Insp Rept 99901308/96-01 on 961202-06.Violation & Noncomformance Noted.Major Areas Inspected:Activities Associated W/Implementation of Selected Portions of E&W QA Program & Monitoring Control of QualityML20134K414 |
Person / Time |
---|
Issue date: |
02/10/1997 |
---|
From: |
NRC (Affiliation Not Assigned) |
---|
To: |
|
---|
Shared Package |
---|
ML20134K407 |
List: |
---|
References |
---|
REF-QA-99901308 99901308-96-01, 99901308-96-1, NUDOCS 9702130295 |
Download: ML20134K414 (8) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000027/19992011999-10-0606 October 1999 Insp Rept 50-027/99-201 on 990817-20.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions Programs ML20212L2831999-10-0404 October 1999 Insp Rept 99901341/99-201 on 990816-20.Non Compliance Noted. Major Areas Inspected:Tva Central Labs & Field Testing Svcs Activities for Calibration of Measuring & Test Equipment & Activities Re Metallurgical Testing & Matl Failure Analysis IR 05000146/19992021999-10-0404 October 1999 Insp Rept 50-146/99-202 on 990830-0902.No Violations Noted. Major Areas Inspected:Onsite Review of Selected Aspects of Organizational Structure & Functions Program,Emergency Preparedness,Fire Protection Program & Facility Inspections IR 05000188/19992011999-09-24024 September 1999 Insp Rept 50-188/99-201 on 990830-0902.No Violations Noted. Major Areas Inspected:Review of Selected Aspects of Operations Program,Organizational Structure & Functions Program,Design Control Program & Review & Audit Program ML20211N6411999-09-0808 September 1999 Insp Rept 99900401-201 on 990330-0701.Noncompliance Noted. Major Areas Inspected:Quality Assurance Program IR 05000228/19992011999-09-0202 September 1999 Insp Rept 50-228/99-201 on 990816-19.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Was on-site Review of Selected Aspects of Licensee Class II non-power Reactor Operation IR 05000116/19992011999-09-0101 September 1999 Insp Rept 50-116/99-201 on 990810-12.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Operations,Design Control,Review & Audit,Environ Protection, Radiation Protection Operator Requalification & Maint IR 05000160/19992031999-08-30030 August 1999 Insp Rept 50-160/99-203 on 990119-21.No Violations Noted. Major Areas Inspected:Organization & Staffing & Proposed Decommissioning Activities IR 05000057/19992011999-08-19019 August 1999 Insp Rept 50-057/99-201 on 990802-04.Violations Noted. Major Areas Inspected:Review of Selected Aspects of Organizational Structure & Functions Program,Radiation Protection Program & Surveillance Program IR 05000274/19992011999-08-16016 August 1999 Insp Rept 50-274/99-201 on 990713-16.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Experiments,Operations,Fuel Handling,Safeguards,Procedures, Operator Requalification,Review & Audit & Surveillance IR 05000264/19992011999-08-10010 August 1999 Insp Rept 50-264/99-201 on 990712-15.No Violations Noted. Major Areas Inspected:Operations Program,Organizational Structure & Functions Program,Design Control Program,Review & Audit Program & Radiation Protection Program ML20210L7211999-08-0505 August 1999 Insp Rept 99900403/99-201 on 990720.No Violations or Deviations/Noncompliance Noted.Major Areas Inspected: Documentation Re Fabrication of Reactor Pressure Vessel Surveillance Specimens & Surveillance Capsules IR 05000097/19992011999-08-0404 August 1999 Insp Repts 50-097/99-201 & 50-157/99-201 on 990426-30.No Violations Noted.Major Areas Inspected:Onsite Review of Selected Aspects of Operations Program,Organizational Structure & Review & Audit Program IR 05000020/19992011999-07-30030 July 1999 Insp Rept 50-020/99-201 on 990628-0701.No Violations Noted. Major Areas Inspected:Announced Insp Included Onsite Review Selected Aspects of Design Change Functions Program, Radiation Protection Program IR 05000128/19992011999-07-0909 July 1999 Insp Rept 50-128/99-201 on 990608-10.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of C/A Previously Committed to by Licensee IR 05000070/19992011999-07-0101 July 1999 Insp Repts 50-070/99-201,50-073/99-201 & 50-183/99-201 on 990607-10.No Violations Noted.Major Areas Inspected: Operation Program,Organizational Structure & Functions Program IR 05000186/19992011999-07-0101 July 1999 Insp Rept 50-186/99-201 on 990607-11.Violations Noted.Major Areas Inspected:Operations Program,Organizational Structure & Functions Program,Design Control Program,Review & Audit Program,Fuel Handling Program & Experimental Program IR 05000166/19992011999-06-14014 June 1999 Insp Rept 50-166/99-201 on 990517-20.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Operations,Review & Audit Program,Rp Program,Operator Requalification Program,Surveillance Program & Experiments IR 05000336/19982191999-06-10010 June 1999 Insp Rept 50-336/98-219 on 981214-18,990126-29,0208-19 & 0301-05.Noncited Violations Identified.Major Areas Inspected:Exam of Licensee Corrective Action Implementation IR 05000123/19992011999-06-0909 June 1999 Insp Rept 50-123/99-201 on 990517-20.No Violations Noted. Major Areas Inspected:Review of Selected Aspects of Operations Program,Organizational Structure & Functions Program,Design & Control Program & Review & Audit Program IR 05000113/19992011999-06-0909 June 1999 Insp Rept 50-113/99-201 on 990504-07.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of C/A Previously Committed to by Licensee & Discussions with Personnel IR 05000243/19992011999-06-0707 June 1999 Insp Rept 50-243/99-201 on 990510-13.No Violations Noted. Major Areas Inspected:Onsite Review of Selected Aspects of Organizational Structure,Review & Audit Program,Radiation Protection Program,Safeguards Program & Security Program IR 05000607/19992011999-06-0303 June 1999 Insp Rept 50-607/99-201 on 990330-0401.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000002/19992011999-05-27027 May 1999 Insp Rept 50-002/99-201 on 990503-06.