IR 05000458/1985058
| ML20134M517 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 08/23/1985 |
| From: | Bennett W, Bess J, Bundy H, Craig Harbuck, Harrell P, Hunnicutt D, Jaudon J, Murray B, Nicholas J, Will Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20134M506 | List: |
| References | |
| 50-458-85-58, NUDOCS 8509040153 | |
| Download: ML20134M517 (6) | |
Text
.
.
APPENDIX U. S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report:
50-458/85-58 License:
CPPR-145
'
Docket:
50-458 Licensee: Gulf States Utilities (GSU)
P. O. Box 2951 Beaumont, Texas 77704 Facility Name:
River Bend Station Inspection At:
River Bend Site, St. Francisville, Louisiana Inspection Conducted:
July 22-26, 1985 f
Inspectors:
. [. M 8U!B5
[/.E. Bess,ReactorInspector,EngineeringSection Date /
Reactor Safety Branch (RSB)
i1^
SE R[ BerfleTf., Reactor Inspector, Project Section A Date eacter R.roject Branch (RPB)
hN wtm&
S 'b3lTS
- ' H. F. Bundy, Reactor Inspector, Project Section C Date '
Reactor Project Branch (RPB)
,
/L, fn 1R H rreII, Resident Inspector, Arkansas Date
'
~
,
kDjO 53 850829 O
0CK 050004 g PD
'
}
t-w-m
- ,,-
p
-2-
.
h! hh>0nY It'/2-W D. M. Hunnicutt, Chief, Operations Section D~ ate /
RSB
/A,
- b
7 arbyt:k,7rojedLInsp~ector, Project Ddte S h t on O RPB Yh&
8/22fd95'
-
VJ. 8. Nicholas, Senior Radiation Specialist Date Facilities Radiological Protection Section h!
vnN aW 13l85 D' ate /
j)'W.F. Smith,ResidentInspector,ComanchePeak Steam Electric Station Accompanying Personnel:
W. C. Banister, Consultant K. A. Ward, Consul nt F. P.
rake, Co u ant (July 23-26, 1985)
Approved:
If
,
,
J/ P.fJaudo, Chief, P g ect Section A, Reactor Dite f Pr< jects ranch
'
b 'C
/Xt!k
8/2z
't '
B. Murray, Chief, Facilities Radiological Date
'
Protection Section Inspection Summary j
Inspection Conducted July 22-26, 1985 (Report 50-458/85-58)
Areas Inspected:
Routine, announced inspection of Technical Specifications and implementing procedures.
The inspection involved 326 inspector-hours onsite by eight NRC inspectors and three NRC consultants.
Results: Within the one area inspected, no violations or deviations were identified.
_.
.
.
-3-
DETAILS 1.
Persons Contacted Gulf-States Utilities (CSU)
W. J. Cahill, Jr., Senior Vice President
- J. Deddens, Vice President, RBNG
- D. R. Girson, Assistant Plant Manager, Operations, Chemistry, Radwaste
- G. R. Kimmell, Supervisor, Operations Quality Assurance (QA)
- G. V. King, Plant Services Supervisor
- T. F. Plunkett, Plant Manager
- J. E. Spivey, QA Engineer
- R. B. Stafford, Director, Quality Services
- P. D. Grahan, Assistant Plant Manager, Technical Services
<
Nuclear Engineering Services (NES)
- J. M. Albert, Assistant Project Manager
- J. B. Warner, Project Manager The NRC inspectors also contacted other licensee personnel including administrative, clerical, maintenance, operations, and technical personnel.
- Indicates attendance at exit interview on July 26, 1985.
2.
Applicant Action on Previous Inspection Findings (Closed) Violation (8520-01):
Inadequate Operating Procedures -
Corrective action consisted of continuing efforts to "walkdown" procedures to identify and resolve deficiencies and to continuing procedure review concerning attention to detail.
The NRC inspectors reviewed numerous operating procedures and determined that operating procedures are now satisfactory.
This item is considered closed.
3.
Technical Specifications and Implementing Procedures The objective of this follow-up inspection to the NRC inspection conducted April 29 through May 3, 1985, (NRC Inspection Report 50-458/85-35) was to determine whether the final draft Technical Specifications (TS) dated May-June 1985, are adequate, address the applicant's facility, are appli-cable to NRC inspection and enforcement requirements, and that the TS will be properly implemented through the approved facility procedures.
The applicant's readiness to implement the TS was assessed.
