Insp Rept 50-482/97-07 on 970203-07.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including,Updated FSAR Records & Repts,Testing & Maint, Assessment Aids,Detection aids-protected Area & Vital AreaML20135B601 |
Person / Time |
---|
Site: |
Wolf Creek |
---|
Issue date: |
02/26/1997 |
---|
From: |
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
---|
To: |
|
---|
Shared Package |
---|
ML20135B586 |
List: |
---|
References |
---|
50-482-97-07, 50-482-97-7, NUDOCS 9703030120 |
Download: ML20135B601 (15) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000482/19990091999-10-0707 October 1999 Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted. Major Areas Inspected:Events,Emergency Preparedness Facilities & Equipment,Emergency Plan & Implementing Procedures & Emergency Response Organization Training IR 05000482/19990051999-09-21021 September 1999 Insp Rept 50-482/99-05 Has Been Rescheduled for Next Yr.Insp Rept Will Not Be Issued IR 05000482/19990131999-09-20020 September 1999 Insp Rept 50-482/99-13 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19990121999-09-14014 September 1999 Insp Rept 50-482/99-12 on 990816-20.No Violations Noted. Major Areas Inspected:Solid Radioactive Waste Mgt Program, Radioactive Matls Transportation Program,Facilities & Equipment,Staff Kowledge & Performance & Staff Training IR 05000482/19990161999-08-26026 August 1999 Insp Rept 50-482/99-16 on 990809-13.No Violations Noted. Major Areas Inspected:Planning & Preparation,Program to Maintain Occupational Exposure Alara,Temporary Shielding Program & Hot Spot Reduction Program IR 05000482/19990081999-08-18018 August 1999 Insp Rept 50-482/99-08 on 990613-0724.Noncited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000482/19990111999-08-13013 August 1999 Insp Rept 50-482/99-11 on 990712-16.No Violations Noted. Major Areas Inspected:Review of Radiological Environ Monitoring Program,Meterological Monitoring Prgram & Results of Licensee Investigation of 990525 Personnel Event IR 05000482/19990151999-08-10010 August 1999 Canceled Insp Rept 50-482/99-15.No Inspection Rept Will Be Issued for This Rept Number IR 05000482/19990071999-07-15015 July 1999 Insp Rept 50-482/99-07 on 990614-18.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Radiation Protection Program Activities IR 05000482/19990061999-07-0202 July 1999 Insp Rept 50-482/99-06 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19990031999-05-21021 May 1999 Insp Rept 50-482/99-03 on 990321-0501.Four NCVs Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000482/19990041999-05-0505 May 1999 Insp Rept 50-482/99-04 on 990405-09.No Violations Noted. Major Areas Inspected:Licensee Implementation of Facility Inservice Insp Program & Followup Review of Previously Identified Insp Findings IR 05000482/19990021999-04-0909 April 1999 Insp Rept 50-482/99-02 on 990207-0320.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19990011999-01-26026 January 1999 Insp Rept 50-482/99-01 on 990111-14.No Violations Noted. Major Areas Inspected:Testing & Maintenance,Protected Area Barriers & Detection Aids,Vital Area Barriers & Detection Aids,Compensatory Measures & Security Sys Power Supply IR 05000482/19980201999-01-15015 January 1999 Insp Rept 50-482/98-20 on 981115-1226.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000482/19980161998-12-10010 December 1998 Informs That Insp Rept 50-482/98-16 Was Combined with Insp Rept 50-482/98-12,therefore,no Rept Will Be Issued for Rept 50-482/98-16 ML20196H3711998-12-0303 December 1998 Insp Rept 50-482/98-19 on 981002-1114.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Licensee Response to Road Closure Due to Flooding within 10-mile Emergency Zone Was Excellent ML20155A1871998-10-22022 October 1998 Insp Rept 50-482/98-17 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Use of Fire Protection Sys Pumps for Purposes Other than Fire Protection Constituted Degradation of Sys IR 05000482/19980181998-10-0505 October 1998 Insp Rept 50-482/98-18 on 980921-25.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Assessment Aids,Communications & Security Program Plan & Procedures ML20154C7071998-09-29029 September 1998 Insp Rept 50-482/98-12 on 980323-0410 & 0622-25.Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000482/19980151998-09-0404 September 1998 Insp Rept 50-482/98-15 on 980712-0822.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20236T1461998-07-23023 July 1998 Insp Rept 50-482/98-14 on 980531-0711.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19980131998-06-12012 June 1998 Insp Rept 50-482/98-13 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20216A9051998-05-0606 May 1998 Insp Rept 50-482/98-10 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217M3691998-04-30030 April 1998 Insp Rept 50-482/98-07 on 980330-0403.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20217M5491998-04-0202 April 1998 Insp Rept 50-482/98-11 on 980316-20.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Waste/Matls Transportation Programs IR 05000482/19980041998-04-0101 April 1998 Insp Rept 50-482/98-04 on 980125-0307.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19980081998-03-30030 March 1998 Insp Rept 50-482/98-08 on 980302-06.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20216G5761998-03-13013 March 1998 Insp Rept 50-482/98-09 on 980223-27.Violation Noted.Major Areas Inspected:Radiation Protection Program IR 05000482/19980021998-03-0606 March 1998 Insp Rept 50-482/98-02 on 980202-06.No Violations Noted. Major Areas Inspected:Maint,Engineering & Emergency Preparedness IR 05000482/19980061998-02-27027 February 1998 Insp Rept 50-482/98-06 on 980202-06.No Violations Noted. Major Areas Inspected:Review of Radiation Protection Program Activities ML20203K9181998-02-26026 February 1998 Insp Rept 50-482/98-03 on 980202-06.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Mgt Program,Training & Qualifications,Qa Oversight, Facilities & Equipment & Annual Repts ML20203H5341998-02-23023 February 1998 Insp Rept 50-482/97-201 on 971103-980109.No Violations Noted.Major Areas Inspected:Capability of RHR & CCW Sys to Perform Safety Functions Required by Design Bases & Adherence of Sys to Design & Licensing Bases IR 05000482/19970211998-02-0909 February 1998 Insp Rept 50-482/97-21 Cancelled IR 05000482/19970231998-01-29029 January 1998 Insp Rept 50-482/97-23 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19980011998-01-23023 January 1998 Insp Rept 50-482/98-01 on 980112-16.No Violation Noted. Major Areas Inspected:Licensee Physical Security Program, Including Protected Area Barriers & Detection Aids,Vital Area Barriers & Detection Aids & Compensatory Measures ML20198A7641997-12-29029 December 1997 Insp Rept 50-482/97-22 on 971102-1213.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19970191997-11-25025 November 1997 Insp Rept 50-482/97-19 on 970922-1102.