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Operations,Design Control,Review & Audit,Operator Requalification,Maint,Surveillance & Procedures IR 05000182/19992011999-05-0606 May 1999 Insp Rept 50-182/99-201 on 990412-15.No Violations Noted. Major Areas Inspected:Operations,Organizational Structure & Functions,Design Control,Review & Audit,Radiation Protection & Environ Protection Programs ML20206M8571999-05-0606 May 1999 Insp Rept 99901339/99-201 on 990405-06.No Violations or Deviations Noted.Major Areas Inspected:Procedures & Representative Records,Interviewed Personnel & Observed Activities IR 05000062/19992011999-05-0606 May 1999 Insp Rept 50-062/99-201 on 990414-16.No Violations Noted. Major Areas Inspected:Radiation Protection & Transportation IR 05000005/19992011999-04-22022 April 1999 Insp Rept 50-005/99-201 on 990322-26.No Violations Noted. Major Areas Inspected:Selected Aspects of Operations Program,Physical Security Program,Radiation Protection Program & Operator Requalification Program ML20205R3271999-04-21021 April 1999 Insp Rept 99900003/99-201 on 990322-25.Violations Noted. Major Areas Inspected:Activities Related to Manufacture & Testing of Nuclear Fuel & Related Components IR 05000193/19992011999-04-0707 April 1999 Insp Rept 50-193/99-201 on 990322-26.No Violations Noted. Major Areas Inspected:Licensee Programs Re Operations,Health Physics & Security IR 05000131/19992011999-04-0707 April 1999 Insp Rept 50-131/99-201 on 990315-17.No Violations Noted. Major Areas Inspected:Organization,Operations & Maint IR 05000326/19992011999-03-25025 March 1999 Insp Rept 50-326/99-201 on 990223-25.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000146/19992011999-03-22022 March 1999 Insp Rept 50-146/99-201 on 990216-18.No Violations Noted. Major Areas Inspected:Plant Status,Including Dismantlement Activities,Odcm & Calibr of Effluent Radiation Monitoring Sys & Flow Rate Monitors IR 05000284/19992011999-03-12012 March 1999 Insp Rept 50-284/99-201 on 990302-04.No Violations Noted. Major Areas Inspected:Review of Various Aspects of Licensee Programs Re Conduct of Operations & Emergency Preparedness IR 05000022/19992011999-03-0505 March 1999 Insp Rept 50-022/99-201 on 990201-03.No Violations Noted. Major Areas Inspected:Various Aspects of Reactor Operations, Maint,Safety & Emergency Preparedness Program IR 05000150/19992011999-03-0404 March 1999 Insp Rept 50-150/99-201n on 990208-12.No Violations Noted. Major Areas Inspected:Aspects of Organization,Periodic & Special Repts,Operations,Maint,Operations & Maint Procedures,Requalification Training & EP IR 05000297/19992011999-03-0202 March 1999 Insp Rept 50-297/99-201 on 990209-12.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Included Onsite Review of Various Aspects of Licensee Programs Concerning Conduct of Operations & Emergency Preparedness IR 05000602/19982011999-03-0202 March 1999 Insp Rept 50-602/98-201 on 981207-11.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of C/A Previously Committed to by Licensee IR 05000288/19992011999-02-0909 February 1999 Insp Rept 50-288/99-201 on 990125-28.No Violations Noted. Major Areas Inspected:Conduct of Operations & Emergency Preparedness IR 05000020/19982031999-02-0101 February 1999 Insp Rept 50-020/98-203 on 981207-10.No Violations Noted. Major Areas Inspected:Radiological Control During Major Facility Mod Projects IR 05000245/19982171999-01-22022 January 1999 Evaluation Repts 50-245/98-217,50-336/98-217 & 50-423/98-217 Conducted on 981026-30.Areas Evaluated:Whether NNECO Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ ML20199L7031999-01-22022 January 1999 Insp Rept 99901043/98-01 on 981014-15 & 1028-29. Noncompliance Noted.Major Areas Inspected:Insp Testing & Repair/Rework of Six 4.16-kV W Type 50DHP350,1200-ampere, Circuit Breakers of Ten Recently Built IR 05000243/19982021999-01-0404 January 1999 Insp Rept 50-243/98-202 on 981130-1203.No Violations Noted. Major Areas Inspected:Onsite Review of Various Aspects of Licensee Programs Concerning Conduct of Operations & EP ML20198E7611998-12-22022 December 1998 Insp Rept 99901336/98-01 on 981123-25.No Violations Noted. Major Areas Inspected:Performance Based Insp of Activities at Facility in Warrington,Pa IR 05000186/19982021998-12-21021 December 1998 Insp Rept 50-186/98-202 on 981116-20.No Violations Noted. Major Areas Inspected:Rp,Environ Monitoring,Transportation Activities,Physical Security,Matl Control & Accountability, Inspector Identified Violation Follow Up & Event Repts IR 05000146/19982041998-12-16016 December 1998 Insp Rept 50-146/98-204 on 981013-1106.No Violations Noted. Major Areas Inspected:Large Component Removal Project ML20198A8211998-12-14014 December 1998 Insp Rept 99900104/98-01 on 980921-25 & 1116-17. Noncompliance Noted.Major Areas Inspected:Conformance of Fabrication & Exam Activities of Nrc,Asme Code & Customer Requirements ML20197H6051998-12-0909 December 1998 Insp Rept 50-062/98-202 on 981116-19.Violations Noted. Major Areas Inspected:Review of Selected Aspects of Licensee Organization,Operations & Maintenance Activities,Safegurads & Security Program & Matl Control & Accounting Program IR 05000128/19972011998-12-0808 December 1998 Insp Rept 50-128/97-201 on 971103-05 & 981102-05.No Significant Safety Issues Were Identified.Major Areas Inspected:Selected Conditions & Records Since Last Insp, Verification of C/As & Actions Re Reportable Occurences IR 05000228/19982011998-12-0202 December 1998 Insp Rept 50-228/98-201 on 981102-05.Violations Noted.Major Areas inspected:on-site Review of Selected Aspects of Licensees Class II non-power Reactor Operation Including Organization & Staffing & Review & Audit Functions 1999-09-08
[Table view]Some use of "" in your query was not closed by a matching "". Category:NRC-GENERATED
