRY q

KJABBOUR:cw (k/u\\ /93 it/c//93 it /c. /93 Document Name: G:\\ HATCH \\MTG12-10. HAT h% % h[h @

l o

6

k December 1, 1993 l

DISTRIBUTION - Routine Meetina Notice

'DocketFile NRC & Local PDRs PDII-3 Reading Hatch R/F T. Murley/F. Miraglia,12G18 L. Callan, 12G18 SVarga Glainas LPlisco KJabbour LBerry A. Chaffee, llAl OGC, 15B18 E. Jordan, MNBB3701 B. Grimes, llE4 E. Rossi, 9A2 Receptionist, OWFN ACRS (10), P-315 OPA, 2G5 NRR Mailroom,12G18 G. Zech, 10A19 EDO RII Plants, 17G21 E. Merschoff, RII K. Clark, RII C. McCracken, 801 G. Bagchi, 7H15 J. Norberg, 7E23 J. Cunningham, 1004 Y

6

5 gD Flou p

'h l

i B

UNITED STATES

((D 2 j NUCLEAR REGULATORY COMMISSION g

gy

/

WASHINGTON, D.C. 20555-0001

  • =.++

December 1, 1993 Docket No. 50-366 t

MEMORANDUM FOR:

Loren R. Plisco, Acting Director Project Directorate 11-3

[

Division of Reactor Projects - I/II FROM:

Kahtan N. Jabbour, Senior Project Manager Project Directorate 11-3 Division of Reactor Projects - I/II

SUBJECT:

FORTHCOMING MEETING WITH GEORGIA POWER COMPANY AND ITS CONSULTANTS REGARDING EDWIN 1. HATCH NUCLEAR PLANT, UNIT 2 i

DATE & TIME:

Friday, December 10, 1993 - 9:00 a.m. - 3:00 p.m.

l LOCATION:

One White Flint North i

11555 Rockville Pike Rockville, Maryland 20852 i

Room 1/F/5 l

t PURPOSE:

To discuss Georgia Power Company's submittal dated October 1, 1993, regarding its request to revise Hatch Unit 2 Technical i

Specifications to delete the main steam isolation valve (MSIV) leakage control system and to increase the allowable j

MSIV leakage rate.

(See enclosed agenda)

PARTICIPANTS *:

NRC GEORGIA POWER AND CONSULTANTS K. Jabbour, NRR J. Heidt, et al. (Georgia Power) i C. McCracken, NRR S. Harris, et al. (EQE)

G. Bagchi, NRR T. Green, et al. (General Electric)

J. Norberg, NRR J. Cunningham, NRR et al.

j KaAL d. Zd~

Kahtan N. Jabbour, Senior Project Manager Project Directorate II-3 Division of Reactor Projects - I/II i

Enclosure:

Agenda

{

t cc w/ enclosure: See next page l

Contact:

Kahtan N. Jabbour i

504-1496

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to *Open Meeting Statement of NRC Staff Policy," 43 faderal Reaister 28058, 6/28/78.

4

h Georgia Power Company Edwin 1. Hatch Nuclear Plant 4

CC:

Mr. Ernest L. Blake, Jr.

Mr. Alan R. Herdt, Chief Shaw, Pittman, Potts and Trowbridge Project Branch #3 2300 N Street, NW.

U. S. Nuclear Regulatory Commission Washington, DC 20037 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. S. J. Bethay Manager Licensing - Hatch Mr Dan H. Smith, Vice President i

Georgia Power Company Power Supply Operations P. O. Box 1295 Oglethorpe Power Corporation Birmingham, Alabama 35201 2100 East Exchange Place Tucker, Georgia 30085-1349 Mr. L. Sumner General Manager, Nuclear Plant Charles A. Patrizia, Esquire Georgia Power Company Paul, Hastings Janofsky & Walker Route 1, Box 439 12th Floor Baxley, Georgia 31513 1050 Connecticut Avenue, NW.

Washington. DC 20036 Resident Inspector 6

U.S. Nuclear Regulatory Commission Mr. Jack D. Woodard Route 1, Box 725 Senior Vice President -

Baxley, Georgia 31513 Nuclear Operations Georgia Power Company Regional Administrator, Region II P. O. Box 1295 U.S. Nuclear Regulatory Commission Birmingham, Alabama 35201 101 Marietta Street, NW. Suite 2900 Atlanta, Georgia 30323 Chairman i

Appling County Commissioners Mr. Charles H. Badger County Courthouse Office of Planning and Budget Baxley, Georgia 31513 Room 610 270 Washington Street, SW.

Mr. J. T. Beckham, Jr.

Atlanta, Georgia 30334 Vice President - Plant Hatch Georgia Power Company Harold Reheis, Director P. O. Box 1295 Department of Natural Resources Birmingham, Alabama 35201 205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334

]

[

9

1 1

~

a.

s AGENDA NRC/GPC MEETING DECEMBER 10. 1993 i

REVISION TO HATCH UNIT 2 TECHNICAL SPECIFICATIONS TO DELETE THE MSIV LEAKAGE CONTROL SYSTEM AND TO INCREASE THE ALLOWABLE MSIV LEAKAGE RATE Introduction NRC/GPC Reason for Removing System GPC

=

Overview of GE Topical Report GE Radiological Dose Assessment GE Seismic Evaluation (Methodology, EQE Deviations from RG 1.29, and

~

Seismic Evaluation at Plant Hatch)

Discussion of Modifications GPC

=

Closing Remarks NRC/GPC I

5 h