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19970201997-11-14014 November 1997 Insp Rept 50-482/97-20 on 971020-24.Violations Noted.Major Areas Inspected:Planning & Preparation,External & Internal Exposure Controls,Control of Radioactive Material & Contamination,Training & Qualifications IR 05000482/19970171997-10-29029 October 1997 Insp Rept 50-482/97-17 on 970929-1010.No Violations Noted. Major Areas Inspected:Maint IR 05000482/19970151997-10-22022 October 1997 Insp Rept 50-482/97-15 on 970922-25.no Violations Noted. Major Areas Inspected:Radiological Protection & Chemistry Controls & Status of Radiological Protection & Chemistry Facilities & Equipment IR 05000482/19970161997-10-21021 October 1997 Insp Rept 50-482/97-16 on 971006-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Included Access Authorization,Alarm Stations,Communications, Access Control of Personnel & Packages IR 05000482/19970141997-10-0202 October 1997 Insp Rept 50-482/97-14 on 970810-0920.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19973011997-09-17017 September 1997 Insp Rept 50-482/97-301 on 970825-29.No Violations Noted. Major Areas Inspected:Operations IR 05000482/19970121997-09-0404 September 1997 Insp Rept 50-482/97-12 on 970811-15.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program ML20210N6941997-08-21021 August 1997 Insp Rept 50-482/97-11 on 970629-0809.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20141J9561997-08-17017 August 1997 Insp Rept 50-482/97-13 on 970624-27 & 0708.No Violations Noted.Major Areas Inspected:Followup on licensee-identified Welding Work Control Issues by Observation of Welding & Welding Matl Control Activities ML20140E8511997-06-0606 June 1997 Insp Rept 50-482/97-09 on 970406-0517.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Re Violation Which Cites Licensee Failure to Comply W/Security Escort Requirements IR 05000482/19970031997-05-0202 May 1997 Insp Rept 50-482/97-03 on 970414-17.No Violations Noted. Major Areas Inspected:Operations ML20140E7261997-04-25025 April 1997 Insp Rept 50-482/97-08 on 970223-0405.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering, Plant Support & Plant Status 1999-09-21
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000482/19990091999-10-0707 October 1999 Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted. Major Areas Inspected:Events,Emergency Preparedness Facilities & Equipment,Emergency Plan & Implementing Procedures & Emergency Response Organization Training IR 05000482/19990051999-09-21021 September 1999 Insp Rept 50-482/99-05 Has Been Rescheduled for Next Yr.Insp Rept Will Not Be Issued IR 05000482/19990131999-09-20020 September 1999 Insp Rept 50-482/99-13 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19990121999-09-14014 September 1999 Insp Rept 50-482/99-12 on 990816-20.No Violations Noted. Major Areas Inspected:Solid Radioactive Waste Mgt Program, Radioactive Matls Transportation Program,Facilities & Equipment,Staff Kowledge & Performance & Staff Training IR 05000482/19990161999-08-26026 August 1999 Insp Rept 50-482/99-16 on 990809-13.No Violations Noted. Major Areas Inspected:Planning & Preparation,Program to Maintain Occupational Exposure Alara,Temporary Shielding Program & Hot Spot Reduction Program IR 05000482/19990081999-08-18018 August 1999 Insp Rept 50-482/99-08 on 990613-0724.Noncited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000482/19990111999-08-13013 August 1999 Insp Rept 50-482/99-11 on 990712-16.No Violations Noted. Major Areas Inspected:Review of Radiological Environ Monitoring Program,Meterological Monitoring Prgram & Results of Licensee Investigation of 990525 Personnel Event IR 05000482/19990151999-08-10010 August 1999 Canceled Insp Rept 50-482/99-15.No Inspection Rept Will Be Issued for This Rept Number IR 05000482/19990071999-07-15015 July 1999 Insp Rept 50-482/99-07 on 990614-18.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Radiation Protection Program Activities IR 05000482/19990061999-07-0202 July 1999 Insp Rept 50-482/99-06 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19990031999-05-21021 May 1999 Insp Rept 50-482/99-03 on 990321-0501.Four NCVs Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000482/19990041999-05-0505 May 1999 Insp Rept 50-482/99-04 on 990405-09.No Violations Noted. Major Areas Inspected:Licensee Implementation of Facility Inservice Insp Program & Followup Review of Previously Identified Insp Findings IR 05000482/19990021999-04-0909 April 1999 Insp Rept 50-482/99-02 on 990207-0320.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19990011999-01-26026 January 1999 Insp Rept 50-482/99-01 on 990111-14.No Violations Noted. Major Areas Inspected:Testing & Maintenance,Protected Area Barriers & Detection Aids,Vital Area Barriers & Detection Aids,Compensatory Measures & Security Sys Power Supply IR 05000482/19980201999-01-15015 January 1999 Insp Rept 50-482/98-20 on 981115-1226.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000482/19980161998-12-10010 December 1998 Informs That Insp Rept 50-482/98-16 Was Combined with Insp Rept 50-482/98-12,therefore,no Rept Will Be Issued for Rept 50-482/98-16 ML20196H3711998-12-0303 December 1998 Insp Rept 50-482/98-19 on 981002-1114.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Licensee Response to Road Closure Due to Flooding within 10-mile Emergency Zone Was Excellent ML20155A1871998-10-22022 October 1998 Insp Rept 50-482/98-17 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Use of Fire Protection Sys Pumps for Purposes Other than Fire Protection Constituted Degradation of Sys IR 05000482/19980181998-10-0505 October 1998 Insp Rept 50-482/98-18 on 980921-25.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Assessment Aids,Communications & Security Program Plan & Procedures ML20154C7071998-09-29029 September 1998 Insp Rept 50-482/98-12 on 980323-0410 & 0622-25.Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000482/19980151998-09-0404 September 1998 Insp Rept 50-482/98-15 on 980712-0822.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20236T1461998-07-23023 July 1998 Insp Rept 50-482/98-14 on 980531-0711.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19980131998-06-12012 June 1998 Insp Rept 50-482/98-13 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20216A9051998-05-0606 May 1998 Insp Rept 50-482/98-10 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217M3691998-04-30030 April 1998 Insp Rept 50-482/98-07 on 980330-0403.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20217M5491998-04-0202 April 1998 Insp Rept 50-482/98-11 on 980316-20.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Waste/Matls Transportation Programs IR 05000482/19980041998-04-0101 April 1998 Insp Rept 50-482/98-04 on 980125-0307.