MONTHYEARIR 05000027/19992011999-10-0606 October 1999 Insp Rept 50-027/99-201 on 990817-20.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions Programs ML20212L2831999-10-0404 October 1999 Insp Rept 99901341/99-201 on 990816-20.Non Compliance Noted. Major Areas Inspected:Tva Central Labs & Field Testing Svcs Activities for Calibration of Measuring & Test Equipment & Activities Re Metallurgical Testing & Matl Failure Analysis IR 05000146/19992021999-10-0404 October 1999 Insp Rept 50-146/99-202 on 990830-0902.No Violations Noted. Major Areas Inspected:Onsite Review of Selected Aspects of Organizational Structure & Functions Program,Emergency Preparedness,Fire Protection Program & Facility Inspections IR 05000188/19992011999-09-24024 September 1999 Insp Rept 50-188/99-201 on 990830-0902.No Violations Noted. Major Areas Inspected:Review of Selected Aspects of Operations Program,Organizational Structure & Functions Program,Design Control Program & Review & Audit Program ML20211N6411999-09-0808 September 1999 Insp Rept 99900401-201 on 990330-0701.Noncompliance Noted. Major Areas Inspected:Quality Assurance Program IR 05000228/19992011999-09-0202 September 1999 Insp Rept 50-228/99-201 on 990816-19.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Was on-site Review of Selected Aspects of Licensee Class II non-power Reactor Operation IR 05000116/19992011999-09-0101 September 1999 Insp Rept 50-116/99-201 on 990810-12.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Operations,Design Control,Review & Audit,Environ Protection, Radiation Protection Operator Requalification & Maint IR 05000160/19992031999-08-30030 August 1999 Insp Rept 50-160/99-203 on 990119-21.No Violations Noted. Major Areas Inspected:Organization & Staffing & Proposed Decommissioning Activities IR 05000057/19992011999-08-19019 August 1999 Insp Rept 50-057/99-201 on 990802-04.Violations Noted. Major Areas Inspected:Review of Selected Aspects of Organizational Structure & Functions Program,Radiation Protection Program & Surveillance Program IR 05000274/19992011999-08-16016 August 1999 Insp Rept 50-274/99-201 on 990713-16.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Experiments,Operations,Fuel Handling,Safeguards,Procedures, Operator Requalification,Review & Audit & Surveillance IR 05000264/19992011999-08-10010 August 1999 Insp Rept 50-264/99-201 on 990712-15.No Violations Noted. Major Areas Inspected:Operations Program,Organizational Structure & Functions Program,Design Control Program,Review & Audit Program & Radiation Protection Program ML20210L7211999-08-0505 August 1999 Insp Rept 99900403/99-201 on 990720.No Violations or Deviations/Noncompliance Noted.Major Areas Inspected: Documentation Re Fabrication of Reactor Pressure Vessel Surveillance Specimens & Surveillance Capsules IR 05000097/19992011999-08-0404 August 1999 Insp Repts 50-097/99-201 & 50-157/99-201 on 990426-30.No Violations Noted.Major Areas Inspected:Onsite Review of Selected Aspects of Operations Program,Organizational Structure & Review & Audit Program IR 05000020/19992011999-07-30030 July 1999 Insp Rept 50-020/99-201 on 990628-0701.No Violations Noted. Major Areas Inspected:Announced Insp Included Onsite Review Selected Aspects of Design Change Functions Program, Radiation Protection Program IR 05000128/19992011999-07-0909 July 1999 Insp Rept 50-128/99-201 on 990608-10.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of C/A Previously Committed to by Licensee IR 05000070/19992011999-07-0101 July 1999 Insp Repts 50-070/99-201,50-073/99-201 & 50-183/99-201 on 990607-10.No Violations Noted.Major Areas Inspected: Operation Program,Organizational Structure & Functions Program IR 05000186/19992011999-07-0101 July 1999 Insp Rept 50-186/99-201 on 990607-11.Violations Noted.Major Areas Inspected:Operations Program,Organizational Structure & Functions Program,Design Control Program,Review & Audit Program,Fuel Handling Program & Experimental Program IR 05000166/19992011999-06-14014 June 1999 Insp Rept 50-166/99-201 on 990517-20.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Operations,Review & Audit Program,Rp Program,Operator Requalification Program,Surveillance Program & Experiments IR 05000336/19982191999-06-10010 June 1999 Insp Rept 50-336/98-219 on 981214-18,990126-29,0208-19 & 0301-05.Noncited Violations Identified.Major Areas Inspected:Exam of Licensee Corrective Action Implementation IR 05000123/19992011999-06-0909 June 1999 Insp Rept 50-123/99-201 on 990517-20.No Violations Noted. Major Areas Inspected:Review of Selected Aspects of Operations Program,Organizational Structure & Functions Program,Design & Control Program & Review & Audit Program IR 05000113/19992011999-06-0909 June 1999 Insp Rept 50-113/99-201 on 990504-07.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of C/A Previously Committed to by Licensee & Discussions with Personnel IR 05000243/19992011999-06-0707 June 1999 Insp Rept 50-243/99-201 on 990510-13.No Violations Noted. Major Areas Inspected:Onsite Review of Selected Aspects of Organizational Structure,Review & Audit Program,Radiation Protection Program,Safeguards Program & Security Program IR 05000607/19992011999-06-0303 June 1999 Insp Rept 50-607/99-201 on 990330-0401.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000002/19992011999-05-27027 May 1999 Insp Rept 50-002/99-201 on 990503-06.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Operations,Design Control,Review & Audit,Operator Requalification,Maint,Surveillance & Procedures IR 05000182/19992011999-05-0606 May 1999 Insp Rept 50-182/99-201 on 990412-15.No Violations Noted. Major Areas Inspected:Operations,Organizational Structure & Functions,Design Control,Review & Audit,Radiation Protection & Environ Protection Programs ML20206M8571999-05-0606 May 1999 Insp Rept 99901339/99-201 on 990405-06.No Violations or Deviations Noted.Major Areas Inspected:Procedures & Representative Records,Interviewed Personnel & Observed Activities IR 05000062/19992011999-05-0606 May 1999 Insp Rept 50-062/99-201 on 990414-16.No Violations Noted. Major Areas Inspected:Radiation Protection & Transportation IR 05000005/19992011999-04-22022 April 1999 Insp Rept 50-005/99-201 on 990322-26.No Violations Noted. Major Areas Inspected:Selected Aspects of Operations Program,Physical Security Program,Radiation Protection Program & Operator Requalification Program ML20205R3271999-04-21021 April 1999 Insp Rept 99900003/99-201 on 990322-25.Violations Noted. Major Areas Inspected:Activities Related to Manufacture & Testing of Nuclear Fuel & Related Components IR 05000193/19992011999-04-0707 April 1999 Insp Rept 50-193/99-201 on 990322-26.No Violations Noted. Major Areas Inspected:Licensee Programs Re Operations,Health Physics & Security IR 05000131/19992011999-04-0707 April 1999 Insp Rept 50-131/99-201 on 990315-17.No Violations Noted. Major Areas Inspected:Organization,Operations & Maint IR 05000326/19992011999-03-25025 March 1999 Insp Rept 50-326/99-201 on 990223-25.