Forwards LER 97-002-00 Re Condition Prohibited by Plant Tss. Util Commitments Made by Ltr,Listed
ML20137H735
Person / Time
Site: Quad Cities 
Issue date: 03/28/1997
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137H741 List:
References
LWP-97-028, LWP-97-28, NUDOCS 9704030040
Download: ML20137H735 (2)


LER-1997-002, Forwards LER 97-002-00 Re Condition Prohibited by Plant Tss. Util Commitments Made by Ltr,Listed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(1)
2651997002R00 - NRC Website

text

Commonwcalth Edivan Company e

Quad Cities Generating 5tatina 22710 206th Avenue North Cordova, IL 612 42-9?40 Tel.409M 4-224 I LWP-97-028 March 28, 1997 I

United States Nuclear Regulatory Commission Washington, DC 20555 Attention:

Document Control Desk

Reference:

Quad Cities Nuclear Power Station Docket Number 50-265, DPR-30, Unit 2 i

Enclosed is Licensee Event Report (LER)97-002, Revision 00, for Quad Cities Nuclear Power Station.

i o

This report is submitted in accordance with the requirements of the l

f]

Code of Federal Regulations, Title 10, Part 50.73(a)(2)(1)(B). The s

licensee shall report any operation or condition prohibited by the Plant's Technical Specifications.

The following commitments are being made by this letter:

1.

The IST acceptance criteria for the PORVs will be revised using the data obtained from QCOS 0203-03 performed on 022897.

New baseline data will' be established for valves repaired or replaced during Q2R14 during start-up testing.

2.

This LER will be included as required reading in the training program for the Inservice Testing Coordinator.

3.

QCAP 0410-01, Inservice Testing Program Administration, will be revised to require reevaluation of baseline data and the associated acceptance criteria when the test methodology is changed.

0200SG I

9704030040 970328 PDR ADOCK 05000265 O

S PDR lillllllllllll1lIll!Illll4 STMGR\\02897.LWP A l'nicom Compan)

LWP-97-028 2

March 28, 1997 If there are any questions or comments concerning this letter, please refer them to Charles Peterson, Regulatory Affairs Manager at 309-654-2241, ext. 3609.

Respectfully, C

WEA EDIS0N COMPANY ITI S UCLEAR POWER STATION bl L4L L

W. Pearce Station Manager LWP/CP/plm r

Enclosure A. B. Beach, Regional Administrator, Region III cc:

R. M. Pulsifer, Project Manager, NRR C. G. Miller, Senior Resident Inspector, Quad Cities W. D. Leech, MidAmerican Energy Company D. C. Tubbs, MidAmerican' Energy Company P. L. Piet, Licensing, Comed

,O F. A. Spangenberg, Regulatory Affairs Manager, Dresden INPO Records Center I