-
-
-
- - - -
- -
-
-
-
- -
.
.-.
-.
.
-
.
-
--
-
..
.
. -.
. _..
-
-
-
.
...
_.
--
.
_
- .
.
4..
.
<
.
i r
The NRC inspectors and consultants reviewed the specific inspection
'
findings documented on the' data sheets attached to NRC Inspection Report 50-458/85-35 and numbered 001 through 422.
The NRC inspectors review of these 422 data. sheets and supporting applicant procedures
resulted in ~the closure of. 398 of the open items.
In addition, five new open items were identified. '-For clarification and record purposes all 422
~
open items, as identified by the 8535-xxx data sheets are closed. The 24 items that remained open are reopened in this inspection report and have
been assigned identification numbers.
The five open items. identified during the inspection are also incorporated in the open item list.
The
'
open items are:
Reference
'
Open Item IR 50-458/8535-Applicant TS Paragraph
^
50-458/8558-(Closed)
Reference No.
Number (Ref. )-01-051 & -052 A-45 4.3.2.1 i
j-02-110, -111, & -112 A-128 4.4.3.1(a)
- -03-113 & -114 A-130 4.4.3.1(b)
l-04-135 A-152 & 153 ECCS/RCIC-05-136 A-154 & 155 ECCS/RCIC-06-146 & 147 A-183 4.6.1.2-07-206 A-236 4.6.3.2.c
,-08-210 A-242 4.6.4.2
,-09-230 A-262 4.6.5.4.d.4 f-10-266 A-305 4.7.3.c.1
-11-303 A-348 4.7.9.b.2 j-12-319 A-364 4.8.1.1.2.f.2-13-322 A-366
'4. ;8.1.1. 2. f. 3 i
I.-14-327
~A-368 4.8.1.1.2.f.4 1-
-15-328 A-370 4.8.1.1.2.f.5-16-329 A-372, 4.'8.1.1. 2. f. 6
-
L W'
J f '
s e
,
.
-, - -
, -. -
.
)
-
,. - y4.
-.
y o
_.
.y
., - -
,
,-,.*,-.,m,-
,
y
,-n
.
,
.
-5-
.-17-330 A-372 4.8.1.1.2.f.6-18-333 A-374 4.8.1.1.2.f.7-19-334 A-377 4.8.1.1.2.f.8-20-336 A-379 4.8.1.1.2.f.9-21-337 A-379 4.8.1.1.2.f.9-22-338 A-381 4.8.1.1.2.f.10-23-340 A-383 4.8.1.1.2.f.11-24-341 A-383 4.8.1.1.2.f.11 4.
Open Items Not Previously Identified The NRC inspectors identified five items that had not been previously identified.
The open items are listed as follows:
NRC Inspection Report Open Item No.
Description 50-458/8558-25 Procedure STP-051-4228.
Set point does not agree with TS requirement.
-26 Changes to TS have not been implemented into Sur-veillance Test Procedures (STP).
A total of 17 STP are affected by these changes.
-27 Procedure STP-051-4201.
Changes to TS have not been implemented into STP.
-28 Procedure STP-055-0101 (dated 7/22/85) is not responsive to TS 4.9.12.4.
The STP does not verify that the access interlocks and palm switches in certain locations are operable, as required.
-29 ANSI N45.2.1-1973 requires that cleanness inspec-tion be qualified.
Procedure GMP-0062 is not clear on what qualifications inspectors should meet and who (by title) should sign (verify) inspections.
5.
Data Sheet Attachment Reviews The NRC inspectors reviewed the Data Sheet attachments for continuity.
One item, applicant reference number A-294, was inadvertently not assigned an "Open Item" number when NRC Inspection Report (IR 50-458/8535) was issued.
This item was followup inspected, found acceptable, and the item was close.
..
-6-6.
Walk down af Selected Procedures The NRC inspectors performed walk downs of selected procedures. These walk downs verified that the applicant's procedures had been evaluated and
-
reviewed, walked down, and corrected, as necessary, to assure agreement between the applicant's procedures.and appropriate TS requirements.
The walk downs by NRC inspectors did not identify any significant deficiencies.
between the TS and procedures.
17.
Exit Interview An exit interview was conducted on July 26,1985,' with those personnel denoted in paragraph 1.
The NRC senior resident inspector attended this meeting. The NRC inspectors sunnarized the purpose, scope, and findings of the inspection at this meeting.
e k