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000146/19992011999-03-22022 March 1999 Insp Rept 50-146/99-201 on 990216-18.No Violations Noted. Major Areas Inspected:Plant Status,Including Dismantlement Activities,Odcm & Calibr of Effluent Radiation Monitoring Sys & Flow Rate Monitors IR 05000284/19992011999-03-12012 March 1999 Insp Rept 50-284/99-201 on 990302-04.No Violations Noted. Major Areas Inspected:Review of Various Aspects of Licensee Programs Re Conduct of Operations & Emergency Preparedness IR 05000022/19992011999-03-0505 March 1999 Insp Rept 50-022/99-201 on 990201-03.No Violations Noted. Major Areas Inspected:Various Aspects of Reactor Operations, Maint,Safety & Emergency Preparedness Program IR 05000150/19992011999-03-0404 March 1999 Insp Rept 50-150/99-201n on 990208-12.No Violations Noted. Major Areas Inspected:Aspects of Organization,Periodic & Special Repts,Operations,Maint,Operations & Maint Procedures,Requalification Training & EP IR 05000297/19992011999-03-0202 March 1999 Insp Rept 50-297/99-201 on 990209-12.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Included Onsite Review of Various Aspects of Licensee Programs Concerning Conduct of Operations & Emergency Preparedness IR 05000602/19982011999-03-0202 March 1999 Insp Rept 50-602/98-201 on 981207-11.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of C/A Previously Committed to by Licensee IR 05000288/19992011999-02-0909 February 1999 Insp Rept 50-288/99-201 on 990125-28.No Violations Noted. Major Areas Inspected:Conduct of Operations & Emergency Preparedness IR 05000020/19982031999-02-0101 February 1999 Insp Rept 50-020/98-203 on 981207-10.No Violations Noted. Major Areas Inspected:Radiological Control During Major Facility Mod Projects IR 05000245/19982171999-01-22022 January 1999 Evaluation Repts 50-245/98-217,50-336/98-217 & 50-423/98-217 Conducted on 981026-30.Areas Evaluated:Whether NNECO Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ ML20199L7031999-01-22022 January 1999 Insp Rept 99901043/98-01 on 981014-15 & 1028-29. Noncompliance Noted.Major Areas Inspected:Insp Testing & Repair/Rework of Six 4.16-kV W Type 50DHP350,1200-ampere, Circuit Breakers of Ten Recently Built IR 05000243/19982021999-01-0404 January 1999 Insp Rept 50-243/98-202 on 981130-1203.No Violations Noted. Major Areas Inspected:Onsite Review of Various Aspects of Licensee Programs Concerning Conduct of Operations & EP ML20198E7611998-12-22022 December 1998 Insp Rept 99901336/98-01 on 981123-25.No Violations Noted. Major Areas Inspected:Performance Based Insp of Activities at Facility in Warrington,Pa IR 05000186/19982021998-12-21021 December 1998 Insp Rept 50-186/98-202 on 981116-20.No Violations Noted. Major Areas Inspected:Rp,Environ Monitoring,Transportation Activities,Physical Security,Matl Control & Accountability, Inspector Identified Violation Follow Up & Event Repts IR 05000146/19982041998-12-16016 December 1998 Insp Rept 50-146/98-204 on 981013-1106.No Violations Noted. Major Areas Inspected:Large Component Removal Project ML20198A8211998-12-14014 December 1998 Insp Rept 99900104/98-01 on 980921-25 & 1116-17. Noncompliance Noted.Major Areas Inspected:Conformance of Fabrication & Exam Activities of Nrc,Asme Code & Customer Requirements ML20197H6051998-12-0909 December 1998 Insp Rept 50-062/98-202 on 981116-19.Violations Noted. Major Areas Inspected:Review of Selected Aspects of Licensee Organization,Operations & Maintenance Activities,Safegurads & Security Program & Matl Control & Accounting Program IR 05000128/19972011998-12-0808 December 1998 Insp Rept 50-128/97-201 on 971103-05 & 981102-05.No Significant Safety Issues Were Identified.Major Areas Inspected:Selected Conditions & Records Since Last Insp, Verification of C/As & Actions Re Reportable Occurences IR 05000228/19982011998-12-0202 December 1998 Insp Rept 50-228/98-201 on 981102-05.Violations Noted.Major Areas inspected:on-site Review of Selected Aspects of Licensees Class II non-power Reactor Operation Including Organization & Staffing & Review & Audit Functions 1999-09-08
[Table view]Some use of "" in your query was not closed by a matching "". Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000027/19992011999-10-0606 October 1999 Insp Rept 50-027/99-201 on 990817-20.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions Programs ML20212L2771999-10-0404 October 1999 Notice of Nonconformance from Insp on 990816-20. Nonconformance Noted:Inspectors Identified Listed Six Open Ncrs Initiated in 1998 & Did Not Include Timely Resolution & Disposition to Completion ML20212L2831999-10-0404 October 1999 Insp Rept 99901341/99-201 on 990816-20.Non Compliance Noted. Major Areas Inspected:Tva Central Labs & Field Testing Svcs Activities for Calibration of Measuring & Test Equipment & Activities Re Metallurgical Testing & Matl Failure Analysis IR 05000146/19992021999-10-0404 October 1999 Insp Rept 50-146/99-202 on 990830-0902.No Violations Noted. Major Areas Inspected:Onsite Review of Selected Aspects of Organizational Structure & Functions Program,Emergency Preparedness,Fire Protection Program & Facility Inspections IR 05000188/19992011999-09-24024 September 1999 Insp Rept 50-188/99-201 on 990830-0902.No Violations Noted. Major Areas Inspected:Review of Selected Aspects of Operations Program,Organizational Structure & Functions Program,Design Control Program & Review & Audit Program ML20212A8531999-09-13013 September 1999 Notice of Violation from Insp on 990712-30.Violation Noted: from 980324-990730,TS SR 3.5.1.4 & 3.5.2.5 Failed to Require Each ECCS Pump to Develop Pump Differential Pressure Greater than or Equal to ECCS Total Flow Resistance ML20211N6411999-09-0808 September 1999 Insp Rept 99900401-201 on 990330-0701.Noncompliance Noted. Major Areas Inspected:Quality Assurance Program ML20211N6361999-09-0808 September 1999 Notice of Nonconformance from Insp on 990630-0701. Nonconformance Noted:Licensee Had Not Performed Suitable Qualification Testing of Representative Sample or Performed Analysis to Demonstrate Environ Qualification IR 05000228/19992011999-09-0202 September 1999 Insp Rept 50-228/99-201 on 990816-19.