MONTHYEARML20132F0231985-07-19019 July 1985 Forwards Safety Evaluation Re Environ Qualification of Electric Equipment Important to Safety & Authorizes Interim Operation in dry-out Mode at Max 15% of Rated Power,Based on Listed Conditions,Until Technical Review Completed Project stage: Approval ML20132E6081985-07-19019 July 1985 Supplemental Safety Evaluation Supporting Licensee CRD Mechanisms & Associated Position Instrumentation,Per 850712 Safety Evaluation & Licensee 850710 & 18 Submittals.Control Rod Program Acceptable for Plant Restart Project stage: Request ML20132F0721985-07-19019 July 1985 Safety Evaluation Documenting Deficiencies in Licensee Program for Environ Qualification of Electric Equipment Important to Safety.Licensee Response to Generic Ltr 84-24 Inadequate.However,Operation at 15% Power Authorized Project stage: Approval ML20134M0161985-08-20020 August 1985 Submits Discussion of Technical Issues Re Environ Qualification Program Raised During Meetings W/Nrc.Aging & Operability Time Program Operator Response Time,Temp Profiles & Shutdown Cooling Paths & Equipment Evaluated Project stage: Meeting IR 05000267/19850211985-08-30030 August 1985 Insp Rept 50-267/85-21 on 850721-31.No Violation or Deviation Noted.Major Areas Inspected:Operational Safety Verification Project stage: Request ML20137X1411985-09-30030 September 1985 Safety Evaluation Supporting Util 850830,0910,11 & 23 Requests for Authorization to Operate at Max 8% Power,For Up to 45 Days,To Remove Moisture from RCS Project stage: Approval ML20137X1241985-09-30030 September 1985 Forwards Safety Evaluation Based on Util 850830,0910,11 & 23 Requests for Authorization to Operate at Max 8% Power,For Up to 45 Days,To Remove Moisture from Rcs.Authorization Granted,Subj to Listed Commitments Project stage: Approval ML20138E3921985-10-11011 October 1985 Forwards Request for Addl Info on 850924 Request for Special Consideration & Schedule Extension to Equipment Qualification rule,10CFR50.49.Info Requested within 7 Days of Ltr Receipt Project stage: RAI ML20138C8111985-10-21021 October 1985 Forwards Response to 851011 Request for Addl Info Re 850924 Request for Schedule Extension for Environ Qualification Program Under 10CFR50.49 from 851130 to 860331 Project stage: Request ML20138R7331985-10-31031 October 1985 Summary of 851029 Meeting W/Util & ORNL Re Schedule Extension to Equipment Qualification Rule.List of Attendees, Agenda & Matls Presented by Util Encl Project stage: Meeting ML20209J0821985-11-0505 November 1985 Forwards Request for Addl Info Re Equipment Qualification Program & Request for Extension of Deadline for Compliance W/Equipment Qualification Rule,Per 851029 Meeting Project stage: RAI ML20136F6991985-11-19019 November 1985 Modifies Scheduled Commitment for Submittal of Final Draft Proposal of Upgraded Tech Specs for NRC Comment,Per 851008 Request.Revised Submittal Date of 851130 Approved.Revised Tabulation of Commitments Encl Project stage: Draft Other ML20136J1831985-11-21021 November 1985 Staff Requirements Memo Re Commission 851119 Meeting in Washington,Dc on Licensee Environ Qualification Exemption Request.Recommendation on Extension Request Should Be Provided by 851122 Project stage: Meeting ML20136J0151985-11-22022 November 1985 Notifies of Withdrawal of 850924 Schedule Extension Request for Environ Qualification Program.Approval of Revised Schedule Extension for Implementation of Program Beyond 851130 Under Provision of 10CFR50.49 Requested Project stage: Withdrawal ML20137H3721985-11-26026 November 1985 Memorandum & Order Granting Extension of 851130 Deadline for Environ Qualification of Electrical Equipment to 860531 & Approving Proposal to Allow Operation w/35% Reactor Power Limit During Interim.Served on 851127 Project stage: Other ML20137Z3631985-12-0505 December 1985 Staff Requirements Memo Re Affirmation/Discussion & Vote on Extension of 851130 Deadline for Environ Qualification & Revised Post 851130 Environ Qualification Extension Request Project stage: Other ML20138L4071985-12-10010 December 1985 Rev B to EE-EQ-0019, Engineering Evaluation of Liner Cooling W/Fire Water Following High Energy Line Break from 35% Power Operation at Fort St Vrain Project stage: Other ML20138B5121985-12-10010 December 1985 Forwards Evaluations to Document Completion of Confirmatory Actions Required to Support 35% Power Restriction During Environ Qualification Schedule Extension Period Project stage: Other ML20137S1171985-12-23023 December 1985 Evaluation of Confirmatory Action Items to Support 35% Power Operation at Fort St Vrain, Technical Evaluation Rept Project stage: Other ML20136C8221985-12-26026 December 1985 Forwards Request for Addl Info to Complete Resolution of Confirmatory Action 6 Re Insp of High Energy Piping.Concerns Include Potential for Inservice Degradation & Exam & Insp Methods Project stage: RAI ML20137L9261985-12-31031 December 1985 Heat Stress Mgt Program for Nuclear Power Industry, Interim Rept Project stage: Other ML20141E5271986-01-0303 January 1986 Forwards Summary of Position on Confirmatory Action 6 Re Insp of Critical