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19980081998-03-30030 March 1998 Insp Rept 50-482/98-08 on 980302-06.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20216G5761998-03-13013 March 1998 Insp Rept 50-482/98-09 on 980223-27.Violation Noted.Major Areas Inspected:Radiation Protection Program IR 05000482/19980021998-03-0606 March 1998 Insp Rept 50-482/98-02 on 980202-06.No Violations Noted. Major Areas Inspected:Maint,Engineering & Emergency Preparedness IR 05000482/19980061998-02-27027 February 1998 Insp Rept 50-482/98-06 on 980202-06.No Violations Noted. Major Areas Inspected:Review of Radiation Protection Program Activities ML20203K9181998-02-26026 February 1998 Insp Rept 50-482/98-03 on 980202-06.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Mgt Program,Training & Qualifications,Qa Oversight, Facilities & Equipment & Annual Repts ML20203H5341998-02-23023 February 1998 Insp Rept 50-482/97-201 on 971103-980109.No Violations Noted.Major Areas Inspected:Capability of RHR & CCW Sys to Perform Safety Functions Required by Design Bases & Adherence of Sys to Design & Licensing Bases IR 05000482/19970211998-02-0909 February 1998 Insp Rept 50-482/97-21 Cancelled IR 05000482/19970231998-01-29029 January 1998 Insp Rept 50-482/97-23 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19980011998-01-23023 January 1998 Insp Rept 50-482/98-01 on 980112-16.No Violation Noted. Major Areas Inspected:Licensee Physical Security Program, Including Protected Area Barriers & Detection Aids,Vital Area Barriers & Detection Aids & Compensatory Measures ML20198A7641997-12-29029 December 1997 Insp Rept 50-482/97-22 on 971102-1213.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19970191997-11-25025 November 1997 Insp Rept 50-482/97-19 on 970922-1102.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19970201997-11-14014 November 1997 Insp Rept 50-482/97-20 on 971020-24.Violations Noted.Major Areas Inspected:Planning & Preparation,External & Internal Exposure Controls,Control of Radioactive Material & Contamination,Training & Qualifications IR 05000482/19970171997-10-29029 October 1997 Insp Rept 50-482/97-17 on 970929-1010.No Violations Noted. Major Areas Inspected:Maint IR 05000482/19970151997-10-22022 October 1997 Insp Rept 50-482/97-15 on 970922-25.no Violations Noted. Major Areas Inspected:Radiological Protection & Chemistry Controls & Status of Radiological Protection & Chemistry Facilities & Equipment IR 05000482/19970161997-10-21021 October 1997 Insp Rept 50-482/97-16 on 971006-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Included Access Authorization,Alarm Stations,Communications, Access Control of Personnel & Packages IR 05000482/19970141997-10-0202 October 1997 Insp Rept 50-482/97-14 on 970810-0920.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19973011997-09-17017 September 1997 Insp Rept 50-482/97-301 on 970825-29.No Violations Noted. Major Areas Inspected:Operations IR 05000482/19970121997-09-0404 September 1997 Insp Rept 50-482/97-12 on 970811-15.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program ML20210N6941997-08-21021 August 1997 Insp Rept 50-482/97-11 on 970629-0809.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20141J9561997-08-17017 August 1997 Insp Rept 50-482/97-13 on 970624-27 & 0708.No Violations Noted.Major Areas Inspected:Followup on licensee-identified Welding Work Control Issues by Observation of Welding & Welding Matl Control Activities ML20140E8511997-06-0606 June 1997 Insp Rept 50-482/97-09 on 970406-0517.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Re Violation Which Cites Licensee Failure to Comply W/Security Escort Requirements IR 05000482/19970031997-05-0202 May 1997 Insp Rept 50-482/97-03 on 970414-17.No Violations Noted. Major Areas Inspected:Operations ML20140E7261997-04-25025 April 1997 Insp Rept 50-482/97-08 on 970223-0405.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering, Plant Support & Plant Status 1999-09-21
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000482/19990091999-10-0707 October 1999 Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted. Major Areas Inspected:Events,Emergency Preparedness Facilities & Equipment,Emergency Plan & Implementing Procedures & Emergency Response Organization Training IR 05000482/19990051999-09-21021 September 1999 Insp Rept 50-482/99-05 Has Been Rescheduled for Next Yr.Insp Rept Will Not Be Issued IR 05000482/19990131999-09-20020 September 1999 Insp Rept 50-482/99-13 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19990121999-09-14014 September 1999 Insp Rept 50-482/99-12 on 990816-20.No Violations Noted. Major Areas Inspected:Solid Radioactive Waste Mgt Program, Radioactive Matls Transportation Program,Facilities & Equipment,Staff Kowledge & Performance & Staff Training IR 05000482/19990161999-08-26026 August 1999 Insp Rept 50-482/99-16 on 990809-13.No Violations Noted. Major Areas Inspected:Planning & Preparation,Program to Maintain Occupational Exposure Alara,Temporary Shielding Program & Hot Spot Reduction Program IR 05000482/19990081999-08-18018 August 1999 Insp Rept 50-482/99-08 on 990613-0724.Noncited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000482/19993011999-08-17017 August 1999 Exam Rept 50-482/99-301 on 990726-29.Exam Results:All Nine Applicants Passed Written Exams & Exhibited No Broad Knowledge or Training Weaknesses IR 05000482/19990111999-08-13013 August 1999 Insp Rept 50-482/99-11 on 990712-16.No Violations Noted. Major Areas Inspected:Review of Radiological Environ Monitoring Program,Meterological Monitoring Prgram & Results of Licensee Investigation of 990525 Personnel Event IR 05000482/19990151999-08-10010 August 1999 Canceled Insp Rept 50-482/99-15.No Inspection Rept Will Be Issued for This Rept Number IR 05000482/19990071999-07-15015 July 1999 Insp Rept 50-482/99-07 on 990614-18.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Radiation Protection Program Activities IR 05000482/19990061999-07-0202 July 1999 Insp Rept 50-482/99-06 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-IV-99-029, on 990625,female Licensee Employee Was Discovered Contaminated in Facial Area.Licensee Convened Incident Investigation Team to Assess Event.Worker Received Total Effective Dose Equivalent of Approx 7 Mrem1999-06-28028 June 1999 PNO-IV-99-029:on 990625,female Licensee Employee Was Discovered Contaminated in Facial Area.Licensee Convened Incident Investigation Team to Assess Event.Worker Received Total Effective Dose Equivalent of Approx 7 Mrem IR 05000482/19990031999-05-21021 May 1999 Insp Rept 50-482/99-03 on 990321-0501.Four NCVs Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000482/19990041999-05-0505 May 1999 Insp Rept 50-482/99-04 on 990405-09.No Violations Noted. Major Areas Inspected:Licensee Implementation of Facility Inservice Insp Program & Followup Review of Previously Identified Insp Findings IR 05000482/19990021999-04-0909 April 1999 Insp Rept 50-482/99-02 on 990207-0320.