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Was on-site Review of Selected Aspects of Licensee Class II non-power Reactor Operation IR 05000116/19992011999-09-0101 September 1999 Insp Rept 50-116/99-201 on 990810-12.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Operations,Design Control,Review & Audit,Environ Protection, Radiation Protection Operator Requalification & Maint IR 05000160/19992031999-08-30030 August 1999 Insp Rept 50-160/99-203 on 990119-21.No Violations Noted. Major Areas Inspected:Organization & Staffing & Proposed Decommissioning Activities IR 05000057/19992011999-08-19019 August 1999 Insp Rept 50-057/99-201 on 990802-04.Violations Noted. Major Areas Inspected:Review of Selected Aspects of Organizational Structure & Functions Program,Radiation Protection Program & Surveillance Program ML20211A7841999-08-19019 August 1999 Notice of Violation from Insp on 990802-04.Violation Noted: Rept Not Submitted for Balance of 1997 & CY98 ML20211H0891999-08-19019 August 1999 Notice of Violation from Insp on 990628-0811.Violation Noted:Periodic Assessment Conducted for Period of November 1996 Through May 1998 Did Not Adequately Evaluate Maint Activities as Listed ML20217H8791999-08-16016 August 1999 NRC Operator Licensing Exam Rept 50-002/OL-99-01 (Including Completed & Graded Tests) for Tests Administered on 990719- 21.Exam Administered to One RO & One Sro.Ro Failed Written Portion of Exams IR 05000274/19992011999-08-16016 August 1999 Insp Rept 50-274/99-201 on 990713-16.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Experiments,Operations,Fuel Handling,Safeguards,Procedures, Operator Requalification,Review & Audit & Surveillance IR 05000264/19992011999-08-10010 August 1999 Insp Rept 50-264/99-201 on 990712-15.No Violations Noted. Major Areas Inspected:Operations Program,Organizational Structure & Functions Program,Design Control Program,Review & Audit Program & Radiation Protection Program ML20210L7211999-08-0505 August 1999 Insp Rept 99900403/99-201 on 990720.No Violations or Deviations/Noncompliance Noted.Major Areas Inspected: Documentation Re Fabrication of Reactor Pressure Vessel Surveillance Specimens & Surveillance Capsules IR 05000097/19992011999-08-0404 August 1999 Insp Repts 50-097/99-201 & 50-157/99-201 on 990426-30.No Violations Noted.Major Areas Inspected:Onsite Review of Selected Aspects of Operations Program,Organizational Structure & Review & Audit Program ML20210J7151999-07-30030 July 1999 Notice of Violation from 990416 Discussion.Violation Noted: from 990128-0406,Quality Consultants & Inspections,Inc Used Iridium-192 in Missouri,Non-Agreement State Without Specific License Issued by NRC & Without Filing Form 241 with NRC IR 05000020/19992011999-07-30030 July 1999 Insp Rept 50-020/99-201 on 990628-0701.No Violations Noted. Major Areas Inspected:Announced Insp Included Onsite Review Selected Aspects of Design Change Functions Program, Radiation Protection Program ML20210C3781999-07-20020 July 1999 Notice of Violation from Insp on 990318.Violations Noted: on 980224,individual Attempted to Enter Protected Area of Plant with Firearm.Search Equipment Operator Failed to Failed to Secure Item & Prevent Access ML20210D0991999-07-16016 July 1999 Notice of Violation from Insp on 990608.Violation Noted: Between 990109 & 0410,Weldtek Testing Labs,Used Iridium 192 on Army Depot in Anniston,Alabama,Area of Exclusive Federal Jurisdiction within as Without Filing NRC Form 241 IR 05000128/19992011999-07-0909 July 1999 Insp Rept 50-128/99-201 on 990608-10.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of C/A Previously Committed to by Licensee IR 05000070/19992011999-07-0101 July 1999 Insp Repts 50-070/99-201,50-073/99-201 & 50-183/99-201 on 990607-10.No Violations Noted.Major Areas Inspected: Operation Program,Organizational Structure & Functions Program IR 05000186/19992011999-07-0101 July 1999 Insp Rept 50-186/99-201 on 990607-11.Violations Noted.Major Areas Inspected:Operations Program,Organizational Structure & Functions Program,Design Control Program,Review & Audit Program,Fuel Handling Program & Experimental Program ML20196K0261999-06-28028 June 1999 Notice of Violation from Insp on 990616.Violation Noted: Individual Operating Moisture/Density Gauge Containing Licensed Matl in Vicinity of Fond-Du-Lac,WI,did Not Possess Whole Body Radiation Nonitoring Divice ML20196D4851999-06-21021 June 1999 Partially Deleted Notice of Violation from Insp on 990204. Violation Noted.Ed Mccormic,Individual Licensed Operator, Violated 10CFR50.53(j) by Use of Illegal Drug (Marijuana) as Evidence by Confirmed Positive Test for Urine on 981222 IR 05000166/19992011999-06-14014 June 1999 Insp Rept 50-166/99-201 on 990517-20.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Operations,Review & Audit Program,Rp Program,Operator Requalification Program,Surveillance Program & Experiments IR 05000336/19982191999-06-10010 June 1999 Insp Rept 50-336/98-219 on 981214-18,990126-29,0208-19 & 0301-05.Noncited Violations Identified.Major Areas Inspected:Exam of Licensee Corrective Action Implementation IR 05000113/19992011999-06-0909 June 1999 Insp Rept 50-113/99-201 on 990504-07.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of C/A Previously Committed to by Licensee & Discussions with Personnel IR 05000123/19992011999-06-0909 June 1999 Insp Rept 50-123/99-201 on 990517-20.No Violations Noted. Major Areas Inspected:Review of Selected Aspects of Operations Program,Organizational Structure & Functions Program,Design & Control Program & Review & Audit Program IR 05000243/19992011999-06-0707 June 1999 Insp Rept 50-243/99-201 on 990510-13.No Violations Noted. Major Areas Inspected:Onsite Review of Selected Aspects of Organizational Structure,Review & Audit Program,Radiation Protection Program,Safeguards Program & Security Program ML20207G8511999-06-0707 June 1999 Notice of Violation from Investigation Rept A4-1998-042 on 990127.Violation Noted:After 980528,ES Feemster,Initiated Reactor Simulator Training Attendance Record Indicating Attendance at 980528 Training Session Not Attended IR 05000607/19992011999-06-0303 June 1999 Insp Rept 50-607/99-201 on 990330-0401.