Areas of High Energy Piping & Responses to Six Addl Info Requests.Limited Insp Plan Will Be Completed by Middle of Jan 1986.Drawings Encl Project stage: Other ML20141H5491986-01-0808 January 1986 Issue 5 to NDE Procedure QCIM-30, Radiographic Exam Procedure Project stage: Other ML20141H5441986-01-0808 January 1986 Issue 1 to NDE Procedure QCIM-38, Ultrasonic Exam of Class 1 & 2 Piping Welds Joining Similar & Dissimilar Matls Project stage: Other ML20141H5341986-01-0808 January 1986 Forwards NDE Procedures,Per DW Warembourg Project stage: Other ML20137M1091986-01-15015 January 1986 Forwards Addl Info to Support Util Intention to Use Ice Vests to Allow Personnel Access W/Elevated Bldg Temps. T Bernard Prof Opinion Documented in Encl Draft Heat Stress Mgt Program. Rept Available in Central Files Project stage: Draft Other ML20137L9001986-01-21021 January 1986 Forwards EPRI Interim Rept, Heat Stress Mgt Program for Nuclear Power Industry, to Replace Draft Transmitted by Walker ,To Support 35% Power Bldg Access.Rept Will Be Available in Mar as EPRI NP4453 Project stage: Draft Other ML20151R0741986-01-29029 January 1986 Informs That NRR Ltr to Licensee Summarizing Findings Re Environ Qualification Extension Sufficient to Authorize Limited Operation.No License Amend Required to Support Authorization Project stage: Other ML20137R9991986-02-0707 February 1986 Authorizes Interim Operation at 35% of Full Power,Per 851210,860103,08 & 15 Confirmatory Analyses.Forwards Supporting SER & Current Listing of Commitments Project stage: Other ML20154N1501986-03-0303 March 1986 Forwards Final Rept on Inservice Insp Program Performed on High Energy Piping.Program Inspected 35 Critical Areas of Piping Per Safety Evaluation of Confirmatory Item 6. Integrity Verified in Support of 35% Power Operation Project stage: Other 1985-12-31
[Table View] |
Text
-
.
.
APPENDIX
-
,
U. S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report: 50-267/85-21 License: DPR-34
. Docket: 50-267 Licensee:
Public Service Company of Colorado
"
P. O. Box 840 Denver, Colorado 80201 Facility Name: Fort St.'Vrain Nuclear Station (FSV)
Inspection At: Platteville, Colorado Inspection Conducted: July 21-1, 19 Inspector :-
////.
O
'
7kow Pfoject Inspector.
Date Pr ecLS tion A,-Reactor Projects Branch s
Y$. Ob/wY W/2 9 h5 R. E. Ireland, Chief, Engineering Section D&te
/-
Reactor Safety Branch
.
A4/ M M
Approved:
. Jo ns /Jaudfn, Chief, Project Section A Date ct6r P{ojects Branch R
Inspection Summary Inspection Conducted July 21-31, 1985 (Report 50-267/85-21)
Areas Inspected: Routine, unannounced inspection of operational safety verification. The inspection involved 50 inspector-hours onsite by two NRC inspectors.
g92gg g
G t.
,
m
A
.
.
.
Results: Within the areas inspected, no violations or deviations were identified.
.
..
.
DETAILS 1.
Persons Contacted J. C. Gahm, Manager, Nuclear Power Operations
- C. Fuller, Station Manager F. Novachek, Technical / Administrative Services Manager
- F. Borst, Support Services Manager
- Denotes those present at exit interview 2.
Operational Safety Verification The NRC inspectors observed control room activities, control room panels, toured the plant observing general conditions and plant status. During this inspection period, the reactor was started up for the first time in over 1 year. Because of-the extended shutdown and the nature of the maintenance activities permitting moisture to become absorbed in the primary systems, a slow rise to power was anticipated. This period would permit the removal of the excess moisture.
An automatic reactor shutdown occurred a few days after startup due to high moisture just after midnight, the morning of July 24, 1985. Human factors engineering appears.to have contributed to the shutdown. A valve in the bearing water drain from the "A" circulator was inadvertently operated in closed direction vice the open direction. This action forced water past the circulator seals into the reactor coolant. The notation on the control switch previously read "open" or " closed." The revised notation read "INCR" or "DECR" differential pressure. Based on discussions with plant personnel, the revised notation was intended to reduce operator thought processes.
It appears that increased thought process as well as-misinterpretation of "INCR" and "DECR" took place.
Plant personnel stated the operator knew that he wanted the valve to move in the open direction, but could not remember which switch position would cause the desired valve movement. The "Open" and "Close" notation was subsequently added to the switch position labels.
In addition, other similarly labeled switches have also had the "open" and "close" notation added. The labeling aspects of this event were discussed with the staff of the Human Factors Engineering Branch of NRR.
No violations or deviations were noted.
3.
Exit Interview An exit interview was held on July 19, 1985, with Mr. Fuller and Mr. Borst.. At ~the meeting, the scope of the inspection was summarized.
.
An additional exit was held on July 22, 1985', by Mr. Ireland with Mr. Fuller and Mr. Borst.