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19990011999-01-26026 January 1999 Insp Rept 50-482/99-01 on 990111-14.No Violations Noted. Major Areas Inspected:Testing & Maintenance,Protected Area Barriers & Detection Aids,Vital Area Barriers & Detection Aids,Compensatory Measures & Security Sys Power Supply IR 05000482/19980201999-01-15015 January 1999 Insp Rept 50-482/98-20 on 981115-1226.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000482/19980161998-12-10010 December 1998 Informs That Insp Rept 50-482/98-16 Was Combined with Insp Rept 50-482/98-12,therefore,no Rept Will Be Issued for Rept 50-482/98-16 ML20196H3711998-12-0303 December 1998 Insp Rept 50-482/98-19 on 981002-1114.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Licensee Response to Road Closure Due to Flooding within 10-mile Emergency Zone Was Excellent PNO-IV-98-051, on 981102,flooding in Vicinity of Wolf Creek Generating Station Occurred.Licensee Has Been in Close Contact with Army Corps of Engineers,Region VII Ofc of Federal Emergency Mgt Agency Emergency Organizations1998-11-0505 November 1998 PNO-IV-98-051:on 981102,flooding in Vicinity of Wolf Creek Generating Station Occurred.Licensee Has Been in Close Contact with Army Corps of Engineers,Region VII Ofc of Federal Emergency Mgt Agency Emergency Organizations ML20155A1871998-10-22022 October 1998 Insp Rept 50-482/98-17 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Use of Fire Protection Sys Pumps for Purposes Other than Fire Protection Constituted Degradation of Sys IR 05000482/19980181998-10-0505 October 1998 Insp Rept 50-482/98-18 on 980921-25.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Assessment Aids,Communications & Security Program Plan & Procedures ML20154C7031998-09-29029 September 1998 Notice of Violations from Insp on 980323-0410 & 0622-25. Violations Noted:Without Prior Commission Approval & Without Performing Written Safety Evaluations,Licensee Made Changes Described in USAR Re Unreviewed Safety Question ML20154C7071998-09-29029 September 1998 Insp Rept 50-482/98-12 on 980323-0410 & 0622-25.Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000482/19980151998-09-0404 September 1998 Insp Rept 50-482/98-15 on 980712-0822.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20236T1461998-07-23023 July 1998 Insp Rept 50-482/98-14 on 980531-0711.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236T1431998-07-23023 July 1998 Notice of Violation from Insp on 980531-0711.Violation Noted:On 980604,technicians Placed Heavy Door & Frame in Control Room Equipment Cabinet Adjacent to Train a Protection Sys Logic Cabinets IR 05000482/19980131998-06-12012 June 1998 Insp Rept 50-482/98-13 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20249A0341998-06-12012 June 1998 Notice of Violation from Insp on 980419-0530.Violation Noted:On 980317,electricians Removed Breaker NG001AGF1 While Clearance Order 98-0250-EF Relied on Procedure Mge EOOP-11 to Establish Isolation of Breaker from Bus ML20248B6471998-05-27027 May 1998 Notice of Violation from NRC Investigation on 961224-980206. Violation Noted:On 961211,S Buehne Intentionally Submitted Info to Licensee Known to Be Inaccurate & Info Submitted to NRC ML20247Q3461998-05-22022 May 1998 SALP Rept 50-482/98-99 for Period 970406-980418 ML20216A8881998-05-0606 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:On 980410,an Accessible High Radiation Area on Radwaste Bldg Roof W/Dose Rate of Approx 400 Mr/H at 18 Inch Was Not Posted as High Radiation Area ML20216A9051998-05-0606 May 1998 Insp Rept 50-482/98-10 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217M3691998-04-30030 April 1998 Insp Rept 50-482/98-07 on 980330-0403.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20217E0851998-04-23023 April 1998 Notice of Violation from Insp on 970624-27.Violation Noted: Licensee Identified That Unauthorized Work, (Work Outside Scope of Assigned Work Package Tasks & Applicable Procedures) Performed & Not Documented ML20217M5291998-04-0202 April 1998 Notice of Violation from Insp on 980316-20.Violation Noted: Inspector Identified Seven Radioactive Matl Containers Located in Radwaste Storage Bldg ML20217M5491998-04-0202 April 1998 Insp Rept 50-482/98-11 on 980316-20.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Waste/Matls Transportation Programs IR 05000482/19980041998-04-0101 April 1998 Insp Rept 50-482/98-04 on 980125-0307.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217H6431998-04-0101 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:Operators Failed to Log Entry Into Action Statement for TS 3.1.3.5 Shutdown Rods Inserted Beyond Rod Insertion Limits IR 05000482/19980081998-03-30030 March 1998 Insp Rept 50-482/98-08 on 980302-06.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20216G5661998-03-13013 March 1998 Notice of Violation from Insp on 980223-27.Violation Noted: Proper Surveys Were Not Performed to Prevent Unconditional Release of Radioactive Matls Greater than Release Criteria ML20216G5761998-03-13013 March 1998 Insp Rept 50-482/98-09 on 980223-27.Violation Noted.Major Areas Inspected:Radiation Protection Program IR 05000482/19980021998-03-0606 March 1998 Insp Rept 50-482/98-02 on 980202-06.No Violations Noted. Major Areas Inspected:Maint,Engineering & Emergency Preparedness IR 05000482/19980061998-02-27027 February 1998 Insp Rept 50-482/98-06 on 980202-06.No Violations Noted. Major Areas Inspected:Review of Radiation Protection Program Activities ML20203K9181998-02-26026 February 1998 Insp Rept 50-482/98-03 on 980202-06.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Mgt Program,Training & Qualifications,Qa Oversight, Facilities & Equipment & Annual Repts ML20203K2831998-02-26026 February 1998 Insp Rept 50-482/98-301 on 980217.No Violations Noted.Major Areas Inspected:Operations,Including Evaluation of Competency of 2 Retake RO & 2 SRO Retake License Applicants for Issuance of Operating Licenses at Facility ML20203H5341998-02-23023 February 1998 Insp Rept 50-482/97-201 on 971103-980109.No Violations Noted.Major Areas Inspected:Capability of RHR & CCW Sys to Perform Safety Functions Required by Design Bases & Adherence of Sys to Design & Licensing Bases IR 05000482/19970211998-02-0909 February 1998 Insp Rept 50-482/97-21 Cancelled ML20199H9141998-01-29029 January 1998 Notice of Violation from Insp on 971214-980124.Violation Noted:Technicians Failed to Follow Procedure Steps by Removing Vendor Wire & Reversed Variable Transformer Leads IR 05000482/19970231998-01-29029 January 1998 Insp Rept 50-482/97-23 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-21
[Table view] |
Text
- . . . - - . - - _ _ . . . . _ -
' l l
.