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20195J4851999-06-0303 June 1999 NRC Operator Licensing Exam Rept 50-128/OL-99-01 (Including Completed & Graded Tests) for Tests Administered on 990405- 06.Exam Results:Both Candidates Failed Written Portion of Exams IR 05000002/19992011999-05-27027 May 1999 Insp Rept 50-002/99-201 on 990503-06.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Operations,Design Control,Review & Audit,Operator Requalification,Maint,Surveillance & Procedures ML20195K1151999-05-25025 May 1999 NRC Operator Licensing Initial Exam Rept 50-156/OL-99-01 (Including Completed & Graded Tests) for Tests Administered on 990517-20 ML20207F1521999-05-25025 May 1999 Notice of Violation from Investigation Rept 1-94-021 on 940506-960329.Violation Noted:Between 740831-910407,licensee Made Changes to Facility Described in Safety Analysis Rept for Refueling Core Offloads Without Performing Evaluation IR 05000288/19990011999-05-24024 May 1999 NRC Operator Licensing Exam Rept 50-288/99-01 (Including Completed & Graded Tests) for Tests Administered on 990503-06 IR 05000062/19992011999-05-0606 May 1999 Insp Rept 50-062/99-201 on 990414-16.No Violations Noted. Major Areas Inspected:Radiation Protection & Transportation IR 05000182/19992011999-05-0606 May 1999 Insp Rept 50-182/99-201 on 990412-15.No Violations Noted. Major Areas Inspected:Operations,Organizational Structure & Functions,Design Control,Review & Audit,Radiation Protection & Environ Protection Programs ML20206M8571999-05-0606 May 1999 Insp Rept 99901339/99-201 on 990405-06.No Violations or Deviations Noted.Major Areas Inspected:Procedures & Representative Records,Interviewed Personnel & Observed Activities IR 05000005/19992011999-04-22022 April 1999 Insp Rept 50-005/99-201 on 990322-26.No Violations Noted. Major Areas Inspected:Selected Aspects of Operations Program,Physical Security Program,Radiation Protection Program & Operator Requalification Program ML20205R3171999-04-21021 April 1999 Notice of Violation from Insp on 990322-25.Violation Noted: Lab Analyst Failed to Perform Over 20 Required Weekly Calibrations of Leco Hydrogen Analyzer During Period of Apr 1996 - Mar 1999 ML20205R3271999-04-21021 April 1999 Insp Rept 99900003/99-201 on 990322-25.Violations Noted. Major Areas Inspected:Activities Related to Manufacture & Testing of Nuclear Fuel & Related Components IR 05000131/19992011999-04-0707 April 1999 Insp Rept 50-131/99-201 on 990315-17.No Violations Noted. Major Areas Inspected:Organization,Operations & Maint IR 05000193/19992011999-04-0707 April 1999 Insp Rept 50-193/99-201 on 990322-26.No Violations Noted. Major Areas Inspected:Licensee Programs Re Operations,Health Physics & Security IR 05000326/19992011999-03-25025 March 1999 Insp Rept 50-326/99-201 on 990223-25.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000146/19992011999-03-22022 March 1999 Insp Rept 50-146/99-201 on 990216-18.No Violations Noted. Major Areas Inspected:Plant Status,Including Dismantlement Activities,Odcm & Calibr of Effluent Radiation Monitoring Sys & Flow Rate Monitors 1999-09-08
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
U.S. NUCLEAR REGULATORY COMISSION OFFICE OF NUCLEAR REACTOR REGULATION Report No: 99901308/96-01 Organization: Ellis & Watts Division of Dynamics Corporation of America
Contact:
Craig Hunt, QA Manager 513/752-9000 Nuclear Industrv Heating, ventilation, and air conditioning (HVAC)
Activity: systems and associated spare and replacement parts Dates: December 2-6, 1996 Inspector: Anil S. Gautam, Senioa Engineer Approved by: Gregory C. Cwalina, Chief Vendor Inspection Section Special Inspection Branch Division of Inspection and Support Programs Enclosure 3 ,
l 9702130295 970210 l PDR GA999 EMVDYNAM 99901308 PDR
1 INSPECTION SUNNARY I
During this inspection, the NRC inspector reviewed activities associated with implementation of selected portions of Ellis & Watts' (E&W's) quality assurance (QA) program and licensee monitoring or E&W's control of quality.
The inspection bases were as follows:
= Appendix B, " Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," to Part 50 of Title 10 of the Code of Federal Reaulations (10 CFR Part 50).
=
NRC Regulatory Guide 1.144, " Auditing of Quality Assurance Programs for Nuclear Power Plants."
E&W's Quality Assurance Manual QC-4000N, Revision 7, dated September 7, 1995, and associated implementing procedures.
During this inspection, a violation of NRC requirements was identified. The violation is discussed in Section 3.1 of this report. In addition, the inspector noted three instances in which E&W failed to conform to NRC requirements imposed upon it by NRC licensees. This nonconformance is discussed in Section 3.1 of this report.
2 STATUS OF PREVIOUS INSPECTION FINDINGS This was the first NRC inspection of E&W.
3 INSPECTION FINDINGS AND OTHER CONNENTS 3.1 Quality Assurance Proaram
- a. Inspection Scope The inspector examined E&W's QA program, policy, implementing procedures, conformance to procurement documents, corrective actions in response to licensee audit findings, commercial-grade item dedication, Part 21 evaluations, and monitoring of subvendors.
- b. Observations and Findinas E&W's QA staff comprised the QA manager, two quality engineers, three QA shop inspectors, and six test technicians. The QA manager reported directly to the president of E&W.
The inspector observed that E&W's procedure QA-112, " Compliance to Regulation 10 CFR Part 21 Procedure," Revision 3, failed to address the identification or evaluation of " deviations" from procurement document requirements. As a result, personnel were not alerted to the need to identify deviations from safety-related purchase order requirements, and 2
l .-
l to evaluate the deviations to determine if they could become defects.
Part 21 requires adopting appropriate procedures to evaluate deviations to identify defects and failures to comply associated with substantial safety hazards. Failure to adopt appropriate procedures, as required by 10 CFR Part 21.21, constitutes Violation 99901308/96-01-01. Based on E&W's December 30, 1996, letter to the NRC, the QA manager revised procedure QA-112 to address evaluation of deviations and require pertinent training for appropriate employees. No further response is required.
The inspector observed that E&W's Nonconformance/ Deviation Control Procedure Form QC-12, " Request for Material Disposition," for documenting
" major nonconformances," did not address screening of issues for Part 21 applicability. Based on E&W's December 30, 1996, letter to the NRC, the QA manager revised Form QC-12 to address Part 21 applicability. No further response is required.
The inspector observed that QA-ll2, Revision 3, page 5, stated, in part, that Part 21 regulations were on file for employee "off-shift review in the QA department during work breaks, and after working hours." The inspector was concerned that the procedure would discourage or prevent employees from adequately reviewing or implementing Part 21. Based on E&W's December 30, 1996, letter to the NRC, the QA manager revised QA-112 to remove restrictive instructions so that employees would review Part 21 ,
regulations and procedures during work hours. No further response is '
required.
E&W issued Part 21 report No. 101, dated August 20, 1994, to address deficiencies in the design pressure ratings of four air conditioner units (ACUS) supplied by E&W to the Tennessee Valley Authority (TVA) for the Browns Ferry Nuclear Plant. The shell side pressure rating of the installed ACU condensers was less than the minimum pressure necessary.
The deficiencies resulted in coolant leaking from the ACU condensers. In February 1995, TVA audited E&W's QA program and identified deficiencies in the design and configuration control of the ACUS. On the basis of E&W's April 28, 1995, letter in response to TVA's findings, the inspector observed that E&W believed the defects in the ACUS to be a result of errors in TVA's design documents. QC-4000N, Section 3, " Design Control,"
Revision 7, paragraph 3.1.6, requires product design to be verified by .
E&W for adequacy of the design and the verification or checking process l to be performed by individuals or groups other than those who performed '
the original design. E&W's failure to verify the adequacy of design, as ;
required by Criterion III, " Design Control," of Appendix B to 10 CFR Part '
50, constitutes Nonconformance 99901308/96-01-02.
The inspector assessed E&W's design control and commercial-grade dedication activities by evaluating purchase orders (P0s) from Texas Utilities Electric Company (TUEC), TVA, and Duquesne Light Company (DLC) to E&W for the following items:
l l 3 l
l life Licens_e_e Licensee P0 No. P.O. Date Coil fan assembly TUEC S013040056D1 July 25, 1994 011 pump TVA P-94N2S-105874-000 March 25, 1994 l Thermal expansion valve TVA P-94N2S-115662-000 September 19, 1994 l Gasket TVA P-94N2S-105639-000 March 18, 1994
- Pressure switch DLC D134982 November 3, 1994 i
l The inspector assessed E&W's commercial-grade dedication documents for l the above items, including review and analysis of intended safety functions, identification and verification of critical characteristics (equipment performance features identified in licensee procurement specifications and E&W's dedication documents), tests conducted to verify characteristics, and any failures during testing. The inspector observed that dedication plans did not address verification of the following critical characteristics:
- that cooling coil fans would operate during tornado conditions at a reduced pressure of 11.7 psia at the Comanche Peak Steam Electric Station.
= that an oil pump would develop a minimum oil pressure of 11 psi at the Browns Ferry Nuclear Plant.
- that a thermostatic expansion valve would provide the required flow of liquid refrigerant to the evaporator coil at the specified accident temperature at the Browns Ferry Nuclear Plant.
= that a ga&t for oil pump and bearing assembly would perform its safety function without degradation during the specified accident i temperature at the Browns Ferry Nuclear Plant.
E&W stated that the items were qualified based on certificates of conformance (C0Cs) from subvendors but could not provide test documentation for the above characteristics. The inspector contacted TUEC and TVA to determine whether the above items were qualified to perform their intended safety functions. On the basis of a preliminary analysis, the licensees reported no operability concerns associated with the installed items. E&W's failure to implement measures to assure review for suitability of application of materials, parts, equipmen+,, and processes that are essential to the safety-related functions of systems and components, as required by Criterion III, " Design Control," of Appendix B to 10 CFR Part 50, constitutes Nonconformance 99901308/96-01-03.
The inspector observed that there were continuing deficiencies in E&W's i dedication program. The Nuclear Utilities Procurement Issues Committee l (NUPIC) audited E&W in August 1995, to determine, in part, whether E&W ,
had established and effectively implemented a QA program in compliance !
with 10 CFR 50 Appendix B. NUPIC identified deficiencies in the areas of design control, configuration control, and commercial-grade dedication.
Deficiencies included E&W's failure to reference materials as a critical attribute during dedication, and to verify the validity of certified material test reports (CMTRs) and C0Cs supplied by E&W's commercial-grade L
4
1 1
subvendors. In April 1996, NUPIC audited E&W's corrective actions and again identified deficiencies in E&W's dedication program, including E&W l not identifying materials as a critical attribute and not verifying the l validity of CMTRs. E&W failed to establish effective corrective action for deficiencies in its commercial-grade dedication activities that were identified by NUPIC. Similarly, documents reviewed by the inspector regarding E&W's dedication activities did not address verification of l
certain critical characteristics. The inspector concluded that E&W's continuing failure to assure that conditions adverse to quality are ;
promptly corrected and that corrective actions are taken to preclude i repetition, as required by Criterion XVI, " Corrective Action," of 1 Appendix B to 10 CFR Part 50, constitutes Nonconformance 99901308/96 i
- 04. i E&W implemented measures to identify nonconforming items by applying l appropriate tags. However, the inspector observed a lack of physical segregation between safety-related items and non-safety-related items in storage and staging areas. Criterion XV, " Nonconforming materials, parts or components," of Appendix B to 10 CFR Part 50, requires segregation of nonconforming materials, parts or components to prevent their inadvertent l use or installation. QC-4000N, Section 15, " Nonconforming Materials, Parts or Components," Revision 7, paragraph 15.2.2, states, in part, that i storage areas for nonconforming items shall be segregated. Based on '
E&W's December 30, 1996, letter to the NRC, E&W fabricated and installed a bonded locked cage to segregate nuclear non-conforming materials during l
" receiving inspection." E&W also reported that it was in the process of establishing a locked segregated and controlled area for storage of nuclear material. No further response is required.