l l
ENCLOSURE l U.S. NUCLEAR REGULATORY COMMISSION l REGION IV ]
i i
Docket No.: 50-482 ;
i
'
License No.: NPF-42 Report No.: 50-482/97-07 Licensee: Wolf Creek Nuclear Operating Corporation Facility: Wolf Creek Generating Station .;
i
~ Location: 1550 0xen Lane, NE i Burlington, Kansas l I
Dates: February 3-7,1997 i i
Inspector: D.' W. Schaefer, Security Specialist Plant Support Branch i l
Approved By: Blaine Murray, Chief, Plant Support Branch ;
Division of Reactor Safety j
.ti Attachment: Supplemental Information ,
i l
l
,
)
,
9703030120 970226 ,
'
PDR ADOCK 05000482 G pp
.,
.
.
2-EXECUTIVE SUMMARY l Wolf Creek Generating Station NRC Inspection Report 50-482/97-07 This routine announced inspection focused on the licensee's physical security progra The areas inspected included review of commitments in the Updated Final Safety Analysis Report, records and reports, testing and maintenance, assessment aids, detection aids - protected area, vital area barriers and detection aids, alarm stations, communications, compensatory measures, access control of personnel and vehicles, personnel training and qualification, management support, and security program audi Enaineerina
The Updated Final Safety Analysis Report was consistent with the observed plant physical security plan and procedures (Section E2).
Plant Suonort
A very good records and reports program was in place. The security staff was reporting security events correctly. A noncited violation was identified involving the failure of a security officer to secure a patrol vehicle parked inside the protected area (Section S1.1).
- An excellent testing and maintenance program was conducted and was documented. Timely repair of security equipment resulted in a low number of compensatory postings (Section S2.1).
Assessment aids provided excellent assessment of the perimeter detection zone Instrumentation and controls technicians provided excellent service support and repaired problems with closed circuit television cameras in a timely manner (Section S2.2).
A very good perimeter detection system was maintained. The perimeter detection system was properly performance tested. A high alarm rate was noted for three perimeter alarm zones (Section S2.3).
- The vital area barriers and detection system were in place and would be effective in
'
providing delay and detection during a penetration attempt. Additionally, the vital area barriers and detection system effectively limited access to only authorized l personnel (Section S2.4). '
- The alarm stations were redundant and well protected. The operators were alert and well trained (Section S2.5).
. I l
i
!
3-
, * A good security radio c ommunnation system was maintained. An adequate number l of portable radios were available for members of the security organization l (Section S2.6). l
'
- The compensatory measure s program was effectively implemented. The security procedure for compensatoi / measures met the requirements in the security plan, j
'
Security personnel were well trained on compensatory requirements (Section S4.1).
- A very good program for searching personnel and vehicles was maintained. A weakness identified involving one of the x-ray machines was corrected. A concern was identified involving the entry turnstiles (Section S4.2).
i * An effective security training program had been implemented. Medical )
examinations for security officers were thorough and well documented l
'
(Section S5.1).
- Senior management support for the security organization was strong. The security program was implemented by a well trained and highly qualified staff. The low morale of the security officers was attributed, in part, to the licensee's recent announcement to transition the majority of the security organization from a proprietary to a contract security force (Section S6.1).
I
- The 1996 audits of the security program were very good. A weakness was :
identified regarding three security program areas that were not included in the l audits (Section S7.1).
.
. . - . - - - - . - . . .
, .-
! -
'
l l -4- ;
! !
Report Details (
,
lli. Enaineerina E2 Review of Commitments in the Updated Final Safety Analysis !
i l A recent discovery of a licensee operating its facility in a manner contrary to the l Updated Final Safety Analysis Report description highlighted the need for a special I l focused review that compares plant practice procedures and/or parameters to the 1 Updated Final Safety Analysis Report description. While performing the inspection :
l discussed in this report, the inspector reviewed the applicable portions of the l Updated Final Safety Analysis Report that related to the areas inspected. The j
! inspector verified that the Updated Final Safety Analysis Report wording was consistent with the observed plant practice procedures and/or parameter l
+
IV. Plant Support t
'
S1 Conduct of Security and Safeguards Activities St.1 Records and Reports (81700-02.01) ;
l a. Inspection Scope i
!
l The inspector reviewed safeguards event logs and security incident reports to l determine compliance with the requirements of 10 CFR 73.21(b) and (c), j l 10 CFR 26.73, and the physical security plan, b. Observations and Findinas i
l l
The inspector reviewed the security event logs from April 1 through December 31, 1996. The records were available for review and maintained for the time required by regulations. The inspector determined that the licensee conformed to the regulatory requirements regarding the reporting of security events. The logs and
- incident reports were organized in numerical sequence and easy to audit. The '
l licensee's records included trending and analysis of problems with perimeter >
l intrusion detection equipment, closed circuit televisions, and inappropriate actions l (human errors). Trending was very goo * Unsecured Security Patrol Vehicle ;
!
Security incident Report 11-18-1971 identified that on November 17,1996, a security officer had left the passenger door of a security patrol vehicle unlocked. The unattended patrol vehicle had been parked inside the l protected area. Contents of the patrol vehicle included an AR-15 rifle with t 130 rounds of ammunition and a shotgun with 25 rounds of ammunition.
- The passenger door of the patrol vehicle remained unlocked for approximately 35 minutes. Another security officer discovered the unlocked
,
,
- - - m
__ l
. I
i l
- -5- i
'
' i vehicle, ir:ventoried its contents and accounted for all weapons, ammunition, !
and equipment.
-
License Condition 2.E of the Wolf Creek Generating Station Facility Operating
- License, as amended, dated June 4,1985, requires that the licensee fully
-
implement and maintain in effect all provisions of the Commission approved l . physical security plan.
!
Paragraph 1.2.2 of the physical security plan requires that all security duties i be performed in strict accord with approved security procedures.
d Paragraph 6.2.3.10 of Security Procedure SEC 01-103," Patrol Duties,"
, Revision 17, requires patrol officers utilizing vehicles containing weapons to
- ensure that the vehicle's windows are rolled up and the doors secured prior to leaving the vehicle unattende The f ailure of the security officer to secure a patrol vehicle is a violation of Security Procedure SEC 01-103. During the exit meeting on February 7, 1997, the inspector stated that this licensee identified event was significant in that it provided an opprs rtunity for a security officer to loose control of weapons and ammunition inside the protected area. This licensee identified and corrected violation is being treated as a noncited violation, consistent with Section Vll.B.1 of the NRC Enforcement Policy (50-482/9707-01) Conclusions A very good records and reports program was in place. The security staff was correctly reporting security events. A noncited violation was identified involving the failure of a security officer to secure a patrol vehicle parked inside the protected are S2 Status of Security Facilities and Equipment S2.1 Testino and Maintenance (81700-02.07) Inspection Scope The inspector reviewed the testing and maintenance program to determine compliance with the requirements of the security plan, Observations and Findinas The inspector determined through interviews with security officers and supervisors !
and a review of records that repairs to security equipment were completed in a j timely manner. The timely response to repair detection aids, access control equipment, and vital area door locks was instrumental in the extremely low number l of compensatory posting hours for security officer l
l l
~. --. -- -- - - - _ - . . - . _ - . - . - . - - - . . .- -
-
.
-6- .
The inspector determined through a review of records that licensee periodic tests ;
were conducted on the following: security computer, closed circuit television cameras and video capture alarm status check, on and off site communications, metal and explosive detectors, X-ray machines, perimeter microwave zones, vehicle barrier system, protected and vital area barriers and portals, protected area lighting,
warehouse fence, and security diesel generator.
d Conclusions
.
An excellent testing and maintenance program was being conducted and was
properly documented. Timely repair of security equipment resulted in a low number
. of compensatory posting hours for security officer S2.2 Assessment Aids (81700-02.06)
i Inspection Scope i
. The inspector reviewed the assessment aids to determine compliance with the physical security plan. The areas inspected included the closed circuit television i monitors located in the alarm station Observations and Findinas
, The inspector observed the assessment aids during the hours of daylight and darkness from February 4-5,1997, and determined that the licensee had an
, excellent assessment aids system. The fixed and pan-tilt-zoom closed circuit
- television cameras were placed to ensure effective coverage. Camera resolution j was excellent. Additionally, the inspector determined through interviews that
. instrumentation and controls technicians provided excellent service support.
l Operational problems with assessment equipment were corrected in a timely
manner.
- Conclusions Assessment aids provided excellent assessment of the perimeter detection zone Instrumentation and controls technicians provided excellent service support and routinely repaired problems with closed circuit television cameras in a timely manner.
S2.3 Detection Aids - Protected Area (81700-02.04)
'T Inspection Scoce
>
,
The licensee's protected area detection aids were inspected to deterrnine
- compliance with the requirements of the physical security plan. The areas i inspected included the detection systems' capabilities, zoning of the alarm systems,
! detection system security, and maintenance of the detection aids syste :
_ _ .- , _ . . _ -._ _ _ _ _ _ _ . _ _ _ . . - . _ _ _ _ _ . . . _ . . . _ _ . _ _ _ _ _
i w
i'.
4- l l -7- I y l Observations and Findinas
'
b.
The inspector discussed with members of the security force the procedures for conducting the 7-day test of the perimeter microwave system. The detection systems were well designed and maintained. The microwave heads presented a difficult problem for any intruder attempting to enter the plant undetected. The licensee's tests of the systems were performance oriented to ensure that system failures were identified and correcte The inspector noted that recent efforts to reduce the alarm rate for the perimeter intrusion detection system had some positive effect. However, three alarm zones continued to have a significantly higher alarm rat Conclusions A very good perimeter detection system was maintained. The perimeter detection system was performance tested weekly by security officers. A followup item was identified pertaining to the continued high alarm rate for three perimeter alarm zone S2.4 Vital Area Barriers and Detection Aids (81700-02.05) Insoection Scoce The inspector observed the licensee's vital area barriers and detection aids to determine compliance with the requirements of the physical security pla ! Observations and Findinas The inspector determined through observation that the vital areas were appropriately locked and alarmed and that the vital area barriers were adequate to ensure delay of a -'tential adversary, and to ensure that unescorted access was limited to author; _ personnel. The alarm system consisted of balanced magnetic switches at the entry points to the vital areas. The alarms annunciated in continuously manned alarm stations, the vital area door locking mechanisms and alarms were tested every 7 days for operability. Emergency exits from vital areas were locked and alarmed, Conclusions
' The vital area barriers and detection system were in place and would be effective in providing delay and detection during a penetration attempt. Additionally, the vital area barriers and detection system effectively limited access to only authorized personne _ _ - _ . _ _ _ _ . . _ _ _ _ . - . _ . - . . _ _ . _ _ ~ _ _ _ _ _ ._ _ _ _ _._-
i i
-
'
l t
ia .. ,
-
s l -8- {
! s
'
- S2.5 Alarm Stations (81700-02.06) Insoection Scope 4 i
,
The alarm stations were inspected to determine compliance with the requirements . j i of the security plan. The areas inspected included the requirements and i capabilities, redundancy and diversity of stations, protection of the alarm stations, !
and systems security.
,
I Observations and Findinas l The inspector confirmed the redundancy and diversity of the alarm stations. Action !
by one alarm station operator could not reduce the effectiveness of the security systems without the knowledge of the other alarm station operators. The central i alarm station and secondary alarm station were bullet resistant. The inspector asked questions of the station operators and determined that they were very effectively trained and knowledgeable of their dutie Conclusions
The alarm stations were redundant and well protected. The operators were alert j and well trained, s
S2.6 Communications (81700-02.06) ; Inspection Scoce The communication capabilities were inspected to determine compliance with the ,
'
requirements of the physical security plan. The areas inspected included the operability of radio and telephone systems and the capability to effectively communicate with the locallaw enforcement agencies through both of the system Observations and Findinas The inspector confirmed that the licensee had a very good radio and telephone systems capable of meeting all communication requirements of the security organization. The licensee maintained an adequate number of portable radios for use by members of the security organization. However, at times, the " fully charged" radio batteries provided only limited service before they were exchanged for another batter The licensee had approved the installation of a new 900 Mhz radio system at the plant. When installed, the security organization will operate a separate trunk system. Approximately 60-70 hand held multi-channel radios will be provided to the security organizatio .
<
- . _
!
-
i l
-9-l Conclusions 1 l
A good security radio communication system was maintained. An adequate number of portable radios was available for members of the security organizatio S4 Security and Safeguards Staff Knowledge and Performance
- S4.1 Comnensatorv Measures (81700-02.07) Inspection Scop _e The inspector reviewed the licensee's compensatory measures program to determine compliance with the requirements of the physical security plan. The areas inspected included deployment of compensatory measures and the effectiveness of those measure Observations and Findinas The inspector confirmed through a review of Security Procedure SEC 50-130, ;
" Compensatory Requirements," that the licensee deployed compensatory measures j
. in a manner consistent with the requirements in the security plan. The inspector determined through interviews of security personnel that the security personnel i
'
available for assignment to compensatory security posts were properly trained for ,
those dutie l
~
The compensatory measures program was effectively implemented. The security procedure for compensatory measures met the requirements in the security pla Security personnel were well trained on the program requirement S4.2 Access Control of Personnel and Vehicles _J81700-02.05) i inspection Scope The access control program for personnel and vehicles was inspected to determine compliance with the requirements of the security plan, Observations and Findinos The inspector determined through observations at the security building entrance and at the vehicle sallyport that the licensee properly controlled personnel access to the protected area. The protected area access control equipment was inspected and found to be functional and well maintained except as noted below. The inspector observed the x-ray machine search of hand-carried packages at the security building. The operators were efficient and well trained. However, the inspector identified the following concerns in the access control program:
!
. ;
I
- 10- !
(1) Entrance Turnstiles '!
I The inspector observed the licensee test the turnstile at the entrance to the i protected area. During these tests, the licensee determined that multiple I successive insertions of a security badge into the entrance card readers 'i unlocked the turnstile allowing entry each time into the protected are .
The inspector stated that, although not governed by regulatory requirements, l an improved method of controlling personnel access to the protected area l would allow only one insertion of a security badge to unlock an entry turnstile. A second successive badge insertion to enter the protected area would cause an alarm. As currently designed, the badge readers at the entrance turnstiles would allow an authorized employee to grant protected area access to an unauthorized individua The licensee's configuration of the security building partially mitigates the concern with the turnstiles. As designed, security personnel inside the secondary alarm station are capable of continuously observing employees (and the card readers) as they utilize the turnstiles to enter the plant protected area. The inspector discussed this concern during the exit meeting on February 7,1997, and stated that the licensee's turnstile system satisfied regulatory requirement (2) X-rav Machines The inspector observed the licensee conduct limited testing of the two x-ray machines in the security building. During these tests, it was determined that the monitors for one of the x-ray machines were not showing a complete side-to-side view of items passed through the x-ray tunnel. As a result, J portions of objects passed along the extreme edges of the x-ray belt and the area between the belt and the side of the x-ray tunnel could not be viewed by the machine operator. Specifically, the inspector observed that, whenever an object was passed through one of the x-ray machines along one of the outer edges, approximately 2-1/2 inches of the object could not .
be viewed on either the color or the black and white x-ray machine monito Information Notice 90-67, " Potential Security Equipment Weaknesses,"
dated October 29,1990, specifically informed licensees of similar weaknesses in x-ray machine Prior to the end of the inspection, the licensee had adequately adjusted the x-ray machine to allow for complete viewing of all objects passed through the x-ray tunnel. Additionally, during the inspection, the licensee stated that j
~
plant procedures would be modified to provide for similar periodic testing of all x-ray machine l i
i
, - - - _ _ , - - _ . - - - , - - - , - . . . - - - _ . - . . - - , - - - - - . _--
_ _ . - _ - - -. . _ _ _ _ _ _ _ . _ . _ _ _ _ __. _ _ . _ _ _ _ _ _ _ ._ ___
,
j $
t . ,
- i
- -11 - ,
.:
l Conclusions l
1 A very good program for searching personnel and vehicles was maintained. A ,
I weakness identified and corrected regarding one of the x-ray machines was ;
i corrected. A concern was identified in the entry turnstile !
l
S5 Security and Safeguards Staff Tra.ning and Qualification !
a
I S S.1 Personnel Trainina and Qualification (81700-02.08) Insoection Scope
- The inspector reviewed the licensee's security training and qualification program to determine adequacy and compliance with the requirements of the training and j qualification plan and the contingency plan.
! Observations and Findinas l'
j The security organization conducted all required training in accordance with ;ts
! approved security, training, and contingency plans. The inspector confirmed, by a j review of the composite security training records, that the required training was conducted every 12 month The inspector observed security officers during the performance of their duties. All security officers displayed excellent conduct, and knowledge of the procedural requirement * Medical Examinations The inspector reviewed medical examination records for five armed security officers and one (unarmed) security watchman. The medical records were complete and indicated that the required annual medical examinations were thorough and conducted in a timely manner. The results of the medical examinations were properly documente The inspector identified two armed security officers that had been granted medical waivers in accordance with the above paragraph. The corrected distance vision in the "other" eye for an officer was 20/100(as opposed to the required maximum of 20/40), and the hearing loss at 2,000 Hz for another officer was 60 decibels (as opposed to the maximum of 40 decibels).
Paragraph 2.3.1 of the licensee's Training and Qualification Plan requires, in ;
part, that distant visual acuity for armed security individuals shall be i correctable to 20/30in the better eye and 20/40in the other eye with corrective lenses. Additionally, this paragraph also requires that the hearing for armed individuals (at 500 Hz,1,000 Hz, and 2,000 Hz) shall have no hearing loss greater than 40 decibels at any one frequency. Further, this ,
!
-. .- _ - - - -- - --
. . _.___ . . - _ _ _ , _ _ . _ _ _ _ _ -.- ._ _ ._. ~ .__
,.
- i
.
.
}
, -12-
, paragraph provides that exceptions to vision and hearing requirements may i be allowed on a case-by-case basis when it is shown that overall assigned ;
-
security duties can be completed by the individua I I
During the exit meeting on February 7,1997, the inspector stated that, while j the above two security officers did not meet the above specific vision and j hearing requirements (nor the specific vision and hearing requirements of 10 l 4'
CFR 73.55, Appendix B), these officers had been determined by the plant medical staff to be capable of performing overall assigned security duties and had been properly granted an exception by the security superintendent.
J 4 Conclusions i
, An effective security training program had been implemented. Medical
- . examinations for security officers were thorough and well documented.
S6 Security Organization and Administration
'
S6.1 Manaaement Sucoort (81700-02.01)
- Insoection Scope
)i The effectiveness and adequacy of management support was inspected to l
<
determine the degree of management support for the physical security progra j i Observations and Findinas i
The inspector determined by discussions with security force personnel that the
'
security program received strong support from senior management. The inspector
!
determined that the security program was implemented by a well trained and highly qualified security staff. All members of the security organization had a clear understanding of their duties and responsibilities, however, the morale of the security officers remained relatively low. The licensee attributed this low morale to :
the past plant hiring freeze and the current plan to transition the majority of the !
security organization from a proprietary security force to a contract security I compan l l
On January 8,1997, the licensee announced that, based upon a recent " business ;
decision," during the next 2 years, portions of the proprietary security force would l be transitioned to a contract security company. This announcement indicated that the . security superintendent, the security administrative staff, the security training ;
and compliance sections, and shift lieutenants would remain employed by the plan {
The remaining security sergeants, security officers, and watchmen would be transitioned to the contract security compan '
The security officers stated to the inspector that the security superintendent had l recently provided written answers to several questions regarding their transition to a security contract compan l l
t u -
, ,
_ _ . . . . . _ _ . _ _ _ . . . - _ . _ . - - _ _ . _ . _ . _ . _ . _ . _ _ . _ . _ . _ _ _ . .
- .,
!
.
! -13-
< Conclusions i
Senior management support for the security organization was strong. The security
} program was implemented by a well trained and highly qualified staff. The low
'
morale of the security officers was attributed, in part, to the licensee's recent l announcement to transition the majority of the security force from a proprietary
security force to a contract security company.
!
S Quality Assurance in Security and Safeguards Activities l
~
S7.1 Security Proaram Audit (81700 02.01) insoection Scope The audits of the security program were inspected to determine compliance with the requirements of 10 CFR 50.54(p), the physical security plan, and Technical Specification 6.5.2. Observation and Findinas The inspector confirmed that security program audits had been conducted at least every 12 months as required. The inspector reviewed Quality Evaluations Audit Reports listed in the attachment. The inspector interviewed audit personnel and confirmed that they were independent of plant security management and plant security management supervision. Additionally, the inspector reviewed Self Assessment Reports and Surveillance Reports listed in the attachmen During the exit meeting on February 7,1997, the inspector stated that three areas of the overall security program had not been included in the audits. These areas included: protected and vital area detection aids, assessment aids, and communications. The inspector did not identify any specific violations of regulatory requirements, but this observation is considered a weakness in the licensee's overall audit of the security program, Conclusions Individually, the 1996 audits of the security program were adequate. A weakness was identified regarding three security program areas that were not included in the audit V. Manaaement Meetinas X1 Exit Meeting Summary The inspector presented the inspection results to members of licensee management at the conclusion of the inspection on February 7,1997. The licensee acknowledged the findings presente I l
- _ . - - . . - ~ ~ _ - - _ . - . - . - _ . _ . - . . . . - _ . - . - . - - . - _ .
,,
l
,
,.- .;
le i
! i ATTACHMENT *
i i l PARTIAL LIST OF PERSONS CONTACTED l ' Licensee i i
j J. Birk, Specialist, Access Screening i
'
l G. Burchart, Manager, Human Resources L T, Damashek, Supervisor, Licensing l
D. Erbe, Supervisor, Security Operations l R.' Flannigan, Manager, Nuclear Engineering Safety and Licensing C. Fowler, Manager, Integrated Plant Scheduling J. Johnson, Superintendent, Security S. Koenig, Supervisor, Quality Evaluations l M. Lutz, Coordinator, Security Administration O. Maynard, President and Chief Executive Officer B. McKinney, Plant Manager W. Norton, Manager, Performance improvement and Assessment
! P. O'Connor, Specialist, Access Screening C. Reekie, Engineering Specialist 111, Licensing E. Schmotzer, Manager, Purchasing and Material Services C. Younie, Manager, Operations NRC F. Ringwald, Senior Resident inspector INSPECTION PROCEDURES USED IP 81700 Physical Security Program for Power Reactors l
LIST OF ITEMS OPENED AND CLOSED Open
i 50-482/9707-01 NCV Failure to Lock Security Patrol Vehicle j Closed i 50-482/9707-01 NCV Failure to Lock Security Patrol Vehicle
!
I i
i
1 l
f I
l
!
<
I
-. .
- __ _ ._- ._ _ , . _ _ . -
_ -.
Y
.
n
. 1
I l-2- l LIST OF DOCUMENTS REVIEWED Security event logs from April 1 through December 31,1996, and miscellaneous security incident reports Wolf Creek Plant Procedurec: l AP 27-004 Controlling Safeguards Information, Revision 1 AP 27-005, Cargo Search, Revision 2 SEC 01-108, Security System Performance Testing, Revision 41 SEC 01-402, Security Personnel Training and Qualification, Revision 13 l SEC 50-130, Compensatory Requirements, Revision 35
Wolf Creek Plant Access Training, ACAD 93-009, Revision 27 (partial)
Surveillance Reports:
Controlling Safeguards information, January 16,1996 )
Security Contingency Drills, January 24,1996
.
Self Assessment Reports:
I SEL 96-019, Material / Cargo Entry, May 1,1996 SEP 96-020, Key Issue and Control, August 23,1996
)
. Quality Evaluations Audit Reports:
Security and Visitor Control, August 6,1996
- Fitness For Duty and Access Control, September 10,1996 Security Officer Training Records (composite listing)
Background investigation (file) Records for Four Individuals Granted Unescorted Access Authorization to the Protected Area Medical Records for Six Members of the Security Organization Security System Testing Logs for 1996 (partial) Regarding: Detection Probability, Manholes, Passive Barrier Tests, Shift Device Tests, Weekly Device Tests, and Visual Alarm Displays