The inspector observed that TUEC's P0 S013040056D1 to E&W, dated July 7, 1994, included an agreement between E&W and TUEC to inform the licensee immediately of any allegations of discrimination (Section 211 of the ,
Energy Reorganization Act of 1974) filed by an E&W employee or fermer '
employee with a Federal, State, or local administrative agency, in connection with E&W's activity related to the Comanche Peak Steam Electric Station. The inspector determined that TUEC included such agreements in its P0s to increase TUEC's efforts in responding to allegations of discrimination filed by vendor employees. These efforts included monitoring the adequacy of the vendor's investigation and actions to achieve a remedy (as indicated by the Commission in its Statement of Policy [61 FR 24336], " Freedom of Employees in the Nuclear Industry to Raise Safety Concerns Without Fear of Retaliation," dated May 14, 1996). At the exit meeting, the inspector expressed concern that the agreement, as delineated in the P0, could inadvertently discourage an E&W employee from engaging in protected activity (as described in 10 CFR Part 50.7 (a)(1)(1)), for fear of retaliation from TUEC. However, after further review of the above policy statement, the NRC determined that the P0 agreement was appropriate, and was consistent with the Commission Policy Statement referenced above. The inspector subsequently informed the vendor that the P0 agreement was appropriate, and was not in
. violation of NRC requirements. E&W stated that it would take measures to l inform employees that the P0 agreement was meant to protect, rather than l intimidate, employees who raised safety concerns. No further concerns j were identified.
l 5
, .o
[
- c. Conclusions 1 The QA manual and procedures were adequate, except for the violation and P
nonconformances described herein. Problems with dedication plans i
- reviewed indicated a weakness in the areas of design control and commercial-grade dedication.
3.2 Review of Monitorino of E&W by Licensees i
- a. Inspection Scope The inspector evaluated licensee monitoring of E&W's control of quality j
for safety-related items purchased by licensees, including audits and surveillances of E&W's commercial-grade dedication, Part 21 reports, and i monitoring of subvendors.
- b. Observations and Findinas The inspector contacted TVA, TUEC, DLC, and Carolina Power & Light (CP&L) to discuss the scope and findings of their audits and surveillance of E&W. i 1
TVA audited E&W in February 1995, to evaluate, in part, the defects TVA identified in the ACUS supplied by E&W for the Browns Ferry Nuclear i Station, Units 1 and 3. TVA determined that E&W had deficiencies in the :
areas of design control and configuration control. TVA made two l findings: a lack of formalized design analysis review affecting equipment ,
installed in Units 1 and 3, and inadequate control of changes to design i documents. In February 1996, TVA accepted E&W's corrective actions but l
imposed procurement restrictions, one of which was that TVA review E&W's ;
design for any new purchases.
NUPIC audited E&W in August 1995. The utilities represented on the NUPIC audit team included CP&L (team leader), TVA, and Niagara Mohawk Power l Corporation. The scope of the audit, in part, was to verify whether E&W 1 had established and effectively implemented a QA program in compliance with the requirements of 10 CFR Part 50 Appendix B and other industry standards. NUPIC concluded that E&W's QA program was " weak and partially ineffective" and made eight finjings concerning E&W's QA program: (1) weak design control measures not assuring documented independent evaluations of materials and engineering changes, (2) computer software not controlled in accordance with E&W procedures, (3) various deficiencies in the monitoring of subvendors, (4) unqualified welder, (5) inadequate 1994 and 1995 internal audits and related corrective actions, (6) inadequate measures for traceability of weld filler material, (7) inadequate storage facilities for quality documents, and (8) lack of implementation of procurement requirements of one P0. NUPIC recommended that utilities explicitly communicate to E&W their expectations in the ;
area of commercial-grade dedication through their purchase orders, and require E&W to provide objective evidence of dedication for review by the utility at receipt.
In March 1996, NUPIC (represented by CP&L) examined E&W's corrective actions in response to NUPIC's August 1995 findings. NUPIC found continuing deficiencies in E&W's dedication documents for commercial-i 6
l 1
i grade items. For example, certain dedication plans did not identify j materials as critical attributes and did not verify the validity of the certified material test reports. NUPIC concluded that E&W had not developed a comprehensive program to control purchased material and equipment, and ensure that all critical attributes were adequately verified during commercial grade surveys. NUPIC recommended that :
licensees perform detailed verification of E&W's design reviews and !
surveillance before and during performance of work for future orders. !
, CF&L retained E&W on its list of approved suppliers with these ,
procurement restrictions: that CP&L verify the design of any new purchases, that CP&L approve E&W's dedication plan for commercial-grade spare parts prior to E&W's performance of work, and that E&W verify the validity of C0Cs or CMTRs for material purchased through subvendors who did not have provisions for material verification.
TUEC and DLC's monitoring of E&W was based on the results of the NUPIC audits. DLC provided the inspector a copy of their evaluation of how NUPIC's audit applied to DLC's purchases. No concerns were identified.
- c. Conclusions In general, 1.icensees effectively audited E&W in accordance with proper criteria, procedures, and checklists. Licensees continue to have concerns regarding E&W's design control and commercial-grade dedication activities despite E&W's corrective actions.
3.3 Entrance and Exit Meetinas In the entrance meeting on December 2, 1996, the NRC inspector discussed the scope of the inspection, outlined the areas to be inspected, and I established interactions with E&W management. In the exit meeting on December 6, 1996, the inspector discussed his findings and observations.
I l
I I 7
l
-. -- -_- _ - . - - - _ - - - . - . - _ _ - - - - _ . . - - = _ .
4 PERSONNEL CONTACTED E
i Craig Hunt, QA Manager Roger Schertler, QA Engineer Jim York, Manager, Special Projects Richard Porco, Manager, Engineering '
-Licensees (contacted by telephone) l Danny Leigh, Plant Overview Supervisor, TUEC John Taylor, Procurement Engineer, TUEC Hrach Minassian, Procurement Engineer, TUEC ,
William Sidberry, Senior Analyst, CP&L '
R.G. Newsome, NUPIC Team Leader, CP&L James Johns, Supervisor Quality Services, DLC Larry Spiers, Procurement Engineer, TVA ITEMS OPENED, CLOSED, AND DISCUSSED Opened 99901308/96-01-01 NOV inadequate Part 21 procedure 99901308/96-01-02 NON inadequate design control 99901308/96-01-03 NON inadequate design control 99901308/96-01-04 NON inadequate corrective action Closed 99901308/96-01-01 NOV inadequate Part 21 